X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28725

Well Details

Well ID: 37-129-28725
Loading map...
County: Westmoreland
Municipality: Salem Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148378
Farm/Lease Name: FRYE UNIT 13H
First Permit Date: 2012-01-11
Last Permit Date: 2012-01-11
Spud Date: 2012-01-19
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 2
Latitude: 40.365386
Longitude: -79.480575

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 263232.0 150.0 0.0 0.0 0.0 0.0
2013-2 339633.0 184.0 0.0 0.0 0.0 0.0
2014-1 308589.0 181.0 0.0 0.0 0.0 0.0
2014-2 269470.0 184.0 0.0 0.0 0.0 0.0
2015-02 41147.0 28.0 0.0 0.0 0.0 0.0
2015-01 40000.0 31.0 0.0 0.0 0.0 0.0
2015-03 40843.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-1 DRILLING FLUID WASTE 3.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 DRILL CUTTINGS 3.41 Tons LANDFILL 100434 EVERGREEN LANDFILL BLAIRSVILLE PA
2013-1 FRACING FLUID WASTE 25.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 PRODUCED FLUID 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 PRODUCED FLUID 170.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-2 FLOWBACK FRACTURING SAND 72.42 Tons LANDFILL 073 114 654 US ECOLOGY IDAHO, INC. GRAND VIEW ID
2013-2 FRACING FLUID WASTE 10.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-2 FRACING FLUID WASTE 7.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-2 PRODUCED FLUID 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-2 PRODUCED FLUID 556.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2014-1 FLOWBACK FRACTURING SAND 6.47 Tons STORAGE PENDING DISPOSAL OR REUSE MID074259565 US ECOLOGY DETROIT MI
2014-1 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 466.67 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2036198 2012-01-23 No Violations Noted Well had been spudded, drilling was not ongoing at the time of the inspection. Well pad construction ahd been completed, well stimulation impoundment construction was still underway. All access road and site erosion controls had been implemented as outlined in the ESCGP. There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site. The operator should monitor the site and access road eorsion controls and maintain them as neccesary.
2039240 2012-01-31 No Violations Noted Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI J. Branan.


2045690 2012-02-22 No Violations Noted Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained.
2048769 2012-03-06 No Violations Noted Highlands Rig#2 Speedstar cleaning hole (damp) at 1424' at time of inspection. Pit lined and freeboard maintained.
2056001 2012-03-30 No Violations Noted Well topholed and ready for Patterson rig; On pad with Fry 14h and 15H; Location good; E&S good
2066497 2012-05-10 No Violations Noted Patterson-UTI Rig#255 nippling up BOP at time of inspection. Closed loop system being utilized. Pit lined and freeboard maintained.
2069689 2012-05-21 No Violations Noted TD of hole: 11360; Ran 11320' 5 !/2"csg; Cement w/67bbls; 285 sks Varicem cement; 14.2ppg;Yield=1.32ft3/sk; 5.84 galsk; followed by Gasstop 208 bbls; 885sks; 14.2;1.32yield; 5.85ft3/sk; Tail in with Fraccem; 110bbls; 280 sks; 15.2ppg; 2.2Yield; 9.13ft3/sk;'; cement returns; Patterson rig 255 moving off location;
2116918 2012-11-20 No Violations Noted Site stable no violations
2118993 2012-11-28 Violation(s) Noted Violations noted 654625 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected.
2129637 2013-01-10 No Violations Noted Compliance inspection the result of violations written on 11/29/2012. At the time of inspection the soil and rock affected by the brine spill on 11/28 appears to have been removed. At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2180092 2013-07-02 No Violations Noted At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2195289 2013-08-14 Viol(s) Noted & Immediately Corrected Administrative review the result of a restoration extension request submitted to the Department on June 5 2013. During the restoration review process the Department notes that the Operator was approximately 4 months past the restoration date, when the restoration extension was filed with the Department. According to the well record submitted to the Department by the Operator the well was drilled to total depth on 5/18/2012 making the restoration date 2/18/2013, the subsequent violation is for the failure to restore the site within 9 months or file for a site restoration extension within the same time frame. 675160 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. 3216c
2251079 2014-03-06 No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes that the site has been regraded, and mulched, however no growth observed. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events.
2366785 2015-04-28 No Violations Noted Well operating and properly identified. Well equipped with production unit (separation
2367099 2015-05-05 No Violations Noted Site inspection in response to a Well Site Restoration Report filed with the Department on 11/26/2014. At the time of inspection the well was drilled and equipped for production. Well apparatus and brine tank appeared to be in sound condition. All earth disturbance activities associated with the site appear to be complete

For data sources see[3]

References