If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 005-31027 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.710661,"lon":-79.626202,"icon":""}]} |
County: Armstrong | |
Municipality: South Buffalo Township | |
Operator Name: SNYDER BROS INC | |
Farm/Lease Name: WILLIAM H RENSHAW ETUX 4M-161 | |
First Permit Date: 2012-03-13 | |
Last Permit Date: 2012-03-13 | |
Spud Date: 2012-09-25 | |
Unconventional: Yes | |
Horizontal: No | |
Producing: Yes | |
Violations: None | |
Latitude: 40.710661 | |
Longitude: -79.626202 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2099870 | 2012-09-13 | No Violations Noted | Pre-operation inspection at the request of the Operator. At the time of inspection the Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that at the time of inspection an erosion ditch is forming on the fill side of the well pad area and left unchecked could result in sedimentation transported offsite. The Department suggests the Operator clean out the area behind the silt fence and mend the eroded fill side of the well pad. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained. | |
2104747 | 2012-10-03 | No Violations Noted | At the time of inspection the Operator was actively drilling the onsite. The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that suggestions made during the 9/13 inspection in relation to the erosion ditch and sediment fence maintenance have not been corrected. The Department suggests again that the Operator mend the erosion ditch forming on the corner of the well pad furthest from the cut slope and pull the built up sediment away from the sediment fence. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained. | |
2111180 | 2012-10-24 | No Violations Noted | At the time of inspection the site appeared to be drilled but not equipped for production The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that suggestions made during the 9/13 and 10/3 inspection in relation to the erosion ditch and sediment fence maintenance have been corrected. The Department notes that the Operator mended the erosion ditch forming on the corner of the well pad furthest from the cut slope and pulled the built up sediment away from the sediment fence. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained. | |
2118997 | 2012-11-28 | No Violations Noted | Well producing in line after recent frac. Pit lined and freeboard maintained.
Well equipped with production unit (separators, heater, meter), and two (2) produced fluids tanks. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 4397.0 | 7.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | FRACING FLUID WASTE | 2040.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW006 | CAES WATER TRMT & RECYCLING FAC | CLARION | PA |
2012-2 | PRODUCED FLUID | 80.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) - KLEESE DEVELOPMENT ASSOCS | VIENNA | OH |
2012-2 | DRILL CUTTINGS | 119.0 | Tons | ENCAPSULATION | ON SITE DISPOSAL PURSUANT TO 25 PA CODE 78.62 | |||
2012-2 | PRODUCED FLUID | 80.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2012-2 | FRACING FLUID WASTE | 240.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-2 | PRODUCED FLUID | 80.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL (PANDER RAY TRUCKING INC) | NEWTON FALLS | OH |