Well ID: 37-033-26681 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.171648,"lon":-78.447156,"icon":""}]} |
County: Clearfield | |
Municipality: Lawrence Township | |
Operator Name: EOG RESOURCES INC | |
Well Pad ID: 147030 | |
Farm/Lease Name: PUNXSUTAWNEY HUNTING CLUB 8H | |
First Permit Date: 2008-07-11 | |
Last Permit Date: 2009-07-28 | |
Spud Date: 2009-08-05 | |
Unconventional: Yes | |
Horizontal: Yes | |
Well Status: ACTIVE | |
Violations: 3 | |
Latitude: 41.171648 | |
Longitude: -78.447156 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2008-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-3 | 105027.25 | 83.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 144560.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 144560.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 112530.0 | 181.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 101954.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 130906.0 | 182.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-2 | 89805.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-1 | 75615.0 | 174.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-2 | 73001.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-1 | 63067.35 | 168.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-2 | 59863.68 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-02 | 8860.22 | 28.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-01 | 9791.26 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-03 | 9722.8 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2010-3 | PRODUCED FLUID | 2.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | FLUID RECOVERY SERVICE FRANKLIN FACILITY | FRANKLIN | PA |
2010-3 | PRODUCED FLUID | 108.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
2010-3 | PRODUCED FLUID | 3.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | FRAC WATER REUSE | PA | ||
2010-3 | PRODUCED FLUID | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0023213 | RIDGWAY BOROUGH SEWAGE TREATMENT PLANT | RIDGWAY | PA |
2010-3 | PRODUCED FLUID | 50.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 | WASTE TREATMENT CORPORATION | WARREN | PA |
2010-2 | PRODUCED FLUID | 4.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | FLUID RECOVERY SERVICE FRANKLIN FACILITY | FRANKLIN | PA |
2010-2 | PRODUCED FLUID | 2.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
2010-2 | PRODUCED FLUID | 900.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0023213 | RIDGWAY BOROUGH SEWAGE TREATMENT PLANT | RIDGWAY | PA |
2011-1 | PRODUCED FLUID | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | FLUID RECOVERY SERVICE FRANKLIN FACILITY | FRANKLIN | PA |
2011-1 | PRODUCED FLUID | 493.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
2011-1 | PRODUCED FLUID | 192.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 | NORTHSTAR #1 | YOUNGSTOWN | OH |
2011-1 | PRODUCED FLUID | 2.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE OF BRINE TO FRAC A WELL | |||
2011-1 | PRODUCED FLUID | 267.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0023213 | RIDGWAY BOROUGH SEWAGE TREATMENT PLANT | RIDGWAY | PA |
2011-2 | PRODUCED FLUID | 200.0 | Bbl | INJECTION DISPOSAL WELL | 34-049-23127 | NORTH STAR | YOUNGSTOWN | OH |
2011-2 | PRODUCED FLUID | 4.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE OF BRINE TO FRAC A WELL | |||
2012-1 | PRODUCED FLUID | 95.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2012-1 | PRODUCED FLUID | 4.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-2 | PRODUCED FLUID | 285.0 | Bbl | INJECTION DISPOSAL WELL | 34-151-23420 | BELDEN & BLAKE WELL # 2 | HARTVILLE | OH |
2012-2 | PRODUCED FLUID | 689.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 525-1 | BLAZEK PUMP AND WELL | HIRAM | OH |
2012-2 | PRODUCED FLUID | 617.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23584 | KOONTZ #1 DISPOSAL WELL | WARREN | OH |
2012-2 | PRODUCED FLUID | 285.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2012-2 | PRODUCED FLUID | 190.0 | Bbl | INJECTION DISPOSAL WELL | 34-007-22038 | PAROBEK #2 (SWIW #12) | OH | |
2012-2 | PRODUCED FLUID | 230.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-2 | PRODUCED FLUID | 1.0 | Bbl | STORAGE PENDING DISPOSAL OR REUSE | TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE | PA | ||
2012-2 | PRODUCED FLUID | 392.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL | NEWTON FALLS | OH |
2013-1 | PRODUCED FLUID | 220.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2013-1 | PRODUCED FLUID | 723.8 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123D001X | TERRAQUA RESOURCE MANAGEMENT | WILLIAMSPORT | PA |
2013-2 | PRODUCED FLUID | 105.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-22403 | ANNAROCK D-1 | FOWLER | OH |
2013-2 | PRODUCED FLUID | 106.8 | Bbl | INJECTION DISPOSAL WELL | 34-151-23420 | BELDEN & BLAKE WELL # 2 | HARTVILLE | OH |
2013-2 | PRODUCED FLUID | 190.0 | Bbl | INJECTION DISPOSAL WELL | 34-133-24096 | GROSELLE INECTION WELL # 2 | GARRETTSVILLE | OH |
2013-2 | PRODUCED FLUID | 302.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) | VIENNA | OH |
2013-2 | PRODUCED FLUID | 524.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23732 | KLEESE #4 (SWIW #24) | VIENNA | OH |
2013-2 | PRODUCED FLUID | 95.0 | Bbl | INJECTION DISPOSAL WELL | 34-133-21076 | MYERS #1 (STALLION SWD LP) | ATAWATER | OH |
2013-2 | PRODUCED FLUID | 130.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2013-2 | PRODUCED FLUID | 978.0 | Bbl | STORAGE PENDING DISPOSAL OR REUSE | TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE | PA | ||
2013-2 | PRODUCED FLUID | 95.0 | Bbl | INJECTION DISPOSAL WELL | 34-133-20114 | WILCOX #1 | ROOTSTOWN | OH |
2013-2 | PRODUCED FLUID | 68.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL | NEWTON FALLS | OH |
2013-2 | PRODUCED FLUID | 68.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21894 | WOLF #2 DISPOSAL WELL | NEWTON FALLS | OH |
2013-2 | PRODUCED FLUID | 68.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23203 | WOLF #4 DISPOSAL WELL | NEWTON FALLS | OH |
2014-1 | PRODUCED FLUID | 845.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-22403 | ANNAROCK D-1 | FOWLER | OH |
2014-1 | PRODUCED FLUID | 202.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21447 | KLEESE #2 (SWIW #19) | VIENNA | OH |
2014-1 | PRODUCED FLUID | 209.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23732 | KLEESE #4 (SWIW #24) | VIENNA | OH |
2014-1 | PRODUCED FLUID | 525.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23795 | PANDER #1 (SWIW #15) | NEWTON FALLS | OH |
2014-1 | PRODUCED FLUID | 78.3 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL | NEWTON FALLS | OH |
2014-1 | PRODUCED FLUID | 78.3 | Bbl | INJECTION DISPOSAL WELL | 34-155-21894 | WOLF #2 DISPOSAL WELL | NEWTON FALLS | OH |
2014-1 | PRODUCED FLUID | 78.3 | Bbl | INJECTION DISPOSAL WELL | 34-155-23203 | WOLF #4 DISPOSAL WELL | NEWTON FALLS | OH |
2014-2 | PRODUCED FLUID | 105.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-22403 | ANNAROCK D-1 | FOWLER | OH |
2014-2 | PRODUCED FLUID | 415.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) | VIENNA | OH |
2014-2 | PRODUCED FLUID | 105.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21447 | KLEESE #2 (SWIW #19) | VIENNA | OH |
2014-2 | PRODUCED FLUID | 610.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23732 | KLEESE #4 (SWIW #24) | VIENNA | OH |
2014-2 | PRODUCED FLUID | 199.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23759 | KLEESE #5 (SWIW #25) | TRUMBULL | OH |
2014-2 | PRODUCED FLUID | 104.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23223 | NATALE #2 (SWIW #29) | VIENNA | OH |
2014-2 | PRODUCED FLUID | 105.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21893 | WOLF #1 DISP WELL | NEWTON FALLS | OH |
2014-2 | PRODUCED FLUID | 105.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21894 | WOLF #2 DISPOSAL WELL | NEWTON FALLS | OH |
2014-2 | PRODUCED FLUID | 105.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23203 | WOLF #4 DISPOSAL WELL | NEWTON FALLS | OH |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1822534 | 2008-08-13 | No Violations Noted | The following items were noted during the inspection:
-Met with Mr. Kelly Spoonts, Drilling Consultant -Currently drilled to 6,250﾿ - 7 ﾿ casing set at 1,317﾿ cemented w/ 350 sx cement. -Waiting on Schlumberger to repair MWD tool to resume drilling. -Derrick, substructure and BOP appear sound. -Site sign and E & S plan were on site. -E&S BMPs were in place and working adequately. -Reserve pits met regulatory standards |
|||
1823888 | 2009-08-13 | No Violations Noted | Site inspected with OGI Bruce Jankura. Also spoke with Drilling and Completion Consultant, Kelly Spoonts on site. Conductor pipe and top hole had already been drilled, drilling of horizontal section was in progress. All disturbed areas have been seeded and mulched with about 45% vegetation already grown back in. Site has brush row reinforced with line of silt fence surrounding parameter. All E&S control BMPs have been installed properly and are working adequately. The pit is constructed and lined properly. Liner appears sound with no visible cuts or punctures. More than 2ft of freeboard is being maintained | |||
1824644 | 2009-08-27 | No Violations Noted | Site was inspected from perimeter of pad. In response to complaint #265864, Alex branch was field tested from just below McGregor Rd Crossing to headwaters. Stream begins approximately 700 Ft from edge of well pad. Meter readings indicated elevated TDS and Conductivity here. Pit appears sound. A properly installed sediment fence reinforced with haybales follows the edge of the pad. The are no signs of erosion or that any fluids have left the site on the surface. Inspection was conducted jointly with the following personel from the PA Fish and Boat Commission: Waterways Conservation Officer, Robert V. Dunbar, Fisheries Biologists, Steven Kepler and Heather Smiles. Officer Dunbar spoke with Matt Williams on-site. Mr. Williams mentioned that the well had low water returns. | |||
1829048 | 2009-09-04 | Violation(s) Noted | Miller - on-site meeting w/EOG & PaFBC reps, multiple investigations between 8/25/09 & 9/4/09 resulted in determination that activities at this well site released contaminants from Marcellus shale drilling to atmosphere, written response requested w/in 10 days. See 401CSL violation comment. NOV to MBC for input 9/21, insp not previously input. MBC 9/21/09 | 571760 | 401CSL - Discharge of pollultional material to waters of Commonwealth. | Integrity issues at pit on-site most likely cause of release to Alex Branch the headwaters w/in 700 ft of well pad, elevated barium, strontium and chloride levels detected. |
1829048 | 2009-09-04 | Violation(s) Noted | Miller - on-site meeting w/EOG & PaFBC reps, multiple investigations between 8/25/09 & 9/4/09 resulted in determination that activities at this well site released contaminants from Marcellus shale drilling to atmosphere, written response requested w/in 10 days. See 401CSL violation comment. NOV to MBC for input 9/21, insp not previously input. MBC 9/21/09 | 571760 | 401CSL - Discharge of pollultional material to waters of Commonwealth. | Integrity issues at pit on-site most likely cause of release to Alex Branch the headwaters w/in 700 ft of well pad, elevated barium, strontium and chloride levels detected. |
1829540 | 2009-09-10 | No Violations Noted | Site was inspected with Nathan Wells, Tom McNerney and Caleb Woolever. Pit had been excavated and all recovered materials placed in 9 containers that have been covered and stored on-site until approval has been aquired to haul them to landfill. A water truck comes every other day to pull any water produced from contents. Pit has been backfilled with cleanfill. Field testing shows TDS, conductivity and pH levels in stream originating about 700' from pad have improved significantly. Casing being run on day of inspection, no E&S problems at this time | |||
1833329 | 2009-09-30 | No Violations Noted | -No activity on site at this time. Fraccing tanks were being staged further up the access road (on remaing pad of #3H)
-containers that were used for holding the excavated pit contents remain on site. Most of the contents have been removed. -E&S controls |
|||
1834892 | 2009-09-30 | No Violations Noted | The following items were noted during the inspection:
-All pits and contents removed / disposed and rough graded. -Well drilled and cased, waiting on frac job. -Water in cellar around wellhead - no bubbles seen. -No activity at report time. -Site sign and E & S plan were on site. -E&S BMPs were in place and working adequately. |
|||
1836100 | 2009-10-14 | Violation(s) Noted | Spill response: Monday, October 12, 2009 Joe Wilson, independent consultant, noticed spring behind 8H was cloudy and sudsy. EOG was notified and found that a gasket on one of the holding tanks had gone bad. approx. 190 bbls of fluids were unaccounted for. There was no indication of a spill on-site. Fluid containing about 98% fresh water, 1.06% well wash and .25% ultra vis, soaked into the pad and made its way to the nearby stream. The stream had booms placed in it and the water was being pumped out to be contained on site. Suds were seen as far down as Camp Read. EOG also flushed the area a couple of times with fresh water. They will continue to monitor the stream quality and flush if necessary. Greg Shaffer, of EOG along with Joe wilson were on site during the inspection. Representatives of the Fish and Boat Commission were also present | 573592 | 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt | |
1836100 | 2009-10-14 | Violation(s) Noted | Spill response: Monday, October 12, 2009 Joe Wilson, independent consultant, noticed spring behind 8H was cloudy and sudsy. EOG was notified and found that a gasket on one of the holding tanks had gone bad. approx. 190 bbls of fluids were unaccounted for. There was no indication of a spill on-site. Fluid containing about 98% fresh water, 1.06% well wash and .25% ultra vis, soaked into the pad and made its way to the nearby stream. The stream had booms placed in it and the water was being pumped out to be contained on site. Suds were seen as far down as Camp Read. EOG also flushed the area a couple of times with fresh water. They will continue to monitor the stream quality and flush if necessary. Greg Shaffer, of EOG along with Joe wilson were on site during the inspection. Representatives of the Fish and Boat Commission were also present | 573592 | 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt | |
1836100 | 2009-10-14 | Violation(s) Noted | Spill response: Monday, October 12, 2009 Joe Wilson, independent consultant, noticed spring behind 8H was cloudy and sudsy. EOG was notified and found that a gasket on one of the holding tanks had gone bad. approx. 190 bbls of fluids were unaccounted for. There was no indication of a spill on-site. Fluid containing about 98% fresh water, 1.06% well wash and .25% ultra vis, soaked into the pad and made its way to the nearby stream. The stream had booms placed in it and the water was being pumped out to be contained on site. Suds were seen as far down as Camp Read. EOG also flushed the area a couple of times with fresh water. They will continue to monitor the stream quality and flush if necessary. Greg Shaffer, of EOG along with Joe wilson were on site during the inspection. Representatives of the Fish and Boat Commission were also present | 573593 | 401CSL - Discharge of pollultional material to waters of Commonwealth. | |
1836100 | 2009-10-14 | Violation(s) Noted | Spill response: Monday, October 12, 2009 Joe Wilson, independent consultant, noticed spring behind 8H was cloudy and sudsy. EOG was notified and found that a gasket on one of the holding tanks had gone bad. approx. 190 bbls of fluids were unaccounted for. There was no indication of a spill on-site. Fluid containing about 98% fresh water, 1.06% well wash and .25% ultra vis, soaked into the pad and made its way to the nearby stream. The stream had booms placed in it and the water was being pumped out to be contained on site. Suds were seen as far down as Camp Read. EOG also flushed the area a couple of times with fresh water. They will continue to monitor the stream quality and flush if necessary. Greg Shaffer, of EOG along with Joe wilson were on site during the inspection. Representatives of the Fish and Boat Commission were also present | 573593 | 401CSL - Discharge of pollultional material to waters of Commonwealth. | |
1836167 | 2009-10-19 | Outstanding Violations - No Viols Req'd | -Site inspected with WQS Supervisor John Ryder and Geologic Trainee Caleb Woolever. Joe Wilson was conducting routine sampling at the Spring affected by the recent spill.
-Tanks are still staged on-site, there is no activity at this time -Mr. Wilson indi |
|||
1851110 | 2009-12-15 | No Violations Noted | #NAME? | |||
1852738 | 2009-12-29 | No Violations Noted | Conducted Inspection with WQS Jessica Miller and WQS Heather Agosta.
Drilling is completed and a digital meter is connected to well. Production equipment is on location but not connected to well. Frac Tanks are on location. One tank is leaking from valve and is freezing. |
|||
1853885 | 2009-12-29 | No Violations Noted | -Inspection Conducted with OGI Travis and WQS from Altoona, Heather Agosta.
-no heavy activity has occurred since the last inspection. Production tanks have been dropped off on location -It appears that freezing on frac tank H1245 has caused some water e |
|||
1884384 | 2010-05-12 | De minimus Violations Noted | Production well in line with digital meter. Well tag did not have permit number, I informed the well tender, and he will replace. | |||
1907334 | 2010-08-16 | No Violations Noted | ||||
1919583 | 2010-09-27 | No Violations Noted | ||||
1954461 | 2011-03-02 | No Violations Noted |