X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-25670

Well Details

Well ID: 37-059-25670
Loading map...
County: Greene
Municipality: Franklin Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148450
Farm/Lease Name: GROOMS UNIT 5H
First Permit Date: 2011-02-14
Last Permit Date: 2011-02-14
Spud Date: 2011-08-29
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 39.922005
Longitude: -80.218441

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 932847.0 181.0 0.0 0.0 0.0 0.0
2013-2 722571.0 184.0 0.0 0.0 0.0 0.0
2014-1 453462.0 181.0 0.0 0.0 0.0 0.0
2014-2 368516.0 176.0 133.76 176.0 0.0 0.0
2015-02 56073.0 28.0 0.0 0.0 0.0 0.0
2015-01 0.0 0.0 0.0 0.0 0.0 0.0
2015-03 62371.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-2 DRILLING FLUID WASTE 7.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-1 DRILLING FLUID WASTE 110.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 DRILLING FLUID WASTE 3.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 DRILLING FLUID WASTE 185.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 FRACING FLUID WASTE 3.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-2 FRACING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-1 FRACING FLUID WASTE 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 FRACING FLUID WASTE 102.5 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-1 PRODUCED FLUID 21.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 PRODUCED FLUID 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-2 FLOWBACK FRACTURING SAND 27.71 Tons LANDFILL 073 114 654 US ECOLOGY IDAHO, INC. GRAND VIEW ID
2013-2 FRACING FLUID WASTE 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-2 FRACING FLUID WASTE 736.25 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-2 PRODUCED FLUID 10.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-2 PRODUCED FLUID 5.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2014-1 FLOWBACK FRACTURING SAND 2.22 Tons LANDFILL 100172 ARDEN LANDFILL WASHINGTON PA
2014-1 PRODUCED FLUID 973.25 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 257.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2014-1 PRODUCED FLUID 8.75 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) DEXTER CITY OH
2014-2 PRODUCED FLUID 616.5 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 133.75 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2014-2 PRODUCED FLUID 15.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) DEXTER CITY OH

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2001324 2011-05-31 No Violations Noted
2006278 2011-09-21 No Violations Noted CODUCTOR SET. DRILLING GETTING STARTED.
2014177 2011-10-18 No Violations Noted
2027540 2011-09-13 No Violations Noted The Department was at the above referenced Marcellus Well to conduct a Routine Inspection. The operator is finishing up construction of the pad and lining the pits. The Department reviewed the E/S Plan on site. The E/S controls appear to be in good condition. The Operator is currently adding E/S controls to make sure all the sediment stays on site. Temporary stabilization has been obtained on this site. Grass is beginning to grow on the fill slopes.
2035027 2012-01-09 No Violations Noted WELL DRILLED TO KOP. SITE AND E&S OK.
2043012 2012-02-03 No Violations Noted 24" @ 63'; 16' @ 530'; 11 3/4"@ 1162 (NO COAL MINE);8 5/8"@ 2835'; Patterson Rig 334 drilling @ 7053'; Last well to be drilled on 8 well pad
2051407 2012-03-13 No Violations Noted Drilling complete TD 12548' 5 1/2 production string.
2051459 2012-03-13 No Violations Noted

For data sources see[3]

References