If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28725 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.365386,"lon":-79.480575,"icon":""}]} |
County: Westmoreland | |
Municipality: Salem Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 148378 | |
Farm/Lease Name: FRYE UNIT 13H | |
First Permit Date: 2012-01-11 | |
Last Permit Date: 2012-01-11 | |
Spud Date: 2012-01-19 | |
Unconventional: Yes | |
Horizontal: Yes | |
Well Status: ACTIVE | |
Violations: 2 | |
Latitude: 40.365386 | |
Longitude: -79.480575 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-1 | 263232.0 | 150.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-2 | 339633.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-1 | 308589.0 | 181.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-2 | 269470.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-02 | 41147.0 | 28.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-01 | 40000.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-03 | 40843.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-1 | DRILLING FLUID WASTE | 3.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2012-2 | DRILL CUTTINGS | 3.41 | Tons | LANDFILL | 100434 | EVERGREEN LANDFILL | BLAIRSVILLE | PA |
2013-1 | FRACING FLUID WASTE | 25.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
2013-1 | PRODUCED FLUID | 2.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
2013-1 | PRODUCED FLUID | 170.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2013-2 | FLOWBACK FRACTURING SAND | 72.42 | Tons | LANDFILL | 073 114 654 | US ECOLOGY IDAHO, INC. | GRAND VIEW | ID |
2013-2 | FRACING FLUID WASTE | 10.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2013-2 | FRACING FLUID WASTE | 7.0 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2013-2 | PRODUCED FLUID | 2.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2013-2 | PRODUCED FLUID | 556.0 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2014-1 | FLOWBACK FRACTURING SAND | 6.47 | Tons | STORAGE PENDING DISPOSAL OR REUSE | MID074259565 | US ECOLOGY | DETROIT | MI |
2014-1 | PRODUCED FLUID | 1.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-2 | PRODUCED FLUID | 466.67 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
2036198 | 2012-01-23 | No Violations Noted | Well had been spudded, drilling was not ongoing at the time of the inspection. Well pad construction ahd been completed, well stimulation impoundment construction was still underway. All access road and site erosion controls had been implemented as outlined in the ESCGP. There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site. The operator should monitor the site and access road eorsion controls and maintain them as neccesary. | |||
2039240 | 2012-01-31 | No Violations Noted | Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI J. Branan.
|
|||
2045690 | 2012-02-22 | No Violations Noted | Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained. | |||
2048769 | 2012-03-06 | No Violations Noted | Highlands Rig#2 Speedstar cleaning hole (damp) at 1424' at time of inspection. Pit lined and freeboard maintained. | |||
2056001 | 2012-03-30 | No Violations Noted | Well topholed and ready for Patterson rig; On pad with Fry 14h and 15H; Location good; E&S good | |||
2066497 | 2012-05-10 | No Violations Noted | Patterson-UTI Rig#255 nippling up BOP at time of inspection. Closed loop system being utilized. Pit lined and freeboard maintained. | |||
2069689 | 2012-05-21 | No Violations Noted | TD of hole: 11360; Ran 11320' 5 !/2"csg; Cement w/67bbls; 285 sks Varicem cement; 14.2ppg;Yield=1.32ft3/sk; 5.84 galsk; followed by Gasstop 208 bbls; 885sks; 14.2;1.32yield; 5.85ft3/sk; Tail in with Fraccem; 110bbls; 280 sks; 15.2ppg; 2.2Yield; 9.13ft3/sk;'; cement returns; Patterson rig 255 moving off location; | |||
2116918 | 2012-11-20 | No Violations Noted | Site stable no violations | |||
2118993 | 2012-11-28 | Violation(s) Noted | Violations noted | 654625 | 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected. | |
2129637 | 2013-01-10 | No Violations Noted | Compliance inspection the result of violations written on 11/29/2012. At the time of inspection the soil and rock affected by the brine spill on 11/28 appears to have been removed. At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. | |||
2180092 | 2013-07-02 | No Violations Noted | At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. | |||
2195289 | 2013-08-14 | Viol(s) Noted & Immediately Corrected | Administrative review the result of a restoration extension request submitted to the Department on June 5 2013. During the restoration review process the Department notes that the Operator was approximately 4 months past the restoration date, when the restoration extension was filed with the Department. According to the well record submitted to the Department by the Operator the well was drilled to total depth on 5/18/2012 making the restoration date 2/18/2013, the subsequent violation is for the failure to restore the site within 9 months or file for a site restoration extension within the same time frame. | 675160 | 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. | 3216c |
2251079 | 2014-03-06 | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes that the site has been regraded, and mulched, however no growth observed. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events. | |||
2366785 | 2015-04-28 | No Violations Noted | Well operating and properly identified. Well equipped with production unit (separation | |||
2367099 | 2015-05-05 | No Violations Noted | Site inspection in response to a Well Site Restoration Report filed with the Department on 11/26/2014. At the time of inspection the well was drilled and equipped for production. Well apparatus and brine tank appeared to be in sound condition. All earth disturbance activities associated with the site appear to be complete |
For data sources see[3]