X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-131-20187

Well Details

Well ID: 37-131-20187
Loading map...
County: Wyoming
Municipality: Washington Township
Operator Name: CARRIZO (MARCELLUS) LLC
Well Pad ID: 145314
Farm/Lease Name: MAZZARA 5H
First Permit Date: 2011-07-12
Last Permit Date: 2011-07-12
Spud Date: 2011-08-17
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 41.621427
Longitude: -75.99468

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 160409.0 27.0 0.0 0.0 0.0 0.0
2013-2 610289.0 134.0 0.0 0.0 0.0 0.0
2014-1 1154151.0 181.0 0.0 0.0 0.0 0.0
2014-2 1176011.0 182.0 0.0 0.0 0.0 0.0
2015-02 159890.75 28.0 0.0 0.0 0.0 0.0
2015-01 165305.64 31.0 0.0 0.0 0.0 0.0
2015-03 148625.45 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-1 DRILL CUTTINGS 1.0 Tons LANDFILL THR029 TUNNELL HILL RECLAMATION LANDFILL NEWLEXINGTON OH
2012-2 DRILL CUTTINGS 1.0 Tons LANDFILL 301626 WHITE PINES LANDFILL MILLVILLE PA
2013-1 PRODUCED FLUID 7.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2013-2 PRODUCED FLUID 308.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003 SHASKAS SOUTH PAD MONTROSE PA
2014-2 PRODUCED FLUID 14.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119 EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT WILLIAMSPORT PA
2014-2 PRODUCED FLUID 2.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010 HYDRO RECOVERY LP ANTRIM FACILITY WELLSBORO PA
2014-2 PRODUCED FLUID 3.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR0123 HYDRO RECOVERY LP BLOSSBURG FACILITY BLOSSBURG PA
2014-2 PRODUCED FLUID 54.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
15FEBU PRODUCED FLUID 185.56 Bbl STORAGE PENDING DISPOSAL OR REUSE TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE PA
15-Jan PRODUCED FLUID 42.77 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010 HYDRO RECOVERY LP ANTRIM FACILITY WELLSBORO PA
15-Jan PRODUCED FLUID 45.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR0123 HYDRO RECOVERY LP BLOSSBURG FACILITY BLOSSBURG PA
15FEBU PRODUCED FLUID 185.56 Bbl STORAGE PENDING DISPOSAL OR REUSE TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1990315 2011-07-26 No Violations Noted
2038879 2012-02-01 No Violations Noted
2090795 2012-08-07 No Violations Noted Nabors M 61, Conp. Man - Skip McClelland, @ 7354'

1132' Hole wet 5694' Tully 5800' Hamilton Only drilled 120' since started, having problems with curve. Discussed need to build berms.

2117809 2012-11-26 No Violations Noted
2125665 2012-12-13 Pending Checking well for gas, due to nearby water complaint. Carrizo reps on site - Gary Byron, Jesse Bonnice, & Tom Weller. Have a water truck on site to flood cellars.

20 x 13 3/8" annulus - cement return line - no bubbles. 13 3/8 x 9 5/8" annulus - open holes in landing collar - no bubbles. 9 5/8 x 5 1/2" annulus vent(cement return line) - > 10% methane and > 100% LEL combust. Eric Rooney took isotopic sample.

2137279 2013-01-24 No Violations Noted Stone rig, Comp Man - Larry Giraud not on site at present, talked to Stone tool pusher

Rig is on site cleaning out hole and perfing in prep for frac, which should start in the beginning of Feb. Rig has 2 more wells to go, should finish next week. Containment is good, frac tanks, etc not on site yet.

2176414 2013-06-19 No Violations Noted

For data sources see[3]

References