X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-033-26681

Well Details

Well ID: 37-033-26681
Loading map...
County: Clearfield
Municipality: Lawrence Township
Operator Name: EOG RESOURCES INC
Well Pad ID: 147030
Farm/Lease Name: PUNXSUTAWNEY HUNTING CLUB 8H
First Permit Date: 2008-07-11
Last Permit Date: 2009-07-28
Spud Date: 2009-08-05
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 3
Latitude: 41.171648
Longitude: -78.447156

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2008-0 0.0 0.0 0.0 0.0 0.0 0.0
2010-3 105027.25 83.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 144560.0 184.0 0.0 0.0 0.0 0.0
2010-2 144560.0 184.0 0.0 0.0 0.0 0.0
2011-1 112530.0 181.0 0.0 0.0 0.0 0.0
2011-2 101954.0 184.0 0.0 0.0 0.0 0.0
2012-1 130906.0 182.0 0.0 0.0 0.0 0.0
2012-2 89805.0 184.0 0.0 0.0 0.0 0.0
2013-1 75615.0 174.0 0.0 0.0 0.0 0.0
2013-2 73001.0 184.0 0.0 0.0 0.0 0.0
2014-1 63067.35 168.0 0.0 0.0 0.0 0.0
2014-2 59863.68 184.0 0.0 0.0 0.0 0.0
2015-02 8860.22 28.0 0.0 0.0 0.0 0.0
2015-01 9791.26 31.0 0.0 0.0 0.0 0.0
2015-03 9722.8 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-3 PRODUCED FLUID 2.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2010-3 PRODUCED FLUID 108.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2010-3 PRODUCED FLUID 3.0 Bbl REUSE OTHER THAN ROAD SPREADING FRAC WATER REUSE PA
2010-3 PRODUCED FLUID 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0023213 RIDGWAY BOROUGH SEWAGE TREATMENT PLANT RIDGWAY PA
2010-3 PRODUCED FLUID 50.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784 WASTE TREATMENT CORPORATION WARREN PA
2010-2 PRODUCED FLUID 4.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2010-2 PRODUCED FLUID 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2010-2 PRODUCED FLUID 900.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0023213 RIDGWAY BOROUGH SEWAGE TREATMENT PLANT RIDGWAY PA
2011-1 PRODUCED FLUID 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2011-1 PRODUCED FLUID 493.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2011-1 PRODUCED FLUID 192.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127 NORTHSTAR #1 YOUNGSTOWN OH
2011-1 PRODUCED FLUID 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE OF BRINE TO FRAC A WELL
2011-1 PRODUCED FLUID 267.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0023213 RIDGWAY BOROUGH SEWAGE TREATMENT PLANT RIDGWAY PA
2011-2 PRODUCED FLUID 200.0 Bbl INJECTION DISPOSAL WELL 34-049-23127 NORTH STAR YOUNGSTOWN OH
2011-2 PRODUCED FLUID 4.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE OF BRINE TO FRAC A WELL
2012-1 PRODUCED FLUID 95.0 Bbl INJECTION DISPOSAL WELL 34-155-23795 PANDER #1 (SWIW #15) NEWTON FALLS OH
2012-1 PRODUCED FLUID 4.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 PRODUCED FLUID 285.0 Bbl INJECTION DISPOSAL WELL 34-151-23420 BELDEN & BLAKE WELL # 2 HARTVILLE OH
2012-2 PRODUCED FLUID 689.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1 BLAZEK PUMP AND WELL HIRAM OH
2012-2 PRODUCED FLUID 617.0 Bbl INJECTION DISPOSAL WELL 34-155-23584 KOONTZ #1 DISPOSAL WELL WARREN OH
2012-2 PRODUCED FLUID 285.0 Bbl INJECTION DISPOSAL WELL 34-155-23795 PANDER #1 (SWIW #15) NEWTON FALLS OH
2012-2 PRODUCED FLUID 190.0 Bbl INJECTION DISPOSAL WELL 34-007-22038 PAROBEK #2 (SWIW #12) OH
2012-2 PRODUCED FLUID 230.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 PRODUCED FLUID 1.0 Bbl STORAGE PENDING DISPOSAL OR REUSE TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE PA
2012-2 PRODUCED FLUID 392.0 Bbl INJECTION DISPOSAL WELL 34-155-21893 WOLF #1 DISP WELL NEWTON FALLS OH
2013-1 PRODUCED FLUID 220.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2013-1 PRODUCED FLUID 723.8 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123D001X TERRAQUA RESOURCE MANAGEMENT WILLIAMSPORT PA
2013-2 PRODUCED FLUID 105.0 Bbl INJECTION DISPOSAL WELL 34-155-22403 ANNAROCK D-1 FOWLER OH
2013-2 PRODUCED FLUID 106.8 Bbl INJECTION DISPOSAL WELL 34-151-23420 BELDEN & BLAKE WELL # 2 HARTVILLE OH
2013-2 PRODUCED FLUID 190.0 Bbl INJECTION DISPOSAL WELL 34-133-24096 GROSELLE INECTION WELL # 2 GARRETTSVILLE OH
2013-2 PRODUCED FLUID 302.0 Bbl INJECTION DISPOSAL WELL 34-155-21438 KLEESE #1 (SWIW #18) VIENNA OH
2013-2 PRODUCED FLUID 524.0 Bbl INJECTION DISPOSAL WELL 34-155-23732 KLEESE #4 (SWIW #24) VIENNA OH
2013-2 PRODUCED FLUID 95.0 Bbl INJECTION DISPOSAL WELL 34-133-21076 MYERS #1 (STALLION SWD LP) ATAWATER OH
2013-2 PRODUCED FLUID 130.0 Bbl INJECTION DISPOSAL WELL 34-155-23795 PANDER #1 (SWIW #15) NEWTON FALLS OH
2013-2 PRODUCED FLUID 978.0 Bbl STORAGE PENDING DISPOSAL OR REUSE TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE PA
2013-2 PRODUCED FLUID 95.0 Bbl INJECTION DISPOSAL WELL 34-133-20114 WILCOX #1 ROOTSTOWN OH
2013-2 PRODUCED FLUID 68.0 Bbl INJECTION DISPOSAL WELL 34-155-21893 WOLF #1 DISP WELL NEWTON FALLS OH
2013-2 PRODUCED FLUID 68.0 Bbl INJECTION DISPOSAL WELL 34-155-21894 WOLF #2 DISPOSAL WELL NEWTON FALLS OH
2013-2 PRODUCED FLUID 68.0 Bbl INJECTION DISPOSAL WELL 34-155-23203 WOLF #4 DISPOSAL WELL NEWTON FALLS OH
2014-1 PRODUCED FLUID 845.0 Bbl INJECTION DISPOSAL WELL 34-155-22403 ANNAROCK D-1 FOWLER OH
2014-1 PRODUCED FLUID 202.0 Bbl INJECTION DISPOSAL WELL 34-155-21447 KLEESE #2 (SWIW #19) VIENNA OH
2014-1 PRODUCED FLUID 209.0 Bbl INJECTION DISPOSAL WELL 34-155-23732 KLEESE #4 (SWIW #24) VIENNA OH
2014-1 PRODUCED FLUID 525.0 Bbl INJECTION DISPOSAL WELL 34-155-23795 PANDER #1 (SWIW #15) NEWTON FALLS OH
2014-1 PRODUCED FLUID 78.3 Bbl INJECTION DISPOSAL WELL 34-155-21893 WOLF #1 DISP WELL NEWTON FALLS OH
2014-1 PRODUCED FLUID 78.3 Bbl INJECTION DISPOSAL WELL 34-155-21894 WOLF #2 DISPOSAL WELL NEWTON FALLS OH
2014-1 PRODUCED FLUID 78.3 Bbl INJECTION DISPOSAL WELL 34-155-23203 WOLF #4 DISPOSAL WELL NEWTON FALLS OH
2014-2 PRODUCED FLUID 105.0 Bbl INJECTION DISPOSAL WELL 34-155-22403 ANNAROCK D-1 FOWLER OH
2014-2 PRODUCED FLUID 415.0 Bbl INJECTION DISPOSAL WELL 34-155-21438 KLEESE #1 (SWIW #18) VIENNA OH
2014-2 PRODUCED FLUID 105.0 Bbl INJECTION DISPOSAL WELL 34-155-21447 KLEESE #2 (SWIW #19) VIENNA OH
2014-2 PRODUCED FLUID 610.0 Bbl INJECTION DISPOSAL WELL 34-155-23732 KLEESE #4 (SWIW #24) VIENNA OH
2014-2 PRODUCED FLUID 199.0 Bbl INJECTION DISPOSAL WELL 34-155-23759 KLEESE #5 (SWIW #25) TRUMBULL OH
2014-2 PRODUCED FLUID 104.0 Bbl INJECTION DISPOSAL WELL 34-155-23223 NATALE #2 (SWIW #29) VIENNA OH
2014-2 PRODUCED FLUID 105.0 Bbl INJECTION DISPOSAL WELL 34-155-21893 WOLF #1 DISP WELL NEWTON FALLS OH
2014-2 PRODUCED FLUID 105.0 Bbl INJECTION DISPOSAL WELL 34-155-21894 WOLF #2 DISPOSAL WELL NEWTON FALLS OH
2014-2 PRODUCED FLUID 105.0 Bbl INJECTION DISPOSAL WELL 34-155-23203 WOLF #4 DISPOSAL WELL NEWTON FALLS OH

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1822534 2008-08-13 No Violations Noted The following items were noted during the inspection:

-Met with Mr. Kelly Spoonts, Drilling Consultant -Currently drilled to 6,250﾿ - 7 ﾿ casing set at 1,317﾿ cemented w/ 350 sx cement. -Waiting on Schlumberger to repair MWD tool to resume drilling. -Derrick, substructure and BOP appear sound. -Site sign and E & S plan were on site. -E&S BMPs were in place and working adequately. -Reserve pits met regulatory standards

1823888 2009-08-13 No Violations Noted Site inspected with OGI Bruce Jankura. Also spoke with Drilling and Completion Consultant, Kelly Spoonts on site. Conductor pipe and top hole had already been drilled, drilling of horizontal section was in progress. All disturbed areas have been seeded and mulched with about 45% vegetation already grown back in. Site has brush row reinforced with line of silt fence surrounding parameter. All E&S control BMPs have been installed properly and are working adequately. The pit is constructed and lined properly. Liner appears sound with no visible cuts or punctures. More than 2ft of freeboard is being maintained
1824644 2009-08-27 No Violations Noted Site was inspected from perimeter of pad. In response to complaint #265864, Alex branch was field tested from just below McGregor Rd Crossing to headwaters. Stream begins approximately 700 Ft from edge of well pad. Meter readings indicated elevated TDS and Conductivity here. Pit appears sound. A properly installed sediment fence reinforced with haybales follows the edge of the pad. The are no signs of erosion or that any fluids have left the site on the surface. Inspection was conducted jointly with the following personel from the PA Fish and Boat Commission: Waterways Conservation Officer, Robert V. Dunbar, Fisheries Biologists, Steven Kepler and Heather Smiles. Officer Dunbar spoke with Matt Williams on-site. Mr. Williams mentioned that the well had low water returns.
1829048 2009-09-04 Violation(s) Noted Miller - on-site meeting w/EOG & PaFBC reps, multiple investigations between 8/25/09 & 9/4/09 resulted in determination that activities at this well site released contaminants from Marcellus shale drilling to atmosphere, written response requested w/in 10 days. See 401CSL violation comment. NOV to MBC for input 9/21, insp not previously input. MBC 9/21/09 571760 401CSL - Discharge of pollultional material to waters of Commonwealth. Integrity issues at pit on-site most likely cause of release to Alex Branch the headwaters w/in 700 ft of well pad, elevated barium, strontium and chloride levels detected.
1829048 2009-09-04 Violation(s) Noted Miller - on-site meeting w/EOG & PaFBC reps, multiple investigations between 8/25/09 & 9/4/09 resulted in determination that activities at this well site released contaminants from Marcellus shale drilling to atmosphere, written response requested w/in 10 days. See 401CSL violation comment. NOV to MBC for input 9/21, insp not previously input. MBC 9/21/09 571760 401CSL - Discharge of pollultional material to waters of Commonwealth. Integrity issues at pit on-site most likely cause of release to Alex Branch the headwaters w/in 700 ft of well pad, elevated barium, strontium and chloride levels detected.
1829540 2009-09-10 No Violations Noted Site was inspected with Nathan Wells, Tom McNerney and Caleb Woolever. Pit had been excavated and all recovered materials placed in 9 containers that have been covered and stored on-site until approval has been aquired to haul them to landfill. A water truck comes every other day to pull any water produced from contents. Pit has been backfilled with cleanfill. Field testing shows TDS, conductivity and pH levels in stream originating about 700' from pad have improved significantly. Casing being run on day of inspection, no E&S problems at this time
1833329 2009-09-30 No Violations Noted -No activity on site at this time. Fraccing tanks were being staged further up the access road (on remaing pad of #3H)

-containers that were used for holding the excavated pit contents remain on site. Most of the contents have been removed. -E&S controls

1834892 2009-09-30 No Violations Noted The following items were noted during the inspection:

-All pits and contents removed / disposed and rough graded. -Well drilled and cased, waiting on frac job. -Water in cellar around wellhead - no bubbles seen. -No activity at report time. -Site sign and E & S plan were on site. -E&S BMPs were in place and working adequately.

1836100 2009-10-14 Violation(s) Noted Spill response: Monday, October 12, 2009 Joe Wilson, independent consultant, noticed spring behind 8H was cloudy and sudsy. EOG was notified and found that a gasket on one of the holding tanks had gone bad. approx. 190 bbls of fluids were unaccounted for. There was no indication of a spill on-site. Fluid containing about 98% fresh water, 1.06% well wash and .25% ultra vis, soaked into the pad and made its way to the nearby stream. The stream had booms placed in it and the water was being pumped out to be contained on site. Suds were seen as far down as Camp Read. EOG also flushed the area a couple of times with fresh water. They will continue to monitor the stream quality and flush if necessary. Greg Shaffer, of EOG along with Joe wilson were on site during the inspection. Representatives of the Fish and Boat Commission were also present 573592 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt
1836100 2009-10-14 Violation(s) Noted Spill response: Monday, October 12, 2009 Joe Wilson, independent consultant, noticed spring behind 8H was cloudy and sudsy. EOG was notified and found that a gasket on one of the holding tanks had gone bad. approx. 190 bbls of fluids were unaccounted for. There was no indication of a spill on-site. Fluid containing about 98% fresh water, 1.06% well wash and .25% ultra vis, soaked into the pad and made its way to the nearby stream. The stream had booms placed in it and the water was being pumped out to be contained on site. Suds were seen as far down as Camp Read. EOG also flushed the area a couple of times with fresh water. They will continue to monitor the stream quality and flush if necessary. Greg Shaffer, of EOG along with Joe wilson were on site during the inspection. Representatives of the Fish and Boat Commission were also present 573592 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt
1836100 2009-10-14 Violation(s) Noted Spill response: Monday, October 12, 2009 Joe Wilson, independent consultant, noticed spring behind 8H was cloudy and sudsy. EOG was notified and found that a gasket on one of the holding tanks had gone bad. approx. 190 bbls of fluids were unaccounted for. There was no indication of a spill on-site. Fluid containing about 98% fresh water, 1.06% well wash and .25% ultra vis, soaked into the pad and made its way to the nearby stream. The stream had booms placed in it and the water was being pumped out to be contained on site. Suds were seen as far down as Camp Read. EOG also flushed the area a couple of times with fresh water. They will continue to monitor the stream quality and flush if necessary. Greg Shaffer, of EOG along with Joe wilson were on site during the inspection. Representatives of the Fish and Boat Commission were also present 573593 401CSL - Discharge of pollultional material to waters of Commonwealth.
1836100 2009-10-14 Violation(s) Noted Spill response: Monday, October 12, 2009 Joe Wilson, independent consultant, noticed spring behind 8H was cloudy and sudsy. EOG was notified and found that a gasket on one of the holding tanks had gone bad. approx. 190 bbls of fluids were unaccounted for. There was no indication of a spill on-site. Fluid containing about 98% fresh water, 1.06% well wash and .25% ultra vis, soaked into the pad and made its way to the nearby stream. The stream had booms placed in it and the water was being pumped out to be contained on site. Suds were seen as far down as Camp Read. EOG also flushed the area a couple of times with fresh water. They will continue to monitor the stream quality and flush if necessary. Greg Shaffer, of EOG along with Joe wilson were on site during the inspection. Representatives of the Fish and Boat Commission were also present 573593 401CSL - Discharge of pollultional material to waters of Commonwealth.
1836167 2009-10-19 Outstanding Violations - No Viols Req'd -Site inspected with WQS Supervisor John Ryder and Geologic Trainee Caleb Woolever. Joe Wilson was conducting routine sampling at the Spring affected by the recent spill.

-Tanks are still staged on-site, there is no activity at this time -Mr. Wilson indi

1851110 2009-12-15 No Violations Noted #NAME?
1852738 2009-12-29 No Violations Noted Conducted Inspection with WQS Jessica Miller and WQS Heather Agosta.

Drilling is completed and a digital meter is connected to well. Production equipment is on location but not connected to well. Frac Tanks are on location. One tank is leaking from valve and is freezing.

1853885 2009-12-29 No Violations Noted -Inspection Conducted with OGI Travis and WQS from Altoona, Heather Agosta.

-no heavy activity has occurred since the last inspection. Production tanks have been dropped off on location -It appears that freezing on frac tank H1245 has caused some water e

1884384 2010-05-12 De minimus Violations Noted Production well in line with digital meter. Well tag did not have permit number, I informed the well tender, and he will replace.
1907334 2010-08-16 No Violations Noted
1919583 2010-09-27 No Violations Noted
1954461 2011-03-02 No Violations Noted

For data sources see[3]

References