X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-23962

Well Details

Well ID: 37-125-23962
Loading map...
County: Washington
Municipality: Deemston Borough
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 147367
Farm/Lease Name: YANOSKY 5H
First Permit Date: 2009-12-18
Last Permit Date: 2010-04-28
Spud Date: 2010-03-25
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 40.010322
Longitude: -80.018461

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-3 0.0 0.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 368543.0 136.0 0.0 0.0 0.0 0.0
2010-2 368543.0 136.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 701808.0 181.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 408052.0 184.0 0.0 0.0 0.0 0.0
2012-1 318622.0 182.0 0.0 0.0 0.0 0.0
2012-2 286216.0 184.0 0.0 0.0 0.0 0.0
2013-1 245968.0 181.0 0.0 0.0 0.0 0.0
2013-2 218607.0 184.0 0.0 0.0 0.0 0.0
2014-1 191345.0 181.0 0.0 0.0 0.0 0.0
2014-2 189277.0 153.0 0.0 0.0 0.0 0.0
2015-02 25544.0 28.0 0.0 0.0 0.0 0.0
2015-01 29518.0 31.0 0.0 0.0 0.0 0.0
2015-03 28419.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-2 DRILLING FLUID WASTE 480.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2010-2 DRILLING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-2 FRACING FLUID WASTE 4.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2010-2 FRACING FLUID WASTE 500.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2010-2 FRACING FLUID WASTE 610.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2010-2 FRACING FLUID WASTE 3.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2010-2 FRACING FLUID WASTE 9.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2010-2 FRACING FLUID WASTE 945.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-2 PRODUCED FLUID 306.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2010-2 PRODUCED FLUID 153.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2010-2 PRODUCED FLUID 788.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2010-2 PRODUCED FLUID 116.0 Bbl IDENTIFY METHOD IN COMMENTS 34-167-29359 WEST VIRGINIA OIL GATHERING
2011-1 FRACING FLUID WASTE 240.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-1 PRODUCED FLUID 70.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2011-1 PRODUCED FLUID 600.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE HUNTER DISPOSAL DEXTER CITY OH
2011-1 PRODUCED FLUID 356.0 Bbl IDENTIFY METHOD IN COMMENTS 34-167-29359 WEST VIRGINIA OIL GATHERING
2011-2 PRODUCED FLUID 881.0 Bbl INJECTION DISPOSAL WELL 34-121-2-3995 HUNTERS SWIW #5 RENO OH
2011-2 PRODUCED FLUID 80.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 PRODUCED FLUID 863.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 PRODUCED FLUID 260.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL DEXTER CITY OH
2012-2 PRODUCED FLUID 633.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 PRODUCED FLUID 21.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-2 PRODUCED FLUID 946.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-2 PRODUCED FLUID 60.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2014-1 PRODUCED FLUID 993.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 45.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2014-2 PRODUCED FLUID 374.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 68.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1881076 2010-04-14 No Violations Noted Phillips 1 - Waiting on cement set time, plug down 8:05am, site and location good.
1881077 2010-04-20 No Violations Noted Phillips 1 - Vertical completed , rigged down
1886188 2010-05-15 No Violations Noted Union 45 - Set plugs to 6454 for kick off , site and location good

For data sources see[3]

References