34-153-22966

Well Details

Well ID: 34-153-22966
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2006-08-03
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.0194009644
Longitude: -81.5599244234

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1038162884 2010-08-03 Annual inspection of this solution mining well found no violations at this time.
-1636208938 2007-01-04 On site to witness grouting of the annular space between the 7" and 10-3/4" casings with class A cement. The cement was spotted using 1" PVC tubing placed between the two casing strings to a depth of approximately 210'. Cement circulated to surface and stayed up.
-2048176757 2008-12-31 Annual status check inspection found no violations at this time.
-343060833 2013-06-24 The well was properly identified. My inspection was accompanied by Andrew Adgate.
-387801020 2009-06-18 Columbus requested an annual inspection of the solution mining wells. This inspection found no violations at this time.
-549700906 2007-01-08 On January 4, 2007, the annular space between the 10-3/4" and 7" casing was grouted with 51 sacks of class A cement from 210' to surface. This inspection confirmed that the job was successful and the cement stayed up and was present at the surface.
1179777310 2007-05-16 Preliminary restoration is due this month. The site still needs to be finish graded, topsoil spread, seeded and mulched.
1185915710 2007-07-25 Preliminary restoration is approved.
1319653325 2011-10-11 This inspection was completed as part of the required five year mechanical integrity test (MIT). The test well is the 7" production casing in Akron #73. The reference well was the 7" casing in Akron #74 (PN-2967). The test began at 07:00 am and was concluded at 3:00 pm on 10/11/2011. The first pressure difference between the test well and the reference well was 249.672 psi. The final pressure difference between the test well and the reference well, eight hours later was 249.669 psi. Based on the pressure change from start to finish, the Akron 73 well easily passes this MIT.
1775593369 2006-08-03 Union Drilling Rig 24 is on site and rigging up. Should spud the well within 24 hours. Using steel pits.
1844939310 2006-12-14 Arvilla was on site to drill out the 7" production casing. They were using a small mud pump and a power swivel to drill with and were circulating into a half tank. No violations at this time.
1971734864 2006-08-10 Union Drilling is drilling ahead. No violations at this time.
548536689 2006-12-08 Successfully completed a MIT on this well.

10:28 535 psi 10:33 535 psi 10:38 535 psi 10:43 535 psi

719078282 2006-08-14 Union will TD the well later today and should be ready to run and cement the 7" production string tonight.