If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-22148 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.803688,"lon":-76.22355,"icon":""}]} |
County: Bradford | |
Municipality: Herrick Township | |
Operator Name: SOUTHWESTERN ENERGY PROD CO | |
Well Pad ID: 148335 | |
Farm/Lease Name: FIELDS 1H | |
First Permit Date: 2012-03-14 | |
Last Permit Date: 2012-03-14 | |
Spud Date: 2012-05-10 | |
Unconventional: Yes | |
Horizontal: Yes | |
Well Status: ACTIVE | |
Violations: 0 | |
Latitude: 41.803688 | |
Longitude: -76.22355 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-2 | 708533.0 | 105.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-1 | 1068918.0 | 164.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-2 | 640006.0 | 134.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-1 | 384899.0 | 134.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-2 | 348476.0 | 160.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-02 | 49860.0 | 28.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-01 | 52518.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-03 | 56110.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-1 | DRILL CUTTINGS | 551.9 | Tons | LANDFILL | 101247 | KEYSTONE SANITARY LANDFILL | DUNMORE | PA |
2012-1 | DRILL CUTTINGS | 295.88 | Tons | LANDFILL | THR029 | TUNNELL HILL RECLAMATION LANDFILL | NEWLEXINGTON | OH |
2012-2 | DRILLING FLUID WASTE | 497.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT | WILLIAMSPORT | PA |
2012-2 | FLOWBACK FRACTURING SAND | 196.99 | Tons | LANDFILL | 101247 | KEYSTONE SANITARY LANDFILL | DUNMORE | PA |
2013-1 | FRACING FLUID WASTE | 55.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2013-1 | PRODUCED FLUID | 6.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2013-2 | FRACING FLUID WASTE | 105.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2013-2 | PRODUCED FLUID | 1.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-1 | PRODUCED FLUID | 1.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-2 | PRODUCED FLUID | 2.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
2095591 | 2012-08-06 | No Violations Noted | Cellar dry. Small amount of water between conductor and surface casings, however no visible bubbling. 40 psi on 51/2 | |||
2101196 | 2012-09-17 | No Violations Noted | Arrived at the site at 13:05. I approved of an alternative waste management practice (OG-71) for temporary storage an on-site pretreatment system of top-hole water, drilling fluid, hydro-fracturing flow back fluid and production fluid on 9-12-12. Darren Bishop and Frank Kelly of SEPCO were on-site during the inspection. SEPCO was in the process of preparing for flowback procedures. I was informed by Darren Bishop that a test run of filtration has been conducted thus far. Several light towers were observed to be housed on the surface of the ground of the Well Pad and there were a few areas of compromised liner integrity noted during the inspection. | |||
2159771 | 2013-04-18 | No Violations Noted | ||||
2229518 | 2013-12-13 | No Violations Noted | ||||
2243309 | 2014-01-31 | No Violations Noted | ||||
2249196 | 2014-02-26 | No Violations Noted |
For data sources see[3]