{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.546909627,"lon":-81.4527433641,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2009-09-05 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.546909627 | |
Longitude: -81.4527433641 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1041071544 | 2009-10-29 | Contractor working on asphalt parking lot. | ||||
-1080364776 | 2013-01-14 | The producing unit is comprised of a two-tank battery (1 210-barrel production and 1 100-barrel brine) and a wellhead with mechanical plunger lift, and mechanical separator, each in separate chain-link enclosures. The well is currently in production. The tank and well spacing is in accordance with 1509:9-9-05 . HB 278 safety equipment is present. Unit identification is present and legible at the tank battery. The tank battery secondary containment is adequate. I did not observe any leaks, spills, or other signs of contamination. The gates are locked. | ||||
-1223775498 | 2009-10-20 | Fracturing crew on site no issues during the frac.
Rick Simmers wants MSDA Sheets and also how much water and the volume of the additives used. |
||||
-130104263 | 2009-09-09 | no violation, drilling cement inside casing at 350'. | ||||
-1403888247 | 2009-09-01 | on site company working on location for rig. | ||||
-1562925639 | 2009-10-26 | asphalt still torn up well fenced and area still fenced with chain link . | ||||
-1653003409 | 2009-10-21 | checking site swabbing rig on well. | ||||
-1920329157 | 2009-09-17 | on site for cementing the 4.5" casing in. | ||||
-767187006 | 2009-10-19 | on site to check progress of the perforation of well. Crew done perforating no issues or violation. Crew to arrive early to get fracturing done before workers arrive for work. | ||||
-811240886 | 2009-10-16 | checked area pits closed. company letting ground settle before laying asphalt. | ||||
-930451393 | 2009-09-15 | drilling at 3000' No Violation. | ||||
1154297239 | 2009-09-04 | On site did a change in rig orientation to east to west and pits to the north. | ||||
1261231770 | 2009-12-04 | crew on site boring under alpha drive city of highland Hts on site along with EOG. | ||||
1326480179 | 2012-01-11 | On 01/11/2012, DNR Inspector Richard Skidmore completed an urban preliminary restoration well inspection for DNR Inspector Ray Wallace. The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05. Inspection passed. | ||||
1421183368 | 2009-10-19 | Rick Simmers received a phone call from ODNR director Mr. Logan in reference to explosives being hauled in the city limits.
Inspected site in Highland Hts . Well being perforated on Alpha Drive. Jim Austin building dept. and Tom Hartman Fire Chief both saw the sign on Perforation Truck. Perforation crew gave the Fire Chief Hartman MSDA sheets and answered his question. Rick Simmers advised Director Logan that the perforation trucks are license under ODOT. The Fracturing will be done 10-20-09 before rush hr starting at 7 AM. |
||||
1853183142 | 2013-09-25 | The producing unit is comprised of a wellhead with mechanical plunger lift system and an above-ground storage tank (AST) battery. The wellhead and battery are in separate, board-on-board enclsoures. The well is producing and no problems or violations noted. Preliminary restoration passes. | ||||
1959838854 | 2009-09-28 | chain link fence still up around site .Pits had been solidified on the 27th of Sept 2009 company man advised me they will be covered over when solidification is hard because it is in the asphalt parking area | ||||
2025017081 | 2010-01-13 | no violation unable to check restoation because of snow cover! | ||||
2141169373 | 2009-09-23 | Pits still open and fenced in . | ||||
249116297 | 2009-12-04 | company boring under alpha drive for flow line to domino gas line.then continued to bore from alpha drive east to tank batery. | ||||
492190694 | 2009-10-20 | Crew on site flowing well into frac tanks. | ||||
662069362 | 2009-09-10 | drilling at 1200' tripping out drill stems to run motor in. | ||||
829868315 | 2009-10-20 | on site during fracturing no violation found. | ||||
921119440 | 2009-11-30 | Working on well site and tank battery in back of property. |