If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-151-21920 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.71988166,"lon":-81.29215916,"icon":""}]} |
County: Stark | |
Municipality: | |
Operator Name: LONG DANNY L & SONS | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1968-09-14 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Active Injection | |
Violations: 0 | |
Latitude: 40.71988166 | |
Longitude: -81.29215916 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
1988-0 | 0.0 | 0.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | Compliance Notice | |||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
-1076408416 | 2006-05-23 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the concrete brine pits. The plastic lined workover pit dug in April is still open. I met with Dean Long and discussed closing the pit. He also needs to acidize the injection well. | ||||
1081525262 | 2004-04-08 | N.O.V. has been resolved. The system was not running on the day of the inspection. Injection pressure down to 700 psi. Annulus pressure at 700 psi. I will request Danny Long to do a 15 min. pressure test to verify the packer integrity.Call Danny Long at 330-866-3558. | ||||
1088266544 | 2004-06-25 | The system was not running at the time of the inspection. NO VIOLATIONS. | ||||
1131570620 | 2005-11-09 | The system was not running at the time of the inspection. | ||||
1144113017 | 2006-04-03 | Service rig (Ted Levengood) is pulling the packer and the tubing. | ||||
1144630135 | 2006-04-07 | Set packer. Bottom of packer is set at 4311.70'. Copy of tally will be sent to Columbus. Performed MIT on annulus and packer. Started at 1110 psi; held for 20 minutes; dropped to 1070 psi. MIT PASSED. Called Tom Tomastik with MIT results. | ||||
1159722804 | 2005-02-04 | The system was not running at the time of the inspection. NO VIOLATIONS. | ||||
1288i126 | 2001-10-29 | Injection : 1030 ; Annulus : 830 ; No violations at this time . | ||||
1288i219 | 2001-12-10 | Injection : 1030 ; Annulus : 840 ; Last inspection : 10 / 29 / 01 ; No violations at this time . | ||||
1288i264 | 2002-01-18 | Injection : 1010 ; Annulus : 830 ; Last inspection : 12 / 10 /01 . No violations at this time . | ||||
1288i287 | 2002-02-20 | Injection : 990 ; Annulus : 830 ; Last inspection : 01 / 18 / 02 . No violations at this time . | ||||
1288i376 | 2002-03-19 | Injection : 1050 ; Annulus : 1200 ; Last inspection on 02 / 20 / 02 . No violations at this time . | ||||
1288i516 | 2002-04-23 | Injection : 1040 ; Annulus : 1200 ; Last inspection on 03 / 19 / 02 . No violations at this time . | ||||
1288i551 | 2002-05-22 | Injection : 1020 ; annulus ; 1190 . No violations at this time . Last inspection on April 23rd , 2002 . | ||||
1288i81 | 2001-10-02 | Injection : 980 Annulus: 840 ; last inspection on 8/30/01 | ||||
1293055827 | 2010-12-22 | The injection system was not running at the time of the inspection. There were no violations at the wellhead or at the brine pits. I was unable to gauge the pressure on the annulus because of a bad needle valve. I told Danny Long to replace the needle valve. | ||||
-1346601021 | 2004-03-25 | The system was not running at the time of the inspection. The injection pressure exceeded the allowable pressure by 225 psi. Tom Tomastik was notified in Columbus. Stop injecting and lower the injection pressure. Blow down the annulus and check for pressure equalization. The packer may have failed. Place a new needle valve on the annulus. | ||||
-1501685912 | 2002-10-18 | Routine inspection revealed no violations at this time . | ||||
-1568519994 | 2014-06-24 | No violations were found at the time. | ||||
-1600187452 | 2009-05-28 | The injection system was not running at the time of the inspection. There were no violations at the wellhead or at the brine pits. | ||||
-1604060208 | 2006-08-30 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the tank battery. | ||||
1701971551 | 2011-05-20 | The injection system was not running at the time of the inspection. There were no violations at the wellhead or at the brine pits. A new needle valve and a new quick connect valve have been placed on the annulus. | ||||
-1747292629 | 2005-06-28 | NO VIOLATIONS. The disposal facility was not running at the time of the inspection. | ||||
-1781518559 | 2004-09-21 | NO VIOLATIONS. The system was not running at the time of the inspection. | ||||
-1800787761 | 2009-12-04 | The injection system was not running at the time of the inspection. There were no violations at the wellhead or at the brine pits. | ||||
1809516071 | 2002-10-18 | Routine inspection revealed no violations at this time . | ||||
1811410828 | 2010-03-30 | The injection system was not running at the time of the inspection. The injection line was over pressured by 115 psi. I met with Danny and Dean Long and informed them that the injection line was over pressured. Dean will lower the injection pressure today. There were no other violations at the wellhead or at the brine pits. | ||||
-1882422482 | 2008-09-25 | The injection system was not running at the time of the inspection. There were no violations at the wellhead or at the brine pits. | ||||
-1964473479 | 2009-09-04 | The injection system was not running at the time of the inspection. There were no violations at the wellhead or at the brine pits. | ||||
-2141055709 | 2015-03-31 | The injection well and surface facility were inspected. There were no violations found at the time. | ||||
298651778 | 2007-06-27 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the brine pit facility. | ||||
366234112 | 2008-06-12 | The injection system was not running at the time of the inspection. There were no violations at the wellhead or at the brine pits. | ||||
37753075 | 2013-09-30 | There were no violations at the time of my inspection. | ||||
439320489 | 2013-06-25 | My inspection of the well and surface facility found no violations. | ||||
-4413126 | 2006-04-04 | Witnessed the running in the hole of the Baker A-3 Lockset rebuilt packer on 2-3/8 tubing. | ||||
-443177849 | 2006-03-02 | The injection pump was not running at the time of the inspection. No Violations at WH or pits. Met with Danny Long. Danny said that he is not using the injection system. He is planning to pull the packer and work on the well when he can find a service rig available. | ||||
492372982 | 2014-09-26 | An inspection of the injection well found no violations. | ||||
-493919247 | 2007-12-18 | The injection pump was not running at the time of the inspection. There were no violations at the wellhead or at the brine pits. | ||||
-50538662 | 2007-03-13 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the brine pits. | ||||
-537635966 | 2014-12-29 | The injection well and surface facility were inspected. There were no violations found at the time. | ||||
548657971 | 2006-04-05 | Witnessed the installation of the annular inhibitor on the back side of the tubing. Omega mixed 5 gallons of annular inhibitor with fresh water and pumped it down the casing valve. Well pressured up to 400 psi. Did not set the packer. Left the location. | ||||
639120445 | 2008-12-18 | The injection system was not running at the time of the inspection. There were no violations at the wellhead or at the brine pits. The casing valve on the annulus was frozen and could not be opened to check pressure. | ||||
-667627455 | 2007-09-26 | The injection pump was not running at the time of the inspection. There were no violations at the wellhead or at the brine pits. | ||||
874957503 | 2008-03-21 | The injection pump was not running at the time of the inspection. There were no violations at the wellhead or at the brine pits. Dean Long informed me that the valve on the annulus is frozen. I got a 0 psi reading for the annulus pressure. | ||||
-898678521 | 2014-03-31 | The were no violations found at the time of inspection. | ||||
943651488 | 2009-04-01 | The injection system was not running at the time of the inspection. There were no violations at the wellhead or at the brine pits. | ||||
-95861593 | 2010-09-09 | The injection system was not running at the time of the inspection. There were no violations at the wellhead or at the brine pits. | ||||
981640001 | 2010-06-08 | The injection system was not running at the time of the inspection. There were no violations at the wellhead or at the brine pits. | ||||
UIC1066 | 1991-02-28 | 1501:9-3-06 (H) PERMIT | ||||
UIC1067 | 1991-02-28 | 1501:9-3-05 (A) (6) CONSTRUCTION | ||||
UIC1068 | 1991-02-28 | 1509.22 (A) (1) STOR. & DISPOSAL | ||||
UIC1069 | 1991-02-28 | 1501:9-3-04 POLLUTION | ||||
UIC1322 | 1992-09-15 | 1501: 9-3-07 OPERATION,MONITORING | ||||
UIC1323 | 1992-09-15 | 1509.03 RULES & REGULATIONS | ||||
UIC1324 | 1992-09-16 | 1509.03 RULES & REGULATIONS | ||||
UIC1325 | 1992-09-16 | 1501: 9-3-07 OPERATION,MONITORING | ||||
UIC1356 | 1992-09-21 | 1501: 9-3-07 OPERATION | ||||
UIC1357 | 1992-09-21 | 1509.03 RULES & REGULATIONS | ||||
UIC1378 | 1993-04-06 | 1509.03 RULES & REGULATIONS | ||||
UIC1379 | 1993-04-06 | 1509.22 (A) (2) STORAGE & DISPOSAL | ||||
UIC1380 | 1993-04-06 | 1501: 9-3-04 PREVT. CONTAMINATION | ||||
UIC1385 | 1993-03-04 | 1501: 9-3-06 (12) PERMIT | ||||
UIC1386 | 1993-03-04 | 1501: 9-3-07 (D) OPERATION & MONITOR | ||||
UIC1430 | 1993-08-05 | 1501: 9-3-07 (E) QUARTERLY REPORTS | ||||
UIC1444 | 1993-06-25 | 1501: 9-3-07 (D) EXCEED MAX. INJ. PSI | ||||
UIC1473 | 1994-04-07 | 1501: 9-3-07 (D) EXCEED MAX. INJ. PSI | ||||
UIC1474 | 1994-04-07 | 1509.03 RULES & REGULATIONS | ||||
UIC1479 | 1993-12-07 | 1501: 9-3-07 EXCEED MAX. INJ. PSI | ||||
UIC1609 | 1995-07-20 | 1501: 9-3-08 TEMPORARY STORAGE | ||||
UIC375 | 1987-09-09 | 1501:9-3-07 (D)(1) | ||||
UIC457 | 1987-03-27 | 1501:9-3-07 (D)(1)(2) | ||||
UIC500 | 1988-03-10 | 1509.03 | ||||
UIC538 | 1988-05-23 | 1509.22 (A)(1)(2) | ||||
UIC539 | 1988-05-23 | 1501:9-3-05 (A)(6) | ||||
UIC540 | 1988-05-23 | 1501:9-3-04 (A) | ||||
UIC541 | 1988-05-23 | 1501:9-3-07 (H) | ||||
UIC636 | 1989-03-27 | 1509.03 enforce. rules & reg | ||||
UIC856 | 1990-03-06 | 1509.22 (A)(1)(2) storage & disposal | ||||
UIC857 | 1990-03-06 | 1501:9-3-04 (A) Prevent contaminatio | ||||
UIC858 | 1990-03-06 | 1509.072 (A) Restoration | ||||
UIC955 | 1990-07-29 | 1509.03 RULES & REGULATION | ||||
UIC98 | 1987-03-03 | 1501:9-3-07(D)(1)(2) |
For data sources see[2]