If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28275 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.166872,"lon":-79.603395,"icon":""}]} |
County: Westmoreland | |
Municipality: East Huntingdon Township | |
Operator Name: KRIEBEL MINERALS INC | |
Well Pad ID: | |
Farm/Lease Name: T FORSYTHE 001 | |
First Permit Date: 2010-02-25 | |
Last Permit Date: 2010-02-25 | |
Spud Date: 2010-03-03 | |
Unconventional: No | |
Horizontal: No | |
Well Status: ACTIVE | |
Violations: 0 | |
Latitude: 40.166872 | |
Longitude: -79.603395 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-0 | 8455.0 | 214.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 10277.0 | 334.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 8678.0 | 335.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-0 | 6187.0 | 334.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-0 | 5398.0 | 334.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2010-0 | DRILLING FLUID WASTE | 110.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | CREEKSIDE TREATMENT FACILITY | CREEKSIDE | PA |
2010-0 | DRILLING FLUID WASTE | 2.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS TREATMENT FACILITY | SALTSBURG | PA |
2010-0 | FRACING FLUID WASTE | 0.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | CREEKSIDE TREATMENT FACILITY | CREEKSIDE | PA |
2010-0 | FRACING FLUID WASTE | 880.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS TREATMENT FACILITY | SALTSBURG | PA |
2012-0 | PRODUCED FLUID | 20.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | CREEKSIDE TREATMENT FACILITY | CREEKSIDE | PA |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1861333 | 2010-01-15 | No Violations Noted | On January 15, 2010 I conducted an inspection for an OG 57 Request for waiver of distance requirement. Also on site was DEP WQS Nick Staffieri. The well site is proposed to be constructed within 100 ft. from an unnamed tributary to Buffalo Run. Well was site staked. Construction has not begun at site. Proposed E & S plan should protect stream from adverse impact during site/well development if properly implemented & maintained. Drill cuttings are to be land farmed on site. Operator must ensure that the surface of the land farm area is at least 20 inches above the seasonal high groundwater table. | |||
1868774 | 2010-03-08 | No Violations Noted | Well is being drilled currently.
The access road is in good condition ﾿ BMPs in place. E&S controls are installed and functioning properly. This site is in compliance. |
|||
1875903 | 2010-04-06 | No Violations Noted | drilling complete, not equipped for production, rough graded. | |||
1899779 | 2010-07-06 | No Violations Noted | Site inspection for GP056510810 and GP076510801 for a pipeling project. Met Mike Morgart on sit to look at any possible wetland impacts due to hydric soils being in the project area. The small drainage has been altered at some point and the land use is a mow field so other than a few riparian vegeation species there are no other wetland indicators that we observed that would be impacted by this project. | |||
2349164 | 2015-03-04 | No Violations Noted | Tag |
For data sources see[3]