If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-073-60201 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.59107262,"lon":-82.3412615,"icon":""}]} |
County: Hocking | |
Municipality: | |
Operator Name: SCHMELZER MARK | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Final Restoration | |
Violations: 0 | |
Latitude: 39.59107262 | |
Longitude: -82.3412615 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1269i350121 | 2001-01-16 | Follow up on NOV , Non - Complaince , company has a service rig on site, spoke to Chris Schmelzer , he will start plugging in a couple days. | ||||
1269i3550430 | 2001-01-29 | Chris Schmelzer said that after ripping 5 1/2 and washing in approx. 200' ft of clay, he pulled approx. 440'ft of casing and it pulled hard. After letting the well set over the weekend it had built up a small amount of gas. Chris was unable to pull 5 1/2 today so he ran in to approx. 900'ft and ripped off the casing again. He has not tried to pull today will wait till 1/30/00. I told Chris to wash in 50 to 75'ft of clay then pull 2 or 3 joints of casing, until he is finished. Chris said he wants to pull several joints at once. | ||||
1269i959 | 2002-04-12 | Final Restoration done. |
For data sources see[1]