34-121-24428

Well Details

Well ID: 34-121-24428
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-08-10
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 39.8642298
Longitude: -81.4307915473

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1074464792 2013-09-16 My inspection today finds the drilling phase has been finished. Patterson Drilling ran 15924' of 5.5" casing. The casing was cemented in place by Nabors with 1277 sks of class H cement.
-1112126025 2013-09-03 My inspection today finds the operator is drilling 8.5" hole at a depth of 7062'. I asked the operator to haul the rain water out of the cellars of the other wells on site.
-1255031737 2013-08-22 My inspection today finds the rig is currently waiting on their first intermediate cement to set up.
-1567018448 2013-12-18 The preliminary restoration requirements have been met.
-347736436 2013-09-09 My inspection today finds the rig is drilling ahead at 14545'. I tested the water in a small puddle on the site with a Quantab. The test did not indicate any elevated chlorides.
1376668211 2013-08-12 The drilling rig is currently moving onto the well, and preparing to begin drilling in the next 24 hours. There are several tears in the primary containment. I have instructed the operator to repair the membrane before drilling commences.
1376926170 2013-08-12 While inspecting the location I found Dirt Excavating truck 139 was not properly labeled to meet UIC regulations. The hauler is registered and I advised the driver to get all trucks labeled and into compliance.
1376932384 2013-08-16 The drilling rig has ran 18.625" casing to a depth of 541'. Superior circulated 225 bbl of class A cement into place. Good returns to surface.
1378068287 2013-09-01 On site to witness second stage of cement job, Patterson rig 343 drilled a 12.250" hole to a depth of 6790' and ran6779' of 9.625" casing with stage tool at 4420' and casing was equipped with guide shoe and float collar and 40 centrailizers and two cement baskets placed around stage tool and Nabors cemented casing in place with 1740 sacks of 13.5 # cement with a yield of 1.55 and they had good returns to surface approximately 40 bbl went to half round tank.