If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-103-25045 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.03044686,"lon":-81.87220856,"icon":""}]} |
County: Medina | |
Municipality: | |
Operator Name: BLEACH TECH LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-03-17 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Active Injection | |
Violations: 0 | |
Latitude: 41.03044686 | |
Longitude: -81.87220856 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1074224962 | 2014-03-06 | Visited location on 03/06/2014 for conductor casing cement job. The rig drilled a 20 hole to 197', and ran 16, 65# conductor casing to 178'. Rigged up Petroset to cement casing to surface. Cement job went well; 15 bbls good cement returns to surface. | ||||
-1143384001 | 2014-03-24 | Visited location on 03/24/2014 to witness the production casing cement job for the Bleachtech #11 well. An 11 hole was drilled to 2,440', and 8 5/8, 32#, New casing was run to 2,397'. Well was cemented to surface using 650 sxs of Class A cement with 2% gel and 6# gilsonite by Petroset Cementing Services. Cement job went well, and circulation was maintained throughout the job. 28 bbls of good cement returns were seen at surface. MIT Test was performed on the production casing. 500# was added to well after landing the plug and held for 15 minutes; no noticeable pressure was lost during test, so MIT test passed. Plan forward is to wait on cement, then drill out to TD. | ||||
-2088289401 | 2014-03-17 | Visited location on 03/17/2014 to witness the conductor casing cement job for the Bleachtech #11 well. A 20 hole was drilled to 180', and 16, 65#, New conductor casing was run to 168'. The well was cemented to surface with 200 sxs of Class A cement with 3% CaCl by Petroset Cementing Services. The cement job went well and good circulation was maintained throughout the job. 15 bbls of good cement returns were seen at surface. Plan forward is to wait on cement, then drill out the surface hole. | ||||
-230676482 | 2014-04-02 | Visited location on 04/02/2014 to top off wells with a mixture of mortar, quick-crete, and Portland cement. Cement had fallen approximately 4' - 8' on all casing strings. Mixture was hand-mixed on location and dumped down the annulus and filled up to surface. | ||||
-424819458 | 2014-10-23 | Visited location on 10/23/2014 to check on the restoration status of the well. The well is equipped for production; well identification is clearly displayed next to the wellhead. All pits have been closed and drilling equipment removed. Preliminary Restoration passes. | ||||
486588604 | 2014-03-19 | Visited location on 03/19/2014 to witness the surface casing cement job for the Bleachtech #11 well. An 11 3/4 hole was drilled to 660', and 11 3/4, 32#, New surface casing was run to 630'. Well was cemented to surface using 360 sxs of Class A cement with 3% CaCl by Petroset Cementing Services. The cement job went well, and circulation was maintained throughout the job. 15 bbls of good cement returns were seen at surface. Plan forward is to wait on cement, then drill out production hole. | ||||
603571178 | 2014-04-03 | Visited location on 04/03/2014 to witness logging job on the Bleachtech #11 well. The hole was loaded on 04/02/2014 with pit water (note: drilling operations had been completed the previous week, so solids in pit had settled out and water was taken from top of pit). Appalachian Well Services rigged up and logged the well. The logging tool was run without centralizers, as they were damaged on the previous run. This caused the collar locating tool to not work properly, but the VDL tool was not effected. The cement bond on the 8 5/8 casing looked excellent throughout the entire length of the string. |
For data sources see[1]