If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-009-23819 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.2883214073,"lon":-81.9106096507,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-07-09 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 1 | |
Latitude: 39.2883214073 | |
Longitude: -81.9106096507 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1070148011 | 2012-07-05 | The pit is being constructed and the conductor will be set tomorrow morning. | ||||
-1273037103 | 2012-09-27 | The pits have been closed. The pumping unit has been set and two 210 Barrel tanks are on site colleting flow-back water. | ||||
-1638573758 | 2012-07-10 | Received call from R. Wolfe letting me know rig encountered large show of gas in the first Berea. Finished drilling 8 7/8" hole for intermediate string to 1600 feet. Formation Cementing was brought on site to pump gel to stabilize well. 48 sacks of gel were pumped at a rate of 4 Barrels per minute. Rate was insufficient and Superior Well service was called. | ||||
-1768686907 | 2012-07-12 | Witnessed Blow-out preventer (BOP) test. After several attempts, the BOP held 500 psi. for 15 minutes. | ||||
-2005319615 | 2012-07-11 | 1574 feet of new 7" and 17lb/ft intermediate casing set in 1600 feet of 8 7/8 " wellbore with 250 sacks of class A cement. 600 lb Bentonite gel, 600 lb CaCl, and 70 lb celloflake used as additives. Cement was circulated to the surface and stayed at the surface. The lift pressure was 500 pounds. | ||||
-281072019 | 2012-07-16 | Total Depth reached at 6200 feet. Well will be logged this evening and the longstring will be run tomorrow. Gas had created a micro annulus around the intermediate casing. I spoke with the company about installation of a well head to control the gas. | ||||
-50550464 | 2012-07-11 | A mixture of 50 sacks Salt gel, 25 sacks of 50 lb starch, and 160 sacks of Barite were mixed with 120 Barrels of water and pumped down the well at 8 Barrels per minute to successfully stabilize the well. | ||||
-975708628 | 2012-07-24 | I had spoken to Randy Wolfe about placing a pressure gauge and a pop-off valve on the surface-intermediate annular space on 7/19/12. The well did not have this equipment on it as of the time of inspection. | ||||
1155791366 | 2012-07-10 | Currently drilling at 12227 feet. Plan to set intermediate string this evening. | ||||
1192195969 | 2013-03-01 | Follow up to 1237419020. Casing still on site. Dike not done yet. Gauge on surface and intermediate casing reads 0 psi. | ||||
1237419020 | 2013-02-01 | The pits have been closed and there is adequate vegetative cover. There is a small pile of casing on site including 4 1/2" production casing, conductor, rods, and 2" tubing. Failure to remove drilling equipment with in two months after completion. All equipment used in drilling shall be removed from the site. | NONE5 | |||
1340226600 | 2012-06-20 | Pre-site review with R. Wolfe. | ||||
1341589896 | 2012-07-06 | Twenty five feet of 13 3/8" conductor set in 17" borehole today. Bedrock encountered at 15-20 feet. | ||||
1341839054 | 2012-07-09 | 60' of blow line staked out. Pit lined and fenced. Entry gated and signed. Currently drilling at 85'. | ||||
1341933080 | 2012-07-09 | 500 feet of 26 lb/ft 9 5/8 inch steel casing set in 540 feet of 12 1/4 inch borehole with 190 sack class A cement. Circulation established and good returns stayed at the surface. | ||||
1343228425 | 2012-07-25 | No pop-off or gauge on valve. I spoke with R. Wolfe and he let me know he'd be putting a gauge on the surface casing head later this week. | ||||
1343413013 | 2012-07-27 | No gauge or pop-off yet. | ||||
1343766936 | 2012-07-31 | Filling pit today. | ||||
1344872283 | 2012-08-13 | A gauge has been placed on the annular space between the surface casing and the intermediate casing. It read zero psi. | ||||
1347462396 | 2012-09-12 | Witnessed frac job. 50,000 gallons used to treat well in the Medina formation. Perforations from 4747'-4757'. Formation break at 2286 psi, Instantaneous Shut-In Pressure 478 psi, 5-minute Shut-In 450 psi. | ||||
1355861731 | 2012-12-18 | The pits have bee filled and there is adequate vegetative cover on site. There is still some drilling equipment on site. The dike is not finished yet. | ||||
1363702847 | 2013-03-19 | Follow up to 1237419020. The casing has been removed. | ||||
162659483 | 2012-07-11 | Superior well service was brought onto site to stabilize well. Two attempts were made to pump a gel mixture of 120 Barrels of water and 110 sacks of gel down the hole at a rate of 8 Barrels per minute. Neither attempt was successful so a barite additive will be brought in to thicken the gel. | ||||
314411928 | 2012-06-28 | Checking stake distance to road. |