X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24155

Well Details

Well ID: 37-051-24155
Loading map...
County: Fayette
Municipality: Jefferson Township
Operator Name: ATLAS RESOURCES LLC
Well Pad ID: 146292
Farm/Lease Name: HOSLER 7
First Permit Date: 2009-02-11
Last Permit Date: 2009-02-11
Spud Date: 2009-02-20
Unconventional: Yes
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.042713
Longitude: -79.812238

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-3 81512.0 365.0 0.0 0.0 0.0 0.0
2009-0 55843.0 201.0 0.0 0.0 0.0 0.0
2010-2 18408.0 184.0 0.0 0.0 0.0 0.0
2010-2 18408.0 184.0 0.0 0.0 0.0 0.0
2011-1 14713.0 181.0 0.0 0.0 0.0 0.0
2011-2 13827.0 184.0 0.0 0.0 0.0 0.0
2012-1 12072.0 182.0 0.0 0.0 0.0 0.0
2012-2 12299.0 184.0 0.0 0.0 0.0 0.0
2013-1 10956.0 181.0 0.0 0.0 0.0 0.0
2013-2 8312.0 184.0 0.0 0.0 0.0 0.0
2014-1 8602.0 181.0 0.0 0.0 0.0 0.0
2014-2 9183.0 184.0 0.0 0.0 0.0 0.0
2015-02 1162.0 28.0 0.0 0.0 0.0 0.0
2015-01 1239.0 31.0 0.0 0.0 0.0 0.0
2015-03 1369.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-3 FRACING FLUID WASTE 185.0 Bbl IDENTIFY METHOD IN COMMENTS NOT LISTED (PROVIDE NAME & ADDRESS IN COMMENTS) PA
2010-3 PRODUCED FLUID 2.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2010-3 PRODUCED FLUID 100.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2010-3 PRODUCED FLUID 8.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2009-0 BRINE 4.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT
2009-0 BRINE 100.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0101508 PA BRINE PA
2009-0 BRINE 705.0 Bbl OTHER
2009-0 BRINE 8.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2009-0 DRILLING 130.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT
2009-0 FRACKING FLUID 8.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT
2009-0 FRACKING FLUID 3.0 Bbl REUSE OTHER THAN ROAD SPREADING
2009-0 FRACKING FLUID 690.0 Bbl REUSE OTHER THAN ROAD SPREADING
2009-0 FRACKING FLUID 200.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2009-0 FRACKING FLUID 85.0 Bbl REUSE OTHER THAN ROAD SPREADING
2009-0 FRACKING FLUID 575.0 Bbl OTHER
2009-0 FRACKING FLUID 640.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-2 PRODUCED FLUID 290.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2010-2 PRODUCED FLUID 2.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2010-2 PRODUCED FLUID 84.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-1 FRACING FLUID WASTE 608.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-1 PRODUCED FLUID 304.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2011-1 PRODUCED FLUID 197.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2011-1 PRODUCED FLUID 209.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2011-1 PRODUCED FLUID 875.0 Bbl INJECTION DISPOSAL WELL 34-121-2-3995 HUNTERS SWIW #5 RENO OH
2011-2 FRACING FLUID WASTE 92.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-2 PRODUCED FLUID 2.0 Bbl INJECTION DISPOSAL WELL 34-121-2-3995 HUNTERS SWIW #5 RENO OH
2011-2 PRODUCED FLUID 110.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-1 FRACING FLUID WASTE 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 PRODUCED FLUID 584.0 Bbl INJECTION DISPOSAL WELL 34-121-2-3995 HUNTERS SWIW #5 RENO OH
2012-1 PRODUCED FLUID 618.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 PRODUCED FLUID 430.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 PRODUCED FLUID 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-2 PRODUCED FLUID 71.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 PRODUCED FLUID 160.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL DEXTER CITY OH
2013-1 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 PRODUCED FLUID 300.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) DEXTER CITY OH
2013-2 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 640.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) DEXTER CITY OH
2014-2 PRODUCED FLUID 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 140.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) DEXTER CITY OH

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1773959 2009-03-04 No Violations Noted Drill rig was located onsite, however it appeared that drilling had been completed and that the rig in the process of moving off-site. The below-grade pit located onsite had more than the two-feet of lined freeboard. Noted no accelerated erosion & sedimentation on the access road or well-site. Noted that the sediment trap installed at the toe of the fill slope appeared to be functioning properly. The operator should continue to monitor the site and access road for accelerated erosion & sedimentation until final restoration activities are completed.
1778501 2009-03-03 No Violations Noted Marcellus well, pit e/s ok
1778521 2009-02-25 No Violations Noted Marcellus Well, beginning 11 3/4" hole, site ok
1785877 2009-04-07 No Violations Noted Marcellus Well, top hole complete
1798290 2009-04-22 No Violations Noted Marcellus Well, site pit , e/s ok
2092034 2012-08-15 No Violations Noted Tag, 2 tanks, e&s ok.

For data sources see[3]

References