X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-063-36389

Well Details

Well ID: 37-063-36389
Loading map...
County: Indiana
Municipality: Burrell Township
Operator Name: XTO ENERGY INC
Well Pad ID:
Farm/Lease Name: R C L SHUMAKER 4
First Permit Date: 2009-01-13
Last Permit Date: 2009-01-13
Spud Date: 2009-07-07
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 2
Latitude: 40.463407
Longitude: -79.275269

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2009-0 8247.0 106.0 0.0 0.0 0.0 0.0
2010-0 35599.0 362.0 0.0 0.0 0.0 0.0
2011-0 27510.0 352.0 0.0 0.0 0.0 0.0
2012-0 12097.0 366.0 0.0 0.0 0.0 0.0
2013-0 16710.0 365.0 0.0 0.0 0.0 0.0
2014-0 22339.0 365.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2013-0 PRODUCED FLUID 16.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1823408 2009-08-19 No Violations Noted Currently, well permit issued on 12/06/08 for well to be completed to 5,000 ft. in depth. Well pad completed with filter fencing and one pit. Well was completed and appeared to be hydro frac. Well head contained 8﾿ pipe reduced to 4﾿ with 3 shut off valves. Production equipment connected consisted of 100 bbl brine tank, heater and separator. The well was non active during the site inspection. No freeboard issues and drilling pit aligned with 20 mil plastic. Water in the pit was in the process of transportation for disposal to Tunnel town ﾿ Water treatment plant in Saltsburg. Well sign and E&S plan located at the entrance way. At the time of inspection, no E&S and IW issues at the site
1884091 2010-05-10 Violation(s) Noted At the time of inspection, the well was properly tagged and in production. Drilling was completed July 13, 2009. Sign and E&S plan onsite. It is recommended the plan be replaced, as it had been damaged by rain, until final restoration activities have been completed. Access road was stable. Brine tank appeared in sound condition. Several violations were observed, first a failure to properly restore site within 9 months after completion (07.13.09) and upon dept. receiving restoration report. It also appeared no efforts were taken to regrade or mulch and seed the area to permanently stabilize the site. Also observed a failure to implement bmp﾿s to reduce sedimentation & erosion issues, I noted significant ponding of water in various locations on and surrounding site. 586928 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging
1884091 2010-05-10 Violation(s) Noted At the time of inspection, the well was properly tagged and in production. Drilling was completed July 13, 2009. Sign and E&S plan onsite. It is recommended the plan be replaced, as it had been damaged by rain, until final restoration activities have been completed. Access road was stable. Brine tank appeared in sound condition. Several violations were observed, first a failure to properly restore site within 9 months after completion (07.13.09) and upon dept. receiving restoration report. It also appeared no efforts were taken to regrade or mulch and seed the area to permanently stabilize the site. Also observed a failure to implement bmp﾿s to reduce sedimentation & erosion issues, I noted significant ponding of water in various locations on and surrounding site. 586928 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging
1884091 2010-05-10 Violation(s) Noted At the time of inspection, the well was properly tagged and in production. Drilling was completed July 13, 2009. Sign and E&S plan onsite. It is recommended the plan be replaced, as it had been damaged by rain, until final restoration activities have been completed. Access road was stable. Brine tank appeared in sound condition. Several violations were observed, first a failure to properly restore site within 9 months after completion (07.13.09) and upon dept. receiving restoration report. It also appeared no efforts were taken to regrade or mulch and seed the area to permanently stabilize the site. Also observed a failure to implement bmp﾿s to reduce sedimentation & erosion issues, I noted significant ponding of water in various locations on and surrounding site. 586929 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
1884091 2010-05-10 Violation(s) Noted At the time of inspection, the well was properly tagged and in production. Drilling was completed July 13, 2009. Sign and E&S plan onsite. It is recommended the plan be replaced, as it had been damaged by rain, until final restoration activities have been completed. Access road was stable. Brine tank appeared in sound condition. Several violations were observed, first a failure to properly restore site within 9 months after completion (07.13.09) and upon dept. receiving restoration report. It also appeared no efforts were taken to regrade or mulch and seed the area to permanently stabilize the site. Also observed a failure to implement bmp﾿s to reduce sedimentation & erosion issues, I noted significant ponding of water in various locations on and surrounding site. 586929 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
2341976 2015-02-05 No Violations Noted At the time of inspection
2354569 2015-03-24 No Violations Noted At time of inspection

For data sources see[3]

References