X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-23066

Well Details

Well ID: 34-153-23066
Loading map...
County: Summit
Municipality:
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2008-11-10
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 41.00880676
Longitude: -81.52410548

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2008-0 0.0 0.0
2009-0 10482.0 1246.0
2010-0 15110.0 1647.0
2011-0 10589.0 1305.0
2012-0 7408.0 963.0
2013-0 5600.0 986.0
2014-0 5562.0 365.0 802.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1002054984 2008-11-10 Wildcat is on location and spudded the well today. The drilling pits are fenced and lined as required. No violations at this time.
1227212608 2008-11-18 Wildcat moved off on 11/17. The location is fenced and the pits are lined and in good condition. Everflow plans to solidify the pits on Saturday 11/22.
1245956983 2009-06-17 Left a voice mail on the home phone of the complaintant and asked that she call me with questions. Everflow has contacted North Coast Labs to collect a new water sample to compare with the pre-drilling results. I am waiting for these results.
1266956546 2010-02-18 Preliminary restoration is approved.
-1711599157 2008-11-14 Wildcat is drilling ahead and should TD the well tomorrow. The pits are in good condition and the location is fenced. No violations at this time.
-440449040 2009-01-23 The well is now in production and the required fencing and identification are in place. Preliminary restoration will be evaluated as soon as weather permits but is not required until this summer.
-554554973 2008-12-10 The site has been graded, the wellhead fenced and the flowline installed.
594391346 2008-11-12 Wildcat switched over to fluid this afternoon after reaching the top of the Big Lime, as required by permit. The location is fenced and the pits are lined and in good condition. No violations at this time.
707636156 2008-11-24 The pits were solidified with 65 tons of cement dust on 11/22. The pits will be covered today with the frac scheduled for Monday 12/1. No violations at this time.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.