34-153-23026

Well Details

Well ID: 34-153-23026
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2007-12-21
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.1536242276
Longitude: -81.5149007865

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1435038273 2008-05-07 Turbo Excavating is on site to lay the flowline. The tank battery location has been moved several hundred feet east of where it was proposed with the application. The company will need to submit a revised aerial photograph and map to reflect the new location.
-1765023430 2010-02-05 checked site for tour on Senate Bill 165.
-1959361201 2008-09-18 Preliminary restoration is due by the end of the month. Grading and seeding still need to be finished around the entrance and the lease road to the tank battery. I called Mike Weinsz and informed him of what needed to be done.
1193687101 2007-12-17 Independence Excavating has started building the lease road and the drilling location. The rig should be arriving on the 21st.
1201815388 2008-01-24 Turbo Excavating and Chem Tech are on site to start solidifying the drilling pits.
1312081283 2008-08-11 I received photos from Dave Ritter (Summit Soil & Water) showing sediment running off of the driveway leading to this location. There was no evidence of sedimentation in the road ditch. I called and left a message for Dave that I will ask the company to seed the exposed banks of the road cut. Preliminary restoration is not due until the end of September.
1483597966 2008-01-30 The pits have been solidified and closed and the site has been rough graded. The lease road and location are in good condition. The complaint from Mr. Finan has been resolved with the removal of the trackhoe and bulldozer from the lease road.