If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-105-21668 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.849558,"lon":-78.146366,"icon":""}]} |
County: Potter | |
Municipality: Clara Township | |
Operator Name: PA GEN ENERGY CO LLC | |
Well Pad ID: 148344 | |
Farm/Lease Name: FISK HOLLOW 2452 | |
First Permit Date: 2010-05-04 | |
Last Permit Date: 2010-05-04 | |
Spud Date: 2010-08-30 | |
Unconventional: Yes | |
Horizontal: Yes | |
Well Status: ACTIVE | |
Violations: 3 | |
Latitude: 41.849558 | |
Longitude: -78.146366 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 9627.0 | 11.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 93848.0 | 180.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 60813.0 | 182.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-2 | 54645.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-1 | 38982.0 | 181.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-2 | 46248.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-1 | 39806.0 | 181.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-2 | 38387.0 | 182.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-02 | 5998.0 | 28.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-01 | 6336.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-03 | 6112.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2010-2 | DRILL CUTTINGS | 590.21 | Tons | LANDFILL | 100361 | MCKEAN COUNTY LANDFILL | KANE | PA |
2010-2 | DRILLING FLUID WASTE | 150.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | FLUID RECOVERY SERVICE FRANKLIN FACILITY | FRANKLIN | PA |
2010-2 | DRILLING FLUID WASTE | 663.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 | WASTE TREATMENT CORPORATION | WARREN | PA |
2011-1 | DRILL CUTTINGS | 143.55 | Tons | LANDFILL | 101397 | ADVANCED DISPOSAL SERVICES GREENTREE LANDFILL | KERSEY | PA |
2011-1 | DRILL CUTTINGS | 147.81 | Tons | LANDFILL | 100361 | MCKEAN COUNTY LANDFILL | KANE | PA |
2011-1 | DRILLING FLUID WASTE | 166.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 | WASTE TREATMENT CORPORATION | WARREN | PA |
2011-1 | FLOWBACK FRACTURING SAND | 12.47 | Tons | LANDFILL | 100277 | WESTMORELAND WASTE LLC SANITARY LANDFILL | BELLE VERNON | PA |
2011-1 | FRACING FLUID WASTE | 1.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2011-1 | PRODUCED FLUID | 13.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2011-2 | DRILLING FLUID WASTE | 998.83 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR0123 | HYDRO RECOVERY LP BLOSSBURG FACILITY | BLOSSBURG | PA |
2011-2 | PRODUCED FLUID | 91.26 | Bbl | INJECTION DISPOSAL WELL | 34-133-24096 | GROSELLE INECTION WELL # 2 | GARRETTSVILLE | OH |
2011-2 | PRODUCED FLUID | 367.22 | Bbl | INJECTION DISPOSAL WELL | 34-007-24355 | MILLER & CO #3 (SWIW #28) | GARRETTSVILLE | OH |
2011-2 | PRODUCED FLUID | 6.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 | NORTHSTAR #1 | YOUNGSTOWN | OH |
2011-2 | PRODUCED FLUID | 14.0 | Bbl | INJECTION DISPOSAL WELL | UIC 45 | RAY PANDER TRUCKING INC | DIAMOND | OH |
2011-2 | PRODUCED FLUID | 180.48 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2011-2 | PRODUCED FLUID | 244.35 | Bbl | INJECTION DISPOSAL WELL | 34-133-21076 | SALTYS DISPOSAL - MYERS INECTION WELL #1 | PARIS | OH |
2012-1 | PRODUCED FLUID | 1.0 | Bbl | INJECTION DISPOSAL WELL | 34-151-23420 | BELDEN & BLAKE WELL # 2 | HARTVILLE | OH |
2012-1 | PRODUCED FLUID | 2.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 525-1 | BLAZEK PUMP AND WELL | HIRAM | OH |
2012-1 | PRODUCED FLUID | 20.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21447 | KLEESE #2 (SWIW #19) | VIENNA | OH |
2012-1 | PRODUCED FLUID | 1.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2012-1 | PRODUCED FLUID | 410.83 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-1 | PRODUCED FLUID | 1.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL | NEWTON FALLS | OH |
2012-2 | FLOWBACK FRACTURING SAND | 0.45 | Tons | LANDFILL | 301626 | WHITE PINES LANDFILL | MILLVILLE | PA |
2012-2 | PRODUCED FLUID | 380.0 | Bbl | INJECTION DISPOSAL WELL | 34-151-23420 | BELDEN & BLAKE WELL # 2 | HARTVILLE | OH |
2012-2 | PRODUCED FLUID | 909.0 | Bbl | INJECTION DISPOSAL WELL | 34-133-20525 | BLAZEK #2 SWIW | HIRAM | OH |
2012-2 | PRODUCED FLUID | 3.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW005 | CARES MCKEAN WATER TRMT & RECYCLING FAC | MOUNT JEWITT | PA |
2012-2 | PRODUCED FLUID | 332.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR0123 | HYDRO RECOVERY LP BLOSSBURG FACILITY | BLOSSBURG | PA |
2012-2 | PRODUCED FLUID | 642.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) | VIENNA | OH |
2012-2 | PRODUCED FLUID | 570.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21447 | KLEESE #2 (SWIW #19) | VIENNA | OH |
2012-2 | PRODUCED FLUID | 20.0 | Bbl | INJECTION DISPOSAL WELL | 34-007-24355 | MILLER & CO #3 (SWIW #28) | GARRETTSVILLE | OH |
2012-2 | PRODUCED FLUID | 1.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2012-2 | PRODUCED FLUID | 67.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-2 | PRODUCED FLUID | 305.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL | NEWTON FALLS | OH |
2012-2 | PRODUCED FLUID | 305.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21894 | WOLF #2 DISPOSAL WELL | NEWTON FALLS | OH |
2012-2 | PRODUCED FLUID | 306.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23203 | WOLF #4 DISPOSAL WELL | NEWTON FALLS | OH |
2013-1 | PRODUCED FLUID | 720.0 | Bbl | INJECTION DISPOSAL WELL | 34-151-23420 | BELDEN & BLAKE WELL # 2 | HARTVILLE | OH |
2013-1 | PRODUCED FLUID | 676.67 | Bbl | INJECTION DISPOSAL WELL | 34-133-20525 | BLAZEK #2 SWIW | HIRAM | OH |
2013-1 | PRODUCED FLUID | 80.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) | VIENNA | OH |
2013-1 | PRODUCED FLUID | 40.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23759 | KLEESE #5 (SWIW #25) | TRUMBULL | OH |
2013-1 | PRODUCED FLUID | 1.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2013-1 | PRODUCED FLUID | 445.83 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL | NEWTON FALLS | OH |
2013-1 | PRODUCED FLUID | 445.83 | Bbl | INJECTION DISPOSAL WELL | 34-155-21894 | WOLF #2 DISPOSAL WELL | NEWTON FALLS | OH |
2013-1 | PRODUCED FLUID | 445.83 | Bbl | INJECTION DISPOSAL WELL | 34-155-23203 | WOLF #4 DISPOSAL WELL | NEWTON FALLS | OH |
2013-2 | PRODUCED FLUID | 18.36 | Bbl | INJECTION DISPOSAL WELL | 34-155-22403 | ANNAROCK D-1 | FOWLER | OH |
2013-2 | PRODUCED FLUID | 240.0 | Bbl | INJECTION DISPOSAL WELL | 34-151-23420 | BELDEN & BLAKE WELL # 2 | HARTVILLE | OH |
2013-2 | PRODUCED FLUID | 399.9 | Bbl | INJECTION DISPOSAL WELL | 34-133-20525 | BLAZEK #2 SWIW | HIRAM | OH |
2013-2 | PRODUCED FLUID | 20.0 | Bbl | INJECTION DISPOSAL WELL | 34-151-21198 | LYONS INJECTION WELL # 1 | BYEVILLE | OH |
2013-2 | PRODUCED FLUID | 595.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2013-2 | PRODUCED FLUID | 1.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2013-2 | PRODUCED FLUID | 265.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL | NEWTON FALLS | OH |
2013-2 | PRODUCED FLUID | 265.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21894 | WOLF #2 DISPOSAL WELL | NEWTON FALLS | OH |
2013-2 | PRODUCED FLUID | 265.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23203 | WOLF #4 DISPOSAL WELL | NEWTON FALLS | OH |
2014-1 | PRODUCED FLUID | 20.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-22403 | ANNAROCK D-1 | FOWLER | OH |
2014-1 | PRODUCED FLUID | 158.33 | Bbl | INJECTION DISPOSAL WELL | 34-151-23420 | BELDEN & BLAKE WELL # 2 | HARTVILLE | OH |
2014-1 | PRODUCED FLUID | 120.0 | Bbl | INJECTION DISPOSAL WELL | 34-133-20525 | BLAZEK #2 SWIW | HIRAM | OH |
2014-1 | PRODUCED FLUID | 320.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) | VIENNA | OH |
2014-1 | PRODUCED FLUID | 156.33 | Bbl | INJECTION DISPOSAL WELL | 34-155-21447 | KLEESE #2 (SWIW #19) | VIENNA | OH |
2014-1 | PRODUCED FLUID | 416.67 | Bbl | INJECTION DISPOSAL WELL | 34-155-23732 | KLEESE #4 (SWIW #24) | VIENNA | OH |
2014-1 | PRODUCED FLUID | 240.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23759 | KLEESE #5 (SWIW #25) | TRUMBULL | OH |
2014-1 | PRODUCED FLUID | 158.33 | Bbl | INJECTION DISPOSAL WELL | 34-155-23196 | NATALE #1 (SWIW #28) | WARREN | OH |
2014-1 | PRODUCED FLUID | 120.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23223 | NATALE #2 (SWIW #29) | VIENNA | OH |
2014-1 | PRODUCED FLUID | 238.33 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2014-1 | PRODUCED FLUID | 366.67 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-1 | PRODUCED FLUID | 18.33 | Bbl | INJECTION DISPOSAL WELL | 34-007-21847 | RHOA #3 (SWIW #8) | JEFFERSON | OH |
2014-1 | PRODUCED FLUID | 120.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL | NEWTON FALLS | OH |
2014-1 | PRODUCED FLUID | 120.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21894 | WOLF #2 DISPOSAL WELL | NEWTON FALLS | OH |
2014-1 | PRODUCED FLUID | 120.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23203 | WOLF #4 DISPOSAL WELL | NEWTON FALLS | OH |
2014-2 | PRODUCED FLUID | 20.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) | VIENNA | OH |
2014-2 | PRODUCED FLUID | 20.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23196 | NATALE #1 (SWIW #28) | WARREN | OH |
2014-2 | PRODUCED FLUID | 80.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23223 | NATALE #2 (SWIW #29) | VIENNA | OH |
2014-2 | PRODUCED FLUID | 543.21 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-2 | PRODUCED FLUID | 1.0 | Bbl | INJECTION DISPOSAL WELL | 34-007-21847 | RHOA #3 (SWIW #8) | JEFFERSON | OH |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1946121 | 2011-01-27 | No Violations Noted | ||||
1951315 | 2011-02-18 | No Violations Noted | ||||
2017568 | 2011-11-08 | Violation(s) Noted | An inspection was conducted at the Fisk Hollow Pad B on 11/8/11. The site ID sign and E&S plan and site perimeter were observed. The access road was installed, stabilized and the accociated BMPs functioning. The perimeter BMPs were installed and functioning. The site were stablized. A release of a pollutional substance was discovered near the production tanks. A hook-up for pumping out the contained fluid was located off the containment and was leaking. A sample was collected and submitted for SAC 942 analysis. Violations were cited during this inspection for release of a pollutional substance (25 PA Code 78.57, SWMA 301 and 402 CSL). During the inspection, John Mahaley from PGE showed up on site and shut the valves on the production tanks to stop the release. A voicemail was left for Landon Vanord, Enviromental Technician from PGE, at 1033 on his cell phone making aware of the release. A plan as to how the spill will be remediated is being requested and should be submitted to the Department. - MRN (sw-viols corrected via IR 2017568) | 624100 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | A release of a pollutional substance was discovered near the production tanks. A hook-up for pumping out the contained fluid was located off the containment and was leaking. A sample was collected and submitted for SAC 942 analysis. |
2017568 | 2011-11-08 | Violation(s) Noted | An inspection was conducted at the Fisk Hollow Pad B on 11/8/11. The site ID sign and E&S plan and site perimeter were observed. The access road was installed, stabilized and the accociated BMPs functioning. The perimeter BMPs were installed and functioning. The site were stablized. A release of a pollutional substance was discovered near the production tanks. A hook-up for pumping out the contained fluid was located off the containment and was leaking. A sample was collected and submitted for SAC 942 analysis. Violations were cited during this inspection for release of a pollutional substance (25 PA Code 78.57, SWMA 301 and 402 CSL). During the inspection, John Mahaley from PGE showed up on site and shut the valves on the production tanks to stop the release. A voicemail was left for Landon Vanord, Enviromental Technician from PGE, at 1033 on his cell phone making aware of the release. A plan as to how the spill will be remediated is being requested and should be submitted to the Department. - MRN (sw-viols corrected via IR 2017568) | 624101 | 78.57 - Failure to post pit approval number | 78.57 (a) - A release of a pollutional substance was discovered near the production tanks. A hook-up for pumping out the contained fluid was located off the containment and was leaking. A sample was collected and submitted for SAC 942 analysis. |
2017568 | 2011-11-08 | Violation(s) Noted | An inspection was conducted at the Fisk Hollow Pad B on 11/8/11. The site ID sign and E&S plan and site perimeter were observed. The access road was installed, stabilized and the accociated BMPs functioning. The perimeter BMPs were installed and functioning. The site were stablized. A release of a pollutional substance was discovered near the production tanks. A hook-up for pumping out the contained fluid was located off the containment and was leaking. A sample was collected and submitted for SAC 942 analysis. Violations were cited during this inspection for release of a pollutional substance (25 PA Code 78.57, SWMA 301 and 402 CSL). During the inspection, John Mahaley from PGE showed up on site and shut the valves on the production tanks to stop the release. A voicemail was left for Landon Vanord, Enviromental Technician from PGE, at 1033 on his cell phone making aware of the release. A plan as to how the spill will be remediated is being requested and should be submitted to the Department. - MRN (sw-viols corrected via IR 2017568) | 624102 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | A release of a pollutional substance was discovered near the production tanks. A hook-up for pumping out the contained fluid was located off the containment and was leaking. A sample was collected and submitted for SAC 942 analysis. |
2018737 | 2011-11-14 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the Fisk Hollow Pad B on 11/14/11 to collect samples to confirm the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). A hook-up for pumping out the contained fluid was located off the containment and was leaking. On 11/10/11 PGE began the site cleanup. During this inspection, the contaminated soil was seen stored on plastic and was covered awaiting removal. There was a puddle in the excavated area showed a field meter reading over 16 mS. A soil sample was collected from the excavated area in front of the production tanks and submitted for SAC 960 analysis. A puddle in the collection channel at the toe of the slope below the production tanks showed a filed meter reading over 2,000 uS. A sample was collected and submitted for SAC 942 analysis. No new violations were cited during this inspection. - MRN | |||
2025377 | 2011-12-09 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the Fisk Hollow Pad B on observe the progress of the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). A hook-up for pumping out the contained fluid was located off the containment and was leaking. On 11/10/11 PGE began the site cleanup. During this inspection, the contaminated soil was seen stored on plastic and was covered awaiting removal. During this inspection, the excavated area remained open, the excavated soil was on-site and cover with plastic. The secondary containment for the three white production tanks, which were empty during this inspection, has been breached in order to excavated soil beneath the liner. A frac tank was on-site and production fluid was being stored there. Field meter reading for Specific Conductivity were taken from the puddles in the excavated area the ditch below the production tanks. No sample were collected because the surface of the puddle were frozen. No new violations were cited during this inspection. | |||
2028650 | 2011-12-21 | Outstanding Violations - No Viols Req'd | During this inspection, the contaminated soil has been transported off-site. During this inspection, the excavated has been backfilled. The secondary containment for the three white production tanks, which were empty during this inspection, is currently being reconstructed, the liner has not been re-installed as of this inspection . A mobile frac tank was on-site and production fluid was being stored there, on secondary containment. Field meter reading for Specific Conductivity were taken from the puddles around the excavated area and the ditch below the production tanks; they did not exibit elevated readings for Secific Conductivity. A pudlle behind the the secondary containment and white production tanks exibited a field conductivity reading of 1,900ï¾µS. This must be addressed. No new violations were cited during this inspection. Violations remain outstanding related to the spill. - MRN | |||
2045286 | 2012-02-24 | Outstanding Violations - No Viols Req'd | On Feb. 24, 2012 a Compliance Evaluation Inspection was conducted at the Fisk Hollow Pleasant Valley Pad B to observe the progress of the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). The ground was frozen and snow covered. Weather conditions were 35 degrees and foggy. The site ID sign, site perimeter and the collection system for the production fluids were observed. There was no signs of erosion noted on-site. There was a puddle located in front of the production fluid tanks that exibited an elevated reading for specific conductivity (approx. 2mS). This was reported via email to PGE the afternoon of Feb. 24, 2012. PGE stated this would be investigated. No new violations were cited during this inspection. . - MRN | |||
2060891 | 2012-04-19 | No Violations Noted | On April 19, 2012 a Compliance Evaluation Inspection was conducted at the Fisk Hollow Pleasant Valley Pad B to resolve the violations associated with a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). The excavation area had been backfilled and the were no puddles visible near the containemnt system. The following violations cited in the inpsection report (2017568) referenced above are being resolved.
(1) Solid Waste Management Act, 35 P.S. ᄃ 6018.301 - Management of Residual Waste (2) Section 402 of the Clean Streams Law, 35 P.S. ᄃ691.402 - discharge of a pollutional substance at the Site created a potential danger of pollution of the waters of the Commonwealth. (3) 25 Pa. Code, ᄃ78.57(a) - Failure to adequately control, store and dispose of a production fluid. |
|||
2106225 | 2012-10-10 | No Violations Noted | ||||
2147824 | 2013-03-13 | No Violations Noted | An inspection of the Fisk Hollow Clara Pad B in Clara Township, Potter County was conducted on March 13, 2013 in response to Well Site Restoration Reports received by the Department (for wells 2452, 2453, 2454, 2455, 2456 and 2457) . The last self-inspection conducted on behalf of PGE was on 3/12/13. The site has been re-graded and temporarily stabilized. the applicable Post construction Stormwater BMPs have been installed. The site was determined to not meet the requirements of 25 Pa Code ᄃ102.22(a)(2) (i) Permanent Stabilization at this time. A minimum uniform 70% perennial vegetative cover, with a density capable of resisting accelerated erosion and sedimentation was not observed. A follow up inspection will be conducted at a later date to verify the site has been permanently stabilized. The Well Site Restoration Reports will not be approved until that time. No violations were cited during this inspection. | |||
2190381 | 2013-07-11 | No Violations Noted |
For data sources see[3]