If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-039-25016 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.507305,"lon":-80.40298,"icon":""}]} |
County: Crawford | |
Municipality: South Shenango Township | |
Operator Name: D & L ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: HALLIDAY 4 | |
First Permit Date: 2007-02-09 | |
Last Permit Date: 2007-02-09 | |
Spud Date: 2007-03-13 | |
Unconventional: No | |
Horizontal: No | |
Well Status: ACTIVE | |
Violations: 2 | |
Latitude: 41.507305 | |
Longitude: -80.40298 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2008-0 | 3884.0 | 366.0 | 0.0 | 0.0 | 166.0 | 365.0 |
2010-0 | 1609.4 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 2369.1 | 365.0 | 0.0 | 0.0 | 100.5 | 365.0 |
2012-0 | 1192.9 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-0 | 75.6 | 33.0 | 0.0 | 0.0 | 0.01 | 33.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2010-0 | PRODUCED FLUID | 69.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23584 | KOONTZ #1 DISPOSAL WELL | WARREN | OH |
2010-0 | PRODUCED FLUID | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-007-22038 | PAROBEK #2 (SWIW #12) | OH | |
2011-0 | PRODUCED FLUID | 80.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23584 | KOONTZ #1 DISPOSAL WELL | WARREN | OH |
2011-0 | PRODUCED FLUID | 207.0 | Bbl | INJECTION DISPOSAL WELL | 34-099-23127 | NORTHSTAR #1 | YOUNGSTOWN | OH |
2011-0 | PRODUCED FLUID | 687.0 | Bbl | INJECTION DISPOSAL WELL | 34-007-22038 | PAROBEK #2 (SWIW #12) | OH | |
2012-0 | PRODUCED FLUID | 98.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-22403 | ANNAROCK D-1 | FOWLER | OH |
2012-0 | PRODUCED FLUID | 36.0 | Bbl | ROAD SPREADING | CRAWFORD COUNTY ROADSPREADING - EAST FALLOWFIELD | PA | ||
2012-0 | PRODUCED FLUID | 80.0 | Bbl | INJECTION DISPOSAL WELL | 34-133-22523 | MILLER #1 DISP WELL | WINDHAM | OH |
2012-0 | PRODUCED FLUID | 234.0 | Bbl | INJECTION DISPOSAL WELL | 34-007-20919 | RENSHAW / BRADNAN #1 (B&R) DISPOSAL WELL | PIERPOINT | OH |
2013-0 | PRODUCED FLUID | 13.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-24063 | JOHNSON DISPOSAL #1 | NORTH BLOOMFIELD | OH |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1605894 | 2007-03-09 | In Compliance with Schedule | ||||
1606838 | 2007-03-14 | No Violations Noted | ||||
1615281 | 2007-04-12 | In Compliance with Schedule | ||||
1619896 | 2007-05-01 | No Violations Noted | ||||
1638846 | 2007-07-11 | In Compliance with Schedule | ||||
1980913 | 2011-06-15 | Violation(s) Noted | Upon inspection today i found the production equipment apparently had either a leak or overtoped the capacity and dumped a large volume of oil and bring into the dike area. The oil appeared as htough it had been in the dike for several days if not weeks. Some mimimal effort had been made tro clean it up. The well pump jack is on a timer. the production equipmetn comnsisted of a two steel stock tanks and one poly tank with a separator. The well had an active prodcution chart in place. I called the operator and required them to remove all the comtaminated stone and dirt, then call me for an inspection before replacing the stone. I will send a NOV.dirt. | 613694 | 78.57 - Failure to post pit approval number | |
1981635 | 2011-06-16 | Violation(s) & Outstanding Violations | Today's inspection was in follow-up to my 6/15 inspection to determine if the operator had taken steps to clean-up the oil spill. Upon inspection I found that the operator had placed spill abosorbent material in the oil/water laying inside the dike. On 6/16 I contacted the production Manager Dave Rice and explained we required the stone and contaminated soil be removal and that I must inspect the soil before reinstalling the stone.
A NOV as mailed out for the violation on 6/20/11. |
613850 | 78.54 - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. | |
1985102 | 2011-06-27 | Repairs or Upgrade Required | On site revealed the stone and soil under the stock tanks needed to be removed to complete clean-up- I conact Dave Rice the production manager for D&L and explained this to him- he said they would get it done and call me. | |||
1985192 | 2011-06-29 | No Violations Noted | Follow-up to verify the spill had been cleaned up and equipment reinstalled as required in NOV.All work is completed. | |||
2110816 | 2012-10-24 | No Violations Noted |
For data sources see[3]