37-063-37291

Well Details

Well ID: 37-063-37291
Loading map...
County: Indiana
Municipality: West Wheatfield Township
Operator Name: PENN VIEW EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: ST CLAIR 2
First Permit Date: 2011-12-28
Last Permit Date: 2011-12-28
Spud Date: 2012-02-09
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.435055
Longitude: -79.127544

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 0.0 0.0 0.0 0.0 0.0 0.0
2012-0 4567.0 184.0 0.0 0.0 0.0 0.0
2013-0 6095.0 365.0 0.0 0.0 0.0 0.0
2014-0 4709.0 365.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 295.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2013-0 PRODUCED FLUID 456.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2014-0 PRODUCED FLUID 91.0 Bbl ROAD SPREADING CAMBRIA COUNTY ROADSPREADING - JACKSON TOWNSHIP
2014-0 PRODUCED FLUID 250.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2041291 2012-02-08 No Violations Noted Site visit was due to spud notification.

Site E&S plan was at start of access road, howeve no site ID sign was installed. Site was constructed. Long access road was constructed and rocked. Snow and freezing temperatures kept E&S issues at a minimum. Site was constructed. Silt fence was installed. Pit was drilled but not yet lined. No violations noted at this time.

2042702 2012-02-14 No Violations Noted First Class Energy was contracted by Penn View (Wayne Brannon ﾿ tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Water was recorded at 200 feet. Water Protection pipe (9 5/8﾿) was set at 421﾿. Pipe was cemented with 150 sacks of Class A with 15 bbls of return. Plug was down at 9:10 am on 2/10/12. Surface pipe (7﾿) was set at 1,117 feet with 185 sacks of Class A with 10 bbls return. Plug was down at 9:52 pm on 2/13/12. First Class Energy was currently drilling at 1, 300 feet. The anticipated total depth for the well was 4,745 feet.
2043974 2012-02-16 No Violations Noted First Class Energy was contracted by Penn View (Wayne Brannon ï¾– tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Well was completed to target depth. Production pipe was set and First Class was removed from site. Appalachian was in the process of cementing the production pipe.
2043985 2012-02-16 No Violations Noted First Class Energy was contracted by Penn View (Wayne Brannon ï¾– tool pusher). Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Well was completed to target depth. Production pipe was set and First Class was removed from site. Appalachian was in the process of cementing the production pipe.
2048847 2012-03-06 No Violations Noted Site visit was part of routine inspection.

Site E&S plan was at start of access road. Site ID sign was also installed. Well was drilled and was being placed into production. Long access road was still rocked and stable. Site was regraded and pit was removed. No violations noted at this time. PA DEP Water Quality Specialist April Weiland was present during inspection.

2151616 2013-03-20 No Violations Noted First Class Energy was contracted by Penn View . Well sign and E&S plan were located at the access road. No freeboard issues were present at the site. Conductor pipe (20 モ) was set at 35 feet and was sanded in. Water was recorded at 60 feet and 540 feet. Water Protection pipe (9 5/8ヤ) was set at 431メ. Pipe was cemented with 176 sacks of Class A with 12 bbl. of return. Plug was down at 9:01 am on 3/18/13. Surface pipe (7ヤ) was set at 1,179 feet with 200 sacks of Class A with 12 bbl. return. Plug was down at 8:52 pm on 3/19/13. The anticipated total depth for the well was 4,975 feet.

For data sources see[3]