Well Details

Well ID: 37-129-27878
Loading map...
County: Westmoreland
Municipality: Derry Township
Operator Name: WPX ENERGY APPALACHIA LLC
Well Pad ID: 147590
Farm/Lease Name: PANIZZI UNIT NO 1 4H
First Permit Date: 2009-05-07
Last Permit Date: 2009-05-07
Spud Date: 2009-06-26
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 1
Latitude: 40.369242
Longitude: -79.334855

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-3 512593.0 205.0 0.0 0.0 0.0 0.0
2010-3 160114.0 64.0 0.0 0.0 0.0 0.0
2009-0 162785.02 92.0 0.0 0.0 0.0 0.0
2010-2 294298.54 163.0 0.0 0.0 0.0 0.0
2010-2 294298.54 163.0 0.0 0.0 0.0 0.0
2011-1 245300.84 181.0 0.0 0.0 0.0 0.0
2011-2 81120.0 86.0 0.0 0.0 0.0 0.0
2012-1 95469.0 178.0 0.0 0.0 0.0 0.0
2012-2 200179.7 184.0 0.0 0.0 0.0 0.0
2013-1 201035.52 181.0 0.0 0.0 0.0 0.0
2013-2 161623.85 176.0 0.0 0.0 0.0 0.0
2014-1 134711.43 181.0 0.0 0.0 0.0 0.0
2014-2 119720.18 181.0 0.0 0.0 0.0 0.0
2015-02 17190.95 28.0 0.0 0.0 0.0 0.0
2015-01 21347.84 31.0 0.0 0.0 0.0 0.0
2015-03 20580.57 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-3 FRACING FLUID WASTE 400.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2010-3 FRACING FLUID WASTE 10.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2010-3 FRACING FLUID WASTE 3.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-3 FRACING FLUID WASTE 400.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2010-3 FRACING FLUID WASTE 3.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2010-3 FRACING FLUID WASTE 400.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2010-3 FRACING FLUID WASTE 3.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-3 PRODUCED FLUID 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2010-3 PRODUCED FLUID 2.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-3 PRODUCED FLUID 300.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2010-3 PRODUCED FLUID 2.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2009-0 BRINE 1.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0101508 PA BRINE PA
2009-0 BRINE 370.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2009-0 FRACKING FLUID 6.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0101508 PA BRINE PA
2010-2 PRODUCED FLUID 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2011-1 PRODUCED FLUID 220.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2011-1 PRODUCED FLUID 100.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE PA
2011-2 PRODUCED FLUID 110.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185 RESERVED ENV SVC WASTE WATER TREATMENT FACILITY MOUNT PLEASANT PA
2012-2 PRODUCED FLUID 559.43 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185 RESERVED ENV SVC WASTE WATER TREATMENT FACILITY MOUNT PLEASANT PA
2013-1 PRODUCED FLUID 324.64 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185 RESERVED ENV SVC WASTE WATER TREATMENT FACILITY MOUNT PLEASANT PA
2013-2 PRODUCED FLUID 555.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005 RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER PA
2014-1 PRODUCED FLUID 677.5 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005 RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER PA
2014-2 PRODUCED FLUID 950.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005 RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1826331 2009-07-08 No Violations Noted site pit e/s ok
1826722 2009-08-28 No Violations Noted HORIZONTAL MARCELLUS UDI 124 RIGGING UP, CONDUCTOR ALREADY SET, PITS FENCED, EVERYTHING OK.
1826724 2009-09-03 No Violations Noted HOR MARCELLUS UDI124 DRILLING AHEAD. BURNT COAL AT 22 FT, NIEGHBORS SAY HIGH SCHOOL KIDS SET IT ON FIRE IN THE 60'S. EVERYTHING LOOKS GOOD
1829551 2009-09-17 No Violations Noted HORIZONTAL MARCELLUS-UDI 124 DRILLING AHEAD. 8834 IN THE DOG LEG, EX. TD IS 10500' EVERYTHING IS GOING AS PLANNED. THERE IS NO DRILLER'S LOG AVAILABLE IN THE DOGHOUSE. ALTHOUGH TOTCO KEEPS TRACK OF ALMOST EVERTHING AND TOP NOTCH COMPANY CONSULTANTS ARE ON LOCATION TO ANSWER ANY QUESTION, SOME DESCREPANCIES HAVE BEEN IDENTIFIED. ON 9-3-09 THE CASING LENGTHS GIVEN ARE LISTED ABOVE. TODAY I WAS GIVEN THE FOLLOWING WHICH I ASSUME ARE THE RATHOLE DEPTHS BELOW THE CASING. 13.38-503' 9 5/8-2330 AND THE 26" CONDUCTOR IS NOW 60'. KEEPING AN UP TO DATE DRILLER'S LOG AVAILABLE IN THE DOGHOUSE AT ALL TIMES ALLEVIATES CONFUSION AND PROVIDES THE INSPECTOR WITH EASILY ACCESSABLE INFORMATION ON DRILL CUTTINGS, CASING, CEMENT ETC. WITHOUT HAVING TO TRACK DOWN DRILLERS, MUDLOGGERS, AND CONSULTANTS
1834885 2009-09-24 No Violations Noted HOR MAR. UDI 124 HIT TD AT 11069. THEY ARE TRIPPING PIPE TODAY AND RUNNING CASING TOMORROW. WILL BE MOVING ONTO THE 3-H IN A FEW DAYS
1939508 2010-12-20 No Violations Noted equipped/E&S ok/tanks/tag ok
1963290 2011-03-29 Violation(s) Noted Site was completed with well in production. E&S plan was soaked with rain and irretrievable; place E&S holder with nut facing downward to prevent this in the future.

E&S controls still in place. Erosion was taking place near culvert along access road. Silt socks had been undercut by previous erosion events. Sediment had been carried off site. The area of erosion had not been seeded or mulched. Vegetative matting lined the road side ditches. Hay had been spread along fill slope of access road. Site was not yet restored. Well was completed 9/23/09.

608109 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
2000662 2011-07-25 Outstanding Violations - No Viols Req'd Site was completed with well in production.

E&S controls still in place. Site had been regraded and some growth was occurring, however erosion was taking place near culvert along access road and down channel to this culvert. No new violations noted at this time

2048758 2012-03-01 No Violations Noted Site visit was part of compliance evaluation of 3-29-11 inspection which resulted in an NOV for 102, 78, and violations of the ESCGP-1 permit.

Upper area of ditch line was lined with fabric. Entire ditch to colvert was rocked. Colvert was rocked on both sides. Side had good vegetaion and no more E&S issues at the time of this inspection. No violations noted at this time.

2149932 2013-03-20 No Violations Noted no violations noted
2159177 2013-04-09 No Violations Noted Inspection the result of an NOT received by the Department on 4/8/2013. At the time of inspection the well appeared to drilled and equipped for production. The well apparatus and brine tanks appear to be in sound working condition. The site appears to meet the restoration criteria of 70% uniform vegetative coverage. No observation of accelerated erosion and sedimentation in relation to the access road or well pad. The Department notes that the Operator has removed perimeter E&S controls. The site appears to meet the requirements set forth by the ESCGP-1 restoration and post construction water management plan. The Department approves the Operators request for the Notice of Termination, ESX09-129-0001.
2327995 2014-12-09 No Violations Noted 1 tank and 1 skid box onsite. Tag and e&s ok.

For data sources see[3]

References