If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 051-24544 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.125561,"lon":-79.76103,"icon":""}]} |
County: Fayette | |
Municipality: Perry Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Farm/Lease Name: PORTER-NAYLOR UNIT 27H | |
First Permit Date: 2012-10-22 | |
Last Permit Date: 2012-10-22 | |
Spud Date: 2012-11-14 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 40.125561 | |
Longitude: -79.76103 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2121875 | 2012-08-02 | No Violations Noted | Pre-op Inspection of well site. Perimeter E&S in place and functioning. | |
2126355 | 2012-11-21 | No Violations Noted | HORIZONTAL MARCELLUS,CONDUCTOR PIPE (30")SET 56' ON (11/16/2012). | |
2136956 | 2013-02-06 | No Violations Noted | HORIZONTAL MARCELLUS, KEANE RIG DRILLING ON AIR @ 371 (TD). RUNNING COAL PROTECTION CASING AND CEMENTING TODAY (2/5/2013). BASKET SET @ 300'. | |
2136960 | 2013-02-05 | No Violations Noted | HORIZONTAL MARCELLUS, KEANE RIG DRILLNG ON AIR @ 264' (TD). RUNNING 1ST WATER PROTECTION CASING AND CEMENTING TONIGHT (2/2/2013). | |
2136966 | 2013-02-01 | No Violations Noted | HORIZONTAL MARCELLUS, KEANE RIG MOVED OVER TO PORTER - NAYLOR 27 - H (1/31/2013). RIGGING - UP AT PRESENT TIME. | |
2138247 | 2013-02-06 | No Violations Noted | Site ID in place, plans in box, E&S in place and functioning. Driller on site. | |
2140824 | 2013-02-08 | No Violations Noted | HORIZONTAL MARCELLUS, KEANE RIG DRILLING ON AIR @ 487' (TD). RUNNING 2ND WATER PROTECTION CASING AND CEMENTING TONIGHT (2/7/2013). |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|