37-005-31027

Well Details

Well ID: 37-005-31027
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Buffalo Township
Operator Name: SNYDER BROS INC
Well Pad ID: 147131
Farm/Lease Name: WILLIAM H RENSHAW
License Status: Plugged and Abandoned
Spud Date: 2012-09-26
Permit Date: 2012-03-13
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.710661
Longitude: -79.626203

For data sources see[1][2][3]

Well History

Date Event
2012-03-13 New Permit Application
2012-09-25 Performed Spud Operation
2012-10-05 Drilling Completion
2012-11-19 Perforation
2012-11-19 Performed Stage 1 of Stimulation
2012-11-20 Performed Stage 2 of Stimulation
2013-05-07 NEWLY DRILLED
2019-04-18 Begin Plugging
2019-04-25 Finished Plugging
2019-09-05 Fully Plugged

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-11-19 2012-11-19 7,046 158,047

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SUPER TSC Nabors Industries Paraffin & Scale Additive
Hydrochloric Acid Nabors Industries Cement/Formation Breakdown Hydrochloric acid 7647-01-0 7.50 0.01
Water 7732-18-5 92.50 0.21
SUPER MAX Nabors Industries Surfactant/Foamer 2-Butoxyethanol 111-76-2 7.00 0.00583680
2-Ethylhexanol 104-76-7 40.00 0.05
PROPRIETARY 7.00 0.00986490
Isopropanol 67-63-0 30.00 0.04
Super 100NE Nabors Industries Surfactant/Foamer Isopropanol 67-63-0 30.00 0.00014090
2-Butoxyethanol 111-76-2 7.00 0.00003290
SUPER TSC Nabors Industries Scale Control ANIONIC POLYMER 10.00 0.00035230
ANIONIC COPOLYMER 10.00 0.00035230
1,2,4-Butanetricarboxylic acid, 2-phosphono- 37971-36-1 10.00 0.00035230
1,2-Propylene glycol 57-55-6 50.00 0.00176160
ICP-1000 Nabors Industries Iron Control Additive 1,2-Propylene glycol 57-55-6 50.00 0.00352320
ANIONIC COPOLYMER 50.00 0.00352320
CLAY TREAT LT Nabors Industries Clay Control Choline chloride 67-48-1 80.00 0.00037580
ACID INHIBITOR 2 Nabors Industries Acid Corrosion Inhibitor Propargyl alcohol 107-19-7 0.00021140
PROPRIETARY 0.00004930
Isopropanol 67-63-0 0.00021140
2-Butoxyethanol 111-76-2 0.00021140
KR-153SL Nabors Industries Biocide Diethylene glycol 111-46-6 3.50 0.00012330
Polyethylene glycol 25322-68-3 50.00 0.00176160
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.00070460
Ethylene glycol 107-21-1 1.00 0.00003520
WFR-3B Nabors Industries Friction Reducer Stoddard solvent 8052-41-3 10.00 0.00683500
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Ethoxylated C12-16 alcohols 68551-12-2 4.00 0.00273400
1,2-Propylene glycol 57-55-6 25.00 0.01

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2012-11-19 1 Sand 158,047 5,748 4,960
2012-11-20 2 Sand 158,047 5,595 3,704

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 SNYDER BROS INC 4,397.00 7 0.00 0 0.00 0
2013 SNYDER BROS INC 79,935.00 360 0.00 0 0.00 0
2014 SNYDER BROS INC 36,346.00 362 0.00 0 0.00 0
2015 SNYDER BROS INC 24,820.00 352 0.00 0 0.00 0
2016 SNYDER BROS INC 20,070.00 319 0.00 0 0.00 0
2017 SNYDER BROS INC 16,136.00 289 0.00 0 0.00 0
2018 SNYDER BROS INC 11,371.00 239 0.00 0 0.00 0
2019 SNYDER BROS INC 7,425.00 119 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 SNYDER BROS INC Drill Cuttings 119.00 Tons ON SITE ENCAPSULATION
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2012 SNYDER BROS INC Fracing Fluid Waste 240.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 SNYDER BROS INC Fracing Fluid Waste 2,040.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW006
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2013 SNYDER BROS INC Produced Fluid 160.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2013 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2014 SNYDER BROS INC Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2017 SNYDER BROS INC Produced Fluid 95.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 SNYDER BROS INC 95.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 SNYDER BROS INC Produced Fluid 34.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-099-23158

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2099870 Primary Facility 2012-09-13 Routine/Complete Inspection No Violations Noted Pre-operation inspection at the request of the Operator. At the time of inspection the Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that at the time of inspection an erosion ditch is forming on the fill side of the well pad area and left unchecked could result in sedimentation transported offsite. The Department suggests the Operator clean out the area behind the silt fence and mend the eroded fill side of the well pad. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained.
2104747 Primary Facility 2012-10-03 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator was actively drilling the onsite. The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that suggestions made during the 9/13 inspection in relation to the erosion ditch and sediment fence maintenance have not been corrected. The Department suggests again that the Operator mend the erosion ditch forming on the corner of the well pad furthest from the cut slope and pull the built up sediment away from the sediment fence. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained.
2111180 Primary Facility 2012-10-24 Routine/Complete Inspection No Violations Noted At the time of inspection the site appeared to be drilled but not equipped for production The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department notes that suggestions made during the 9/13 and 10/3 inspection in relation to the erosion ditch and sediment fence maintenance have been corrected. The Department notes that the Operator mended the erosion ditch forming on the corner of the well pad furthest from the cut slope and pulled the built up sediment away from the sediment fence. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained.
2118997 Primary Facility 2012-11-28 Drilling/Alteration No Violations Noted Well producing in line after recent frac. Pit lined and freeboard maintained.
2170517 Primary Facility 2013-05-24 Site Restoration No Violations Noted Well appeared to be equipped for production, brine tank located onsite. Brine tank appeared to be in sound condition. Site had been regraded, seeded, mulched and the vegetation ahd begun to emerge. The operator should continue to monitor the site to isnure the continued growth of the vegetation. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road.
2185962 Primary Facility 2013-07-19 Site Restoration No Violations Noted Well appeared to be equipped for production, brine tank located onsite. Brine tank appeared to be in sound condition. Site had been regraded, seeded, mulched and the vegetation met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road.
2381108 Primary Facility 2015-06-22 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production, brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2750679 Primary Facility 2018-07-11 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment and two grounded 100 bbl fiberglass fluid collection tanks look ok.

For data sources see[9]