If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28534 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.174502,"lon":-79.696422,"icon":""}]} |
County: Westmoreland | |
Municipality: South Huntingdon Township | |
Operator Name: BARON GROUP INC | |
Well Pad ID: | |
Farm/Lease Name: D EVANS 8 | |
First Permit Date: 2011-02-17 | |
Last Permit Date: 2011-02-17 | |
Spud Date: 2011-08-20 | |
Unconventional: No | |
Horizontal: No | |
Well Status: ACTIVE | |
Violations: 0 | |
Latitude: 40.174502 | |
Longitude: -79.696422 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2011-0 | 2385.9 | 91.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 5045.0 | 366.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-0 | 3918.89 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-0 | 4148.76 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2011-0 | DRILLING FLUID WASTE | 160.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | CREEKSIDE TREATMENT FACILITY | CREEKSIDE | PA |
2011-0 | DRILLING FLUID WASTE | 100.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
2011-0 | FRACING FLUID WASTE | 375.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | CREEKSIDE TREATMENT FACILITY | CREEKSIDE | PA |
2011-0 | FRACING FLUID WASTE | 870.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
2013-0 | PRODUCED FLUID | 30.0 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW003 | FLUID RECOVERY SERVICE ROUSEVILLE FACILITY | PA |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1984247 | 2011-06-19 | No Violations Noted | LOCATION BUILT, FENCE AROUND PIT, AND E&S CONTROLS. | |||
1997913 | 2011-08-22 | No Violations Noted | Drill rig located onsite and drilling was ongoing at the time of the inspection. Drill pit onsite and it had more than the required two feet of lined freeboard. Site required minimal erosion controls due to the location being in a field with dense vegetation. Operator should continue to monitor the site to insure compliance with all apllicable regulations until completion of well development activities. | |||
2002895 | 2011-08-24 | No Violations Noted | Whipstock Rig #20 drilling the D. Evans #8 well permit #129-28534 for the Baron Group. Depth of 2550' pit good, house keeping good and E&S controls in place. | |||
2003529 | 2011-08-23 | No Violations Noted | Whipstock 20 preparing to run 7 inch casing and cement. Site clean, E&S good, no problems at this time.
While on location I attempted to gather and/or confirm all available information to assemble a time line of well construction vs. water supply. See pages 2-4 for additional information on timeline investigation Whipstock 20 preparing to run 7 inch casing and cement. Site clean, E&S good, no problems at this time. While on location I attempted to gather and/or confirm all available information to assemble a time line of well construction vs. water supply. See pages 2-4 for additional information on timeline investigation |
For data sources see[3]