If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24487 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.9136008,"lon":-81.31431444,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-05-17 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.9136008 | |
Longitude: -81.31431444 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2015-1 | 330654.0 | 90.0 | 12420.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1668165193 | 2014-08-14 | I am onsite to monitor the cementing operations on the production casing string. The drilling rig ran 15,246' of 5.5 casing. Allied cemented the casing in place with a 301 sack lead cement slurry of class H and Poz. in equal amounts. The tail cement consisted of 1300 sacks of class H cement. | ||||
-390723789 | 2015-02-11 | My inspection today finds the well site meets the preliminary restoration requirements. The tank battery is comprised of eight 500 barrel tanks set inside a liquid tight plastic liner. | ||||
-787824453 | 2014-05-18 | My inspection today finds Express drilled the well to 101' and ran 100' of 26 casing. Express Energy Services also cemented the casing in place by circulating 330 sks of class A cement. The mix water was sourced from a Caldwell municipal source. Chlorides tested below 250 ppm. I witnessed 19 bbl returns to surface. | ||||
889614485 | 2014-07-03 | My inspection today finds the drilling rig, Patterson 316, ran 400' of 18.625 casing. Halliburton cemented the casing in place with 820 sacks of Halcem |
For data sources see[2]