X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-117-20316

Well Details

Well ID: 37-117-20316
Loading map...
County: Tioga
Municipality: Ward Township
Operator Name: TALISMAN ENERGY USA INC
Well Pad ID: 148190
Farm/Lease Name: DCNR 587 02 002 01
First Permit Date: 2009-06-18
Last Permit Date: 2009-06-18
Spud Date: 2009-09-14
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 3
Latitude: 41.698069
Longitude: -76.964601

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-3 74897.6 10.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 938988.6 143.0 0.0 0.0 0.0 0.0
2010-2 938988.6 143.0 0.0 0.0 0.0 0.0
2011-1 913428.0 177.0 0.0 0.0 0.0 0.0
2011-2 672413.0 182.0 0.0 0.0 0.0 0.0
2012-1 320982.0 140.0 0.0 0.0 0.0 0.0
2012-2 352520.1 183.0 0.0 0.0 0.0 0.0
2013-1 286611.0 180.0 0.0 0.0 0.0 0.0
2013-2 252625.8 184.0 0.0 0.0 0.0 0.0
2014-1 213719.3 178.0 0.0 0.0 0.0 0.0
2014-2 207640.8 180.0 0.0 0.0 0.0 0.0
2015-02 27235.0 28.0 0.0 0.0 0.0 0.0
2015-01 31636.5 31.0 0.0 0.0 0.0 0.0
2015-03 30116.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-2 DRILLING FLUID WASTE 312.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123D001X TERRAQUA RESOURCE MANAGEMENT WILLIAMSPORT PA
2010-2 PRODUCED FLUID 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123D001X TERRAQUA RESOURCE MANAGEMENT WILLIAMSPORT PA
2010-2 PRODUCED FLUID 110.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784 WASTE TREATMENT CORPORATION WARREN PA
2011-1 DRILL CUTTINGS 83.0 Tons LANDFILL NY31346244 HAKES LANDFILL PAINTED POST NY
2011-1 DRILL CUTTINGS 54.0 Tons LANDFILL NY # 02S17 HYLAND FACILITY ASSOCIATION ANGELICA NY
2011-1 FRACING FLUID WASTE 399.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123D001X TERRAQUA RESOURCE MANAGEMENT WILLIAMSPORT PA
2011-2 PRODUCED FLUID 429.6 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR0123 HYDRO RECOVERY LP BLOSSBURG FACILITY BLOSSBURG PA
2011-2 PRODUCED FLUID 15.08 Bbl REUSE OTHER THAN ROAD SPREADING REUSE OF BRINE TO FRAC A WELL
2011-2 PRODUCED FLUID 135.95 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123D001X TERRAQUA RESOURCE MANAGEMENT WILLIAMSPORT PA
2012-1 PRODUCED FLUID 25.62 Bbl INJECTION DISPOSAL WELL 34-133-24096 GROSELLE INECTION WELL # 2 GARRETTSVILLE OH
2012-1 PRODUCED FLUID 36.32 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR0123 HYDRO RECOVERY LP BLOSSBURG FACILITY BLOSSBURG PA
2012-1 PRODUCED FLUID 552.11 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 PRODUCED FLUID 78.01 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR0123 HYDRO RECOVERY LP BLOSSBURG FACILITY BLOSSBURG PA
2012-2 PRODUCED FLUID 147.01 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 PRODUCED FLUID 60.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123D001X TERRAQUA RESOURCE MANAGEMENT WILLIAMSPORT PA
2013-1 PRODUCED FLUID 85.67 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2013-1 PRODUCED FLUID 59.97 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123D001X TERRAQUA RESOURCE MANAGEMENT WILLIAMSPORT PA
2013-2 PRODUCED FLUID 266.76 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 1.12 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR0123 HYDRO RECOVERY LP BLOSSBURG FACILITY BLOSSBURG PA
2014-1 PRODUCED FLUID 196.28 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 116.79 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1823432 2009-08-25 Violation(s) Noted Inspection report and 3rd page NOV sent 8/27/2009 to Eric Potter. Picture of Silt fence included. VIOLS 102.49(b) and 102.4(b)(5) 117-20317,117-20288, &117-20289 same well pad dulpicate inspections. 8/27/2009 MAB 570100 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) siltfence maintenance, Diversion ditch and silt trap improper installation
1823432 2009-08-25 Violation(s) Noted Inspection report and 3rd page NOV sent 8/27/2009 to Eric Potter. Picture of Silt fence included. VIOLS 102.49(b) and 102.4(b)(5) 117-20317,117-20288, &117-20289 same well pad dulpicate inspections. 8/27/2009 MAB 570101 102.4INADPLN - E&S Plan not adequate Plan not reflective of site conditions 102.4(b)(5)
1852919 2009-12-28 No Violations Noted
1919472 2010-10-12 No Violations Noted Follow up to close violations from August 25, 2009
2047117 2012-02-23 Viol(s) Noted & Immediately Corrected Hyd oil on ground. They put absorbent pads on it 633155 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Hyd oil on ground

For data sources see[3]

References