Well ID: 34-117-24222
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2010-12-09
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 40.5215110405
Longitude: -82.8136411714

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1127924486 2013-02-20 Check injection well and pressures.
-1341250932 2013-12-19 Inspect well and location. Timco on site to load annulus and pressure test. Test well at 460 psi for 15 minutes. Test passed.
-1356710877 2013-12-20 Inspect Mullins Energy Services brine truck on site to pressure test injection line. License number PHW 8499, Truck #3. Brine and UIC number clearly and properly marked. Status: ok.
-1563323603 2014-02-13 Inspected well and location. Operator installed two pen continuous chart recorder on the well head injection line and well head annulus. Operator was allowed to begin injection of production water into well.
-1962499648 2014-07-30 Inspect well for integrity and pressure. The injection line has a strong vacuum. The annulus had a slight vacuum. Operator reported that he pressure tests the well at 500 psi each month and the well passes the test. Requested to be present at the next monthly test.
-2001359807 2011-03-11 Received a verbal complaint from Dan Rogers at Twp Rd 115 on January 13, 2011, reporting cloudy water from water well initiated during the time frame for drilling of this oil well. Water well driller was removing pump and surging well to develop, on 1/13/2011. It was determined that the water well had collapsed and was not related to the oil well drilling operation. Complaint was resolved per the landowner.
-479538297 2014-04-08 Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: ok.
-711365857 2014-08-25 Inspected the E. Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: ok.
100219827 2014-07-21 Inspect the well and location. The flow meter indicates 546533 gallons.
1051907586 2014-03-18 Inspected the E. Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: ok.
1078867019 2014-03-21 Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: ok.
1248638232 2014-04-23 The operator has buried the 1000 gallon plastic tank for the vault directly behind (East) the unload pad. This is an in the field revision to the revised construction plan. The drain for the pad was also moved toward the rear of the pad. No plan revision needed as per Mr. Tom Tomastik. Status: will continue to monitor construction.
1347110319 2012-08-21 Inspected well for conversion to a Salt Water Injection Well (SWIW). Well is located in open field. About ten residential homes and farm houses with water wells, located within a 0.25 mile radius and the closest water well is 670 feet west of the injection well. The water wells range in depth from about 60 feet to 140 feet, but the deepest is 250 feet. The homes in the area are reported to have rural water supply. A small farm pond is located less than 300 feet to the north east of the well. If the tank battery is to be located near the road with an unloading pad then double lined injection lines should be warranted. Contacted Landowner, at time of inspection, unaware of the operators intent to convert well into injection well.
1367591812 2013-05-03 Performed preliminary restoration inspection on the Dumbaugh #1 (#4222). The well currently is idle, tubing is installed in the well, no pump jack or storage. Currently being considered for conversion to SWIW. Status: ok.
1375116598 2013-07-29 Permit issued to convert to a SWIW issued 7/18/2013 expires 7/18/2015.
1386856849 2013-12-12 Berry well service finished pulling and laying down tubing. 1:30 pm run-in-hole with knock out tool to knock out bridge plug set at 3340' (per operator). 1:45pm Berry well service tag bridge plug at 3348' and drive to 3390' (service rig depths). Shut down for the day.
1386876840 2013-12-12 The Dumbaugh #1 (#4222) is being converted to a disposal well. Preliminary restoration completed.
1386948820 2013-12-13 9:00 am Berry well service start in hole with new Parmaco C-301 packer, set on new 2.375 upset, 4.7 pound, J55 polylined tubing. 12:30 pm Ran 105 joints tubing set packer on tension at 3258', top of perferations 3308'. 12:45 pm Producers Services Corporation hooked up to well and begin displacing water and packer inhibitor down annulus. 1:36 start bleeding air and foam out of annulus. Unable to bleed air and foam out of system, shut down for the weekend.
1387316256 2013-12-17 A new RPX Composites 210 barrel fiberglass storage tank has been delivered to location.
1387472740 2013-12-19 The operator has placed the storage tank in the dike and has begun construction of the injection line from the tank to the well.
1387566058 2013-12-20 1) On site with Mullins Energy Services to pressure test the injection line from the storage tank to the well. 3:00 pm Mullins pressured up line to 100 psi. 3:15 pm reading 100 psi. Status: Injection line from storage tank to injection well passed integrity test. 2) Mullins Energy Services hook up to injection line from Dumbaugh injection well to Higgins production well. 3:50 pm pressure up to 100 psi. 4:05 pm reading 99 psi. Status: Injection line from the Higgins (#3401) to the Dumbaugh (#4222) passed integrity test.
1389642000 2013-01-14 The well is not in injection, waiting on approval.
1390495956 2014-01-23 Location Information. ENTRANCE: Lat. 40.52106 Long. -82.81662 / WELL HEAD: Lat. 40.52150 Long. -82.81357 / CENTER-OF-STORAGE: Lat. 40.52140 Long. -82.81354.
1393347754 Inspected the Dumbaugh #1 (#4222) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: no change in status from previous inspection.
1394034704 2014-03-05 Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: the operator has added the well identification and emergency contact information at the storage and identified the permit number and SWIW number at the well head.
1394650375 2014-03-12 Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: The operator filled and pressure tested the annulus on 3/11/2014. Tested 325 psi for 15 minute. Tested ok.
1396276783 2014-03-31 Inspected the Dumbaugh #1 (SWIW # 64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: well currently shut-in.
1397840921 2014-04-18 The operator has a crane on location and is placing the composite 210 barrel tank into the storage dike.
1398169741 2014-04-16 Inspect well and location. Operator set forms and poured concrete for unloading pad. Concrete was ordered with fibers and rebar was used for reinforcement.
1398431290 2014-04-25 Crushed limestone has been delivered to the site for the access road.
1398693655 2014-04-28 Surface facility construction complete. The operator has begun hauling into the facility.
1398863126 2014-04-30 The recently buried 1000 gallon plastic tank for the vault has floated out of the ground due to recent heavy rains. The operator has suspended hailing into the location until fixed. Status: will continue to monitor.
143092769 2014-01-06 Check status of injection well. No change in status from previous inspection. Waiting on approval to begin injection.
1663936202 2014-04-17 Inspect well and facility. The concrete pad has been poured. The second 210 fiberglass barrel storage tank has been delivered and is on location.
1675740309 2013-12-19 On-site with Inspector Benko for pressure test. 12:55 pm hook up Timco oil field services truck and pressured up annulus to 460 psi. 15 minute pressure 440 psi: passed mechanical integrity test.
168314181 2014-01-23 Received Chief Order No. 2014-29 granting Houghton Investments authorization to begin injection with operational conditions.
1954442501 2010-12-16 Drilling rig shut down, no one at the site.
617350184 2013-12-20 The operator has finished plumbing the storage tank: ladder added, new valves installed and the in/out injection lines are in.
765159807 2014-02-13 On-site with Inspector Benko to witness the installation of the two pen pressure chart recorder. Manufacturer: ITT Barton, red pen= Injection, blue pen= Annulus. Injection (red) pen zeroed at 75 psi to observe vacuum. Flow Meter: John C. Ernst Electronic Digital Meter, reads in GALLONS not BARRELS. Status: the operational conditions of Chief's Order No. 2014-29 have been satisfied and the well has been officially placed into operation.
780935836 2014-06-20 On-site with UIC Inspector Tom Benko for standard injection well status check. Status: ok.
84613249 2013-12-09 Inspect well and location. Well is shut in. Contractor installing transfer line from Higgins wells.
937617759 2013-12-09 The operator is continuing work on injection line.