If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28809 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.508336,"lon":-79.558675,"icon":""}]} |
County: Westmoreland | |
Municipality: Washington Township | |
Operator Name: CNX GAS CO LLC | |
Well Pad ID: 148391 | |
Farm/Lease Name: GAUT 4E | |
First Permit Date: 2012-09-06 | |
Last Permit Date: 2014-05-20 | |
Spud Date: 2012-09-27 | |
Unconventional: Yes | |
Horizontal: Yes | |
Well Status: ACTIVE | |
Violations: 0 | |
Latitude: 40.508336 | |
Longitude: -79.558675 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-1 | 223429.54 | 20.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-2 | 1160557.01 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-02 | 112735.53 | 28.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-01 | 136497.85 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-03 | 124995.02 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | DRILL CUTTINGS | 698.07 | Tons | LANDFILL | 100434 | EVERGREEN LANDFILL | BLAIRSVILLE | PA |
2012-2 | DRILLING FLUID WASTE | 1.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-2 | FRACING FLUID WASTE | 10.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2014-1 | DRILL CUTTINGS | 580.08 | Tons | LANDFILL | 301071 | MAX ENV TECH INC YUKON FACILITY LANDFILL | YUKON | PA |
2014-1 | DRILLING FLUID WASTE | 727.04 | Bbl | LANDFILL | 301071 | MAX ENV TECH INC YUKON FACILITY LANDFILL | YUKON | PA |
2014-1 | FRACING FLUID WASTE | 8.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-2 | PRODUCED FLUID | 105.09 | Bbl | INJECTION DISPOSAL WELL | 34-013-20609 | BUCKEYE UIC BARNESVILLE #1 (SWIW#2) | BARNESVILLE | OH |
2014-2 | PRODUCED FLUID | 11.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
2104443 | 2012-10-01 | No Violations Noted | Inspection the result of a spud notice received by the Department on 09/26/2012. At the time of inspection the Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. | |||
2108687 | 2012-10-17 | No Violations Noted | At the time of inspection the drill rig was onsite and on containment. During the inspection the Operator indicated that the 4G was the well actively being drilled, at this time the 4E well has not been drilled. During the inspection the Department walked the perimeter and inspected the associated spring and seeps down gradient from the well pad area, no observation of contaminate at the time of inspection. The Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. | |||
2110404 | 2012-10-16 | No Violations Noted | Waiting on rig to commence tophole drilling. Pits lined and freeboards maintained. | |||
2115663 | 2012-11-14 | No Violations Noted | no violations noted | |||
2116160 | 2012-11-13 | No Violations Noted | Falcon rig#28 tripping in hole (2180ï¾’ - depth of hole) after completing 9 5/8ï¾” casing shoe test (650 psi). Pits lined and freeboards maintained. | |||
2127529 | 2013-01-04 | No Violations Noted | At the time of inspection the well appears to be drilled but not equipped for production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained | |||
2232490 | 2013-12-30 | No Violations Noted | At the time of inspection the Operator indicated that the well was drilled to KOP and was preparing to drill to TD. The Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. | |||
2237999 | 2014-01-15 | No Violations Noted | Waiting on rig to commence lateral drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI D. Catalano. | |||
2241927 | 2014-01-30 | No Violations Noted | Waiting on rig to commence lateral drilling. | |||
2244029 | 2014-02-10 | No Violations Noted | At the time of inspection the Operator indicated that the well was drilled to KOP and the Operator was preparing to drill the well to TD. The Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. | |||
2246098 | 2014-02-14 | No Violations Noted | Nabors rig#M62 building curve at 7352ï¾’ at time of inspection. Closed loop system being utilized. Pit lined and freeboard maintained. Inspection conducted w/OGI J. Branan. | |||
2250060 | 2014-02-25 | No Violations Noted | Waiting on frac. Nabors rig#M62 rigging down at time of inspection. Pit lined and freeboard maintained. | |||
2363146 | 2015-04-21 | No Violations Noted | At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. | |||
2368823 | 2015-05-11 | No Violations Noted | Well operating and properly identified. Well equipped with production unit (separation |
For data sources see[3]