If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24283 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.759350376,"lon":-81.258882776,"icon":""}]} |
| County: | |
| Municipality: | |
| Operator Name: | |
| Well Pad ID: | |
| Farm/Lease Name: | |
| First Permit Date: | |
| Last Permit Date: | |
| Spud Date: 2010-10-14 | |
| Unconventional: | |
| Horizontal: | |
| Producing: No | |
| Violations: 0 | |
| Latitude: 39.759350376 | |
| Longitude: -81.258882776 |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|
| PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
|---|
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
|---|---|---|---|---|---|---|
| -410556736 | 2010-10-26 | On day of inspection stopped by site. Universal was setting up to frac well in the Gordon. They would only frac one stage.Frac 2 stages tomorrow. | ||||
| 1264566124 | 2010-10-15 | On day of inspection Monroe drilling is setting surface casing. Universal is cementing casing. Ran 1065'0f11open hole. Set 1042'of 20lb/ft8 5/8 casing. Good returns. | ||||
| 1288892912 | 2010-10-27 | On day of inspection universal performed 1st stage on frac on 10-26-10. I was for the last two stages. In the 30ft formation pumped 500gal of 20%HCL.There was 16 holes at 2200-2250,Frac baffle was set at 2331'.Break down is at 900psi.Formation took 29bb/min at 2120psi.The Berea had frac baffle at 2022'.There was 18 holes from 1950-1956'.There was 500bbl of 20%HCL pumped. Average pump pressure is 20bbl/min.Break down is at 1100 psi. All fluids were contained. |