If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-139-20741 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.9298329013,"lon":-82.6997422607,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2003-01-31 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.9298329013 | |
Longitude: -82.6997422607 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1422248238 | 2003-02-04 | Conductor casing cemented. Dill to 100 feet and set approximately 100 feet of 8 5/8 inch conductor casing. | ||||
-143672949 | 2003-03-12 | Inspect well. Well made up. Pit open. Production pipe run not connected. Pressure regulator is set to release built up gas and vent to the atmosphere at regular intervals. | ||||
-1880180627 | 2003-01-22 | Inspect site. Directional drilling. Well head is located in a wooded lot. Production will be below a field. | ||||
-598543633 | 2006-07-31 | Inspect well. Well shut-in. Weeds overgrowing well. Culvert pipe and gravel has been removed. | ||||
-614843529 | 2003-05-01 | Inspect site. Pit was filled as requested. | ||||
1044650244 | 2003-02-07 | Status check on drilling. Anticipated Surface casing. Action canceled for today. Bit and drill stem tripped out of hole. | ||||
1045603989 | 2003-02-18 | Drilling well. Collect GPS data. | ||||
1045695420 | 2003-02-19 | Complete Surface casing cementing. Place an 80 foot prefabricated pvc tremmi pipe into annulus of 5.5 inch surface casing and 8 5/8 inch conductor casing. Pushed tremmi pipe approximately 62 to 65 feet below grade until it hung up in the hole. Ordered 25 sacks of grout. Pump until grout came to surface. Copies of cement tickets will be mailed. | ||||
1299316149 | 2003-02-06 | Status check. Setup for directional drilling. Begin directional drilling at 160 feet. | ||||
1589285531 | 2009-11-04 | Inspect well. Location is grown over with limited access. Well is shut in. Operaotor is exploring fracing methods for well. | ||||
293974233 | 2005-07-06 | Inspect Well. | ||||
668091430 | 2003-04-29 | Inspect well and well site. Pit open, liner has been compromised. Collect water sample and test with Quantab, 3608 ppm. Contact Rick Carter, Baker Well. Request the pit be closed. Indicated would complete this action within 1.5 weeks. | ||||
677113634 | 2004-04-07 | Inspect Well. Well shut in. No id. No production line. Restoration has been performed. |