If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-23093 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.1163613904,"lon":-80.5716854318,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2009-04-07 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.1163613904 | |
Longitude: -80.5716854318 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1853447723 | 2009-04-14 | I performed a rig inspection. The location was in good shape. The pit liners and the pits were in good shape. The drilling depth was 5056'. There were no violations at this time. | ||||
-199698397 | 2009-04-09 | I performed a rig inspection. The well was GPS'd. The pits and pit liners were in good shape. The location was in good shape. There were no violations at this time. | ||||
-2100847720 | 2009-04-08 | I preformed a rig inspection. The well was GPS'd. The location was in good shape. The pit liners were down on the whole east side of the pit. I shut the rig down. I called Todd Suckow from BOCOR to let him know that the pit liner needs attention. He was out within 1 1/2 hours. The track hoe started digging the second pit. The drilling depth was 301'. Drilling on fluid. They are in the process of repairing the liner. They transferred the fluid from the front pit to the second pit. Installed a liner over the old one Then the drilling of the surface hole continued. | ||||
1218015028 | 2009-06-09 | There is vegetation growth on the location. This well has PASSED PRELIMINARY RESTORATION. | ||||
1239621610 | 2009-04-09 | I witnessed the cementing of the 8 5/8" casing. There were no violations at this time. | ||||
1239818768 | 2009-04-13 | I performed a rig inspection. The pits and pit liners were in good shape. The location was in good shape. The drilling depth was 4115'. There were no violations at this time. | ||||
1240230590 | 2009-04-17 | I performed a preliminary restoration inspection. The drilling rig is gone but the debris is still on the location. The pits and pit liners are in good shape. The fluid level in the pits are down 3 feet. This well has not passed Preliminary Restoration. | ||||
782342317 | 2009-05-07 | I performed a preliminary restoration status check. The pits are closed. There were no violations at this time. |