If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24477 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.81835005,"lon":-81.3292138,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-03-28 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Well Drilled | |
Violations: 0 | |
Latitude: 39.81835005 | |
Longitude: -81.3292138 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-2043102973 | 2014-05-29 | My inspection finds the drilling rig is at a current depth of 2086'. They anticipate a total depth of 2200'. The rig will then run 13.625 casing. A test of water in the northeast sump did not indicate any elevated chlorides. | ||||
208110816 | 2014-03-29 | My inspection today finds Express Energy drilled 100' of 32 hole. Express ran 100' of 26 casing and cemented it in place with 330 sks of class A cement. I verified the cement weight at 15.6 pounds per gallon. The cement stayed at surface and circulation was maintained through out the job. | ||||
-280300823 | 2014-05-30 | My inspection today finds the drilling rig crew ran 13.375 casing to a depth of 2158'. Allied cemented the casing in place by circulating 1826 sks of class A cement into place. I witnessed 60 bbl of cement returns to surface. The casing integrity pressure test passed. | ||||
-326386571 | 2014-07-29 | My inspection today finds Allied Oil and Gas Services just finished the 5.5 casing cement job. Patterson rig 343 ran 18070' of twenty pound 5.5 casing with centralizers placed on every other joint in the lateral section. Allied cemented the casing in place with 1970 sacks of class H cement. The cement report indicated that 70 barrels of a 262 barrel spacer were returned to surface indicating adequate cement coverage. | ||||
-422395062 | 2014-06-04 | My inspection today finds the Patterson Drilling rig 343 has drilled 12.35 hole to a depth of 7252'. They will run 9.625 casing to bottom and Halliburton will cement the casing in place. | ||||
97313257 | 2014-06-05 | My inspection today finds the rig ran 7251' of 9.625 casing. Halliburton is cementing the casing in place with Extendacem and Halcem. |
For data sources see[1]