X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-129-20227

Well Details

Well ID: 34-129-20227
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2009-08-10
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 39.617291907
Longitude: -82.9480984669

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1121015738 2009-08-19 - Drilling contactor Dow Bowman has started to rig down, Air pit has been closed, fluid pit to remain open until well is plugged. Operator has safety fence around fluid pit to restrict access.
-160179624 2009-08-17 - Drilling progress, Rig operating while on site, expect to hit target zone tomorrow morning.
-506748691 2010-05-20 Final Restoration, well permitted 7/08/2009 well plugged and abandon 9/22/2009.

- Area has been graded and vegetation has started to establish.

-698268271 2009-09-22 - Plugging well, Berry Well Service and Formation Cementing doing the work.

- 2 3/8 inch tubing place into well bore for setting plugs, 4 plugs set, Rose Run, Trenton, Base of the surface casing and surface. Good circulation when cement was pumped in to well. A total of 115 sacks of cement used.

1164310803 2009-08-14 - On location for surface casing, 8.75 inch hole drilled. 7 inch casing, casing is used, total length of casing 842' plus 10' landing joint. Good circulation, cement circulated to surface. Formation Cementing done cementing. 142 sacks with 3% CaCl.
1183347065 2009-08-18 - On location for drilling progress. Drilling has stopped, dry hole total depth 2696 feet,
1249928594 2009-07-29 - 7/25/09 received phone call from operator that construction of lease road, drill area site clear of soybeans and mark pit location will start on 7/28/2009.

- 7/29/2009 on site for inspection, operator has partly graded and stoned lease road from original access drive to drill location.

1251722653 2009-08-12 - On location for drilling progress, Drilling contactor having problem with setting conductor pipe, depth of hole 198'
1616236048 2009-08-10 - Operator had contacted in advance that drill was going to be on location 8/10/2009 and set to set up.

- on site drill and drilling equipment setup, pit being dug while on site. - signs are posted on location, porta potty on location for drill crew. - Drilling started in PM

2119370411 2009-08-06 - 8/04/2009 received phone call from operator that construction of lease road was completed, drill area site clear of soybeans.

- 8/06/2009 on site for inspection, operator has graded and stoned lease road from original access drive to drill location. Operator has installed orange safety fence to restrict access and form parking/turn around area.

657246874 2009-08-13 - On site for drilling progress, operator has conductor set and Formation Cementing, cementing conductor in place. Cement circulated to surface. 14.75 inch hole drilled, 9.625 inch conductor casing total of 206 feet of conductor.