X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-063-36401

Well Details

Well ID: 37-063-36401
Loading map...
County: Indiana
Municipality: West Wheatfield Township
Operator Name: PENN VIEW EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: SANTORO 1
First Permit Date: 2009-01-14
Last Permit Date: 2009-01-14
Spud Date: 2009-02-23
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.446063
Longitude: -79.112936

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2008-0 0.0 0.0 0.0 0.0 0.0 0.0
2010-0 12727.0 365.0 0.0 0.0 0.0 0.0
2011-0 8169.65 365.0 0.0 0.0 0.0 0.0
2012-0 6887.0 365.0 0.0 0.0 0.0 0.0
2013-0 5921.0 365.0 0.0 0.0 0.0 0.0
2014-0 4667.0 365.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-0 PRODUCED FLUID 90.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2011-0 PRODUCED FLUID 50.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2012-0 PRODUCED FLUID 225.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2013-0 PRODUCED FLUID 200.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2014-0 PRODUCED FLUID 90.0 Bbl ROAD SPREADING CAMBRIA COUNTY ROADSPREADING - JACKSON TOWNSHIP
2014-0 PRODUCED FLUID 145.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1833977 2009-10-06 No Violations Noted Based on record, permit was approved on 1/14/09. Well installed on 3/3/09 to depth of 5180 ft. Report submitted and approved on 4/28/09. Well completed with 8﾿ pipe reduced to 4 ﾿pipe reduced to 2﾿ production pipe and 3 shut off valves. Production equipment consists of heater, separator (150 psi), 100 bbl brine tank (35 bbl of fluid) and dual phase data logger. At the time of inspection, no IW and E&S issues at the site. No signs of fluid or gas leakage around well head
1900079 2010-07-21 No Violations Noted At the time of inspection, well properly tagged, drilled, and in production. Site has been seeded and mulched and growth was observed, some areas <70%. It is recommended that the operator reseed and mulch `bare areas﾿ of the site to ensure adequate permanent restoration is achieved. Access road stable. No erosion or sedimentation issues were observed in relation to access road or well site. Again, it is recommended that operator continue to maintain shared access road between all wells to prevent the potential for erosion and sedimentation concerns. A future inspection will be conducted to evaluate restoration measures.
2041461 2012-02-07 No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was in production.


2355819 2015-03-23 No Violations Noted no issues. gas well was in production

For data sources see[3]

References