If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-25670 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.922005,"lon":-80.218441,"icon":""}]} |
County: Greene | |
Municipality: Franklin Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 148450 | |
Farm/Lease Name: GROOMS UNIT 5H | |
First Permit Date: 2011-02-14 | |
Last Permit Date: 2011-02-14 | |
Spud Date: 2011-08-29 | |
Unconventional: Yes | |
Horizontal: Yes | |
Well Status: ACTIVE | |
Violations: 0 | |
Latitude: 39.922005 | |
Longitude: -80.218441 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-1 | 932847.0 | 181.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-2 | 722571.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-1 | 453462.0 | 181.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-2 | 368516.0 | 176.0 | 133.76 | 176.0 | 0.0 | 0.0 |
2015-02 | 56073.0 | 28.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-01 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-03 | 62371.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2011-2 | DRILLING FLUID WASTE | 7.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2012-1 | DRILLING FLUID WASTE | 110.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
2012-1 | DRILLING FLUID WASTE | 3.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2012-2 | DRILLING FLUID WASTE | 185.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2012-2 | FRACING FLUID WASTE | 3.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
2012-2 | FRACING FLUID WASTE | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2013-1 | FRACING FLUID WASTE | 1.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
2013-1 | FRACING FLUID WASTE | 102.5 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2013-1 | PRODUCED FLUID | 21.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
2013-1 | PRODUCED FLUID | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2013-2 | FLOWBACK FRACTURING SAND | 27.71 | Tons | LANDFILL | 073 114 654 | US ECOLOGY IDAHO, INC. | GRAND VIEW | ID |
2013-2 | FRACING FLUID WASTE | 2.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2013-2 | FRACING FLUID WASTE | 736.25 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2013-2 | PRODUCED FLUID | 10.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2013-2 | PRODUCED FLUID | 5.0 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2014-1 | FLOWBACK FRACTURING SAND | 2.22 | Tons | LANDFILL | 100172 | ARDEN LANDFILL | WASHINGTON | PA |
2014-1 | PRODUCED FLUID | 973.25 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-1 | PRODUCED FLUID | 257.0 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2014-1 | PRODUCED FLUID | 8.75 | Bbl | INJECTION DISPOSAL WELL | 34-121-23995 | WARREN DRILLING CO #1 (SWIW #6) | DEXTER CITY | OH |
2014-2 | PRODUCED FLUID | 616.5 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-2 | PRODUCED FLUID | 133.75 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2014-2 | PRODUCED FLUID | 15.0 | Bbl | INJECTION DISPOSAL WELL | 34-121-23995 | WARREN DRILLING CO #1 (SWIW #6) | DEXTER CITY | OH |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
2001324 | 2011-05-31 | No Violations Noted | ||||
2006278 | 2011-09-21 | No Violations Noted | CODUCTOR SET. DRILLING GETTING STARTED. | |||
2014177 | 2011-10-18 | No Violations Noted | ||||
2027540 | 2011-09-13 | No Violations Noted | The Department was at the above referenced Marcellus Well to conduct a Routine Inspection. The operator is finishing up construction of the pad and lining the pits. The Department reviewed the E/S Plan on site. The E/S controls appear to be in good condition. The Operator is currently adding E/S controls to make sure all the sediment stays on site. Temporary stabilization has been obtained on this site. Grass is beginning to grow on the fill slopes. | |||
2035027 | 2012-01-09 | No Violations Noted | WELL DRILLED TO KOP. SITE AND E&S OK. | |||
2043012 | 2012-02-03 | No Violations Noted | 24" @ 63'; 16' @ 530'; 11 3/4"@ 1162 (NO COAL MINE);8 5/8"@ 2835'; Patterson Rig 334 drilling @ 7053'; Last well to be drilled on 8 well pad | |||
2051407 | 2012-03-13 | No Violations Noted | Drilling complete TD 12548' 5 1/2 production string. | |||
2051459 | 2012-03-13 | No Violations Noted |
For data sources see[3]