If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23066 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.00880676,"lon":-81.52410548,"icon":""}]} |
County: Summit | |
Municipality: | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2008-11-10 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.00880676 | |
Longitude: -81.52410548 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2008-0 | 0.0 | 0.0 | ||||
2009-0 | 10482.0 | 1246.0 | ||||
2010-0 | 15110.0 | 1647.0 | ||||
2011-0 | 10589.0 | 1305.0 | ||||
2012-0 | 7408.0 | 963.0 | ||||
2013-0 | 5600.0 | 986.0 | ||||
2014-0 | 5562.0 | 365.0 | 802.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1002054984 | 2008-11-10 | Wildcat is on location and spudded the well today. The drilling pits are fenced and lined as required. No violations at this time. | ||||
1227212608 | 2008-11-18 | Wildcat moved off on 11/17. The location is fenced and the pits are lined and in good condition. Everflow plans to solidify the pits on Saturday 11/22. | ||||
1245956983 | 2009-06-17 | Left a voice mail on the home phone of the complaintant and asked that she call me with questions. Everflow has contacted North Coast Labs to collect a new water sample to compare with the pre-drilling results. I am waiting for these results. | ||||
1266956546 | 2010-02-18 | Preliminary restoration is approved. | ||||
-1711599157 | 2008-11-14 | Wildcat is drilling ahead and should TD the well tomorrow. The pits are in good condition and the location is fenced. No violations at this time. | ||||
-440449040 | 2009-01-23 | The well is now in production and the required fencing and identification are in place. Preliminary restoration will be evaluated as soon as weather permits but is not required until this summer. | ||||
-554554973 | 2008-12-10 | The site has been graded, the wellhead fenced and the flowline installed. | ||||
594391346 | 2008-11-12 | Wildcat switched over to fluid this afternoon after reaching the top of the Big Lime, as required by permit. The location is fenced and the pits are lined and in good condition. No violations at this time. | ||||
707636156 | 2008-11-24 | The pits were solidified with 65 tons of cement dust on 11/22. The pits will be covered today with the frac scheduled for Monday 12/1. No violations at this time. |
For data sources see[2]