X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28790

Well Details

Well ID: 37-129-28790
Loading map...
County: Westmoreland
Municipality: Upper Burrell Township
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: HARTGE UNIT 6H
First Permit Date: 2012-07-05
Last Permit Date: 2012-07-05
Spud Date: 2013-01-16
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.557911
Longitude: -79.701377

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 2744.0 214.0 0.0 0.0 824.9 214.0
2014-0 3164.0 365.0 0.0 0.0 418.44 365.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2013-0 DRILLING FLUID WASTE 685.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2013-0 FRACING FLUID WASTE 810.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2013-0 PRODUCED FLUID 1.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2014-0 PRODUCED FLUID 44.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2122297 2012-12-05 No Violations Noted Inspection the result of a spud noticed received by the Department on 12/03/2012. At the time of inspection the spud rig was on site. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2125640 2012-12-26 No Violations Noted no violoations noted
2126139 2012-12-26 No Violations Noted Waiting on tophole rig at time of inspection. Pit lined and freeboard maintained. Inspection conducted w/WQS S. Steingrabe.
2128516 2013-01-02 No Violations Noted Waiting on rig to resume drilling at time of inspection. Pit lined and freeboard maintained. Inspection conducted w/WQS S. Steingrabe.
2129620 2013-01-10 No Violations Noted At the time of inspection the drill rig was on site and was in the process to drilling the 7H well. At the time of inspection the conductor is set on this well but has not been drilled. The site appeared to be in sound condition. No accelerated erosion or sedimentation observed in relation to well pad or access road during the inspection. The drill pit located on site appeared to be in sound condition with the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the site remains stable.
2133412 2013-01-24 Pending Pending
2134637 2013-01-24 No Violations Noted Falcon rig#27 drilling on 9.1 lb/gal mud and beginning to build curve at 2522ï¾’ at time of inspection. Pits lined and freeboards maintained. Discussed issues regarding pits w/Operator rep K. McDowell and relayed to WQS S. Steingrabe.
2152331 2013-04-01 No Violations Noted At the time of inspection the well appears to be drilled and stimulated however the well does not appear to be equipped for production. Three pit located on site appear to be in sound conditions and appear to have the required 2' of freeboard. No observation of accelerated erosion and sedimentation in relation to the well pad and access road during the inspection. The E&S plan was on site and appear to be properly installed and maintained as outlined in the plan. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. The Department also suggests the Operator contact WQS Sam Steingrabe prior to the removal, encapsulation, or land farming of the contents of the pits located onsite. Please contact Sam via email 24 hours prior to the start of the activity.

For data sources see[3]

References