If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-20380 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.672627,"lon":-76.969747,"icon":""}]} |
County: Tioga | |
Municipality: Ward Township | |
Operator Name: TALISMAN ENERGY USA INC | |
Well Pad ID: 148196 | |
Farm/Lease Name: DCNR 587 02 009 06 | |
First Permit Date: 2009-09-02 | |
Last Permit Date: 2009-09-02 | |
Spud Date: 2009-10-09 | |
Unconventional: Yes | |
Horizontal: Yes | |
Well Status: ACTIVE | |
Violations: 0 | |
Latitude: 41.672627 | |
Longitude: -76.969747 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 586373.1 | 95.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 586373.1 | 95.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 742856.0 | 176.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 557333.0 | 167.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 451487.0 | 180.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-2 | 369870.1 | 182.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-1 | 307019.9 | 180.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-2 | 275656.5 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-1 | 241267.1 | 178.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-2 | 215824.0 | 178.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-02 | 29157.0 | 26.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-01 | 34546.5 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-03 | 35460.0 | 30.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2010-2 | DRILLING FLUID WASTE | 435.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123D001X | TERRAQUA RESOURCE MANAGEMENT | WILLIAMSPORT | PA |
2010-2 | PRODUCED FLUID | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123D001X | TERRAQUA RESOURCE MANAGEMENT | WILLIAMSPORT | PA |
2011-1 | FRACING FLUID WASTE | 704.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123D001X | TERRAQUA RESOURCE MANAGEMENT | WILLIAMSPORT | PA |
2011-1 | PRODUCED FLUID | 94.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | PA BRINE | PA | |
2011-1 | PRODUCED FLUID | 18.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 | WASTE TREATMENT CORPORATION | WARREN | PA |
2011-2 | PRODUCED FLUID | 329.91 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR0123 | HYDRO RECOVERY LP BLOSSBURG FACILITY | BLOSSBURG | PA |
2011-2 | PRODUCED FLUID | 53.28 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE OF BRINE TO FRAC A WELL | |||
2011-2 | PRODUCED FLUID | 48.84 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123D001X | TERRAQUA RESOURCE MANAGEMENT | WILLIAMSPORT | PA |
2012-1 | PRODUCED FLUID | 26.93 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR0123 | HYDRO RECOVERY LP BLOSSBURG FACILITY | BLOSSBURG | PA |
2012-1 | PRODUCED FLUID | 22.82 | Bbl | INJECTION DISPOSAL WELL | 34-133-24189 | MEYERS #2 (SWIW #33) | ATWATER | OH |
2012-1 | PRODUCED FLUID | 197.43 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-2 | PRODUCED FLUID | 22.88 | Bbl | INJECTION DISPOSAL WELL | 34-133-24096 | GROSELLE INECTION WELL # 2 | GARRETTSVILLE | OH |
2012-2 | PRODUCED FLUID | 48.04 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR0123 | HYDRO RECOVERY LP BLOSSBURG FACILITY | BLOSSBURG | PA |
2012-2 | PRODUCED FLUID | 22.88 | Bbl | INJECTION DISPOSAL WELL | 34-133-24189 | MEYERS #2 (SWIW #33) | ATWATER | OH |
2012-2 | PRODUCED FLUID | 89.22 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-2 | PRODUCED FLUID | 25.17 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123D001X | TERRAQUA RESOURCE MANAGEMENT | WILLIAMSPORT | PA |
2013-1 | PRODUCED FLUID | 84.37 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2013-1 | PRODUCED FLUID | 27.74 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123D001X | TERRAQUA RESOURCE MANAGEMENT | WILLIAMSPORT | PA |
2013-2 | PRODUCED FLUID | 257.37 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-1 | PRODUCED FLUID | 27.28 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR0123 | HYDRO RECOVERY LP BLOSSBURG FACILITY | BLOSSBURG | PA |
2014-1 | PRODUCED FLUID | 196.64 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-2 | PRODUCED FLUID | 27.36 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR0123 | HYDRO RECOVERY LP BLOSSBURG FACILITY | BLOSSBURG | PA |
2014-2 | PRODUCED FLUID | 210.39 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
2022831 | 2011-11-30 | No Violations Noted | ||||
2046356 | 2012-02-29 | No Violations Noted | On Feb 29, 2012 a routine inspection was conducted at the DCNR 587 02 009 pad. The E&S plan was in the mailbox and the last self- inspection was conducted on Feb 27. 2012 by Rich Winters. During today's inspection the E&S plan was reviewed and the site perimeter walked, there were no erosion issues observed. An elevated reading for specific conductivity (approximately 2 mS) in the ditch behind the separators. This should be investigated. - MRN |
For data sources see[3]