Well ID: 34-115-24667 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.60927721,"lon":-81.66708832,"icon":""}]} |
County: Morgan | |
Municipality: | |
Operator Name: PDC ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-05-03 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.60927721 | |
Longitude: -81.66708832 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 0.0 | 20.0 | ||||
2014-0 | 259.0 | 32.0 | 18.0 | 32.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1242974023 | 2012-08-27 | My inspection this day to find out what stage of completion well is in | ||||
1335543323 | 2012-04-26 | Dan Goins and I went in to meet with Jamie Haga of PDC. Location was being built and the rain shut the crew down. Stumps would be chiped up. | ||||
1337198169 | 2012-05-16 | Currently drilling at 805'. | ||||
1337614271 | 2012-05-10 | Moving in Dallas-Morris Drlg to drill well, setting rig up at this time. | ||||
1338639236 | 2012-05-22 | Cement returned to surface, plug down at 3:30 am. | ||||
1341602158 | 2012-07-06 | Kelly from Denver called today to let me know they would be flaring well starting Monday. Said they had fraced well on 7/3/12 - she said they did not know they had to notify us 24 hrs. in advance altho Dan Goins may have got notification | ||||
1342561544 | 2012-07-17 | My inspection this day to see progress of completion. I found flare still is not going, logging crew on location and swabbing well with that truck. Tubing has been run, frac tanks still all in place. They are swabbing water back into frac tank. Operator forgot to call before fracing, Mike says they used 7300 bbl water. | ||||
1348065044 | 2012-09-19 | I accompanied Dan Goins to check status on well and it was found to be shut in after fracing operation. Well head has christmas tree installed and site location is acceptable. 17 frac tanks are still on location. | ||||
1471068922 | 2012-05-07 | Main drilling rig moving in later in week. | ||||
1508255502 | 2012-05-22 | Witnessed 13 3/8 casing being ran for intermediate string. | ||||
-1568720626 | 2012-05-16 | Drill depth at time of inspection 805'ft. | ||||
1614498401 | 2012-05-14 | Cemented surface casing, had trouble installing cement head on casing. | ||||
-1638772768 | 2012-05-13 | Witnessed surface casing being ran into well. | ||||
-1802275045 | 2012-08-30 | I met with Jake Caplan this day and talked while watching the well be swabbed off. They started swabbing yesterday and will continue until tomorrow afternoon, hoping to get a show of oil or gas by then. 8/31/12 - still swabbing water, no hydrocarbons. Will continue into next week. | ||||
-1844743817 | 2012-05-22 | Witnessed 9 5/8 casing ran and cemented back to surface, ran 1901'ft with 2 baskets placed at 183'ft and 63'ft from surface. | ||||
-1914983700 | 2012-05-02 | Building well site, drilling rig moving in Thursday to set conductor. | ||||
-2132310721 | 2013-10-07 | Well is still shut in and gates have been constructed around the wellhead. There is no production equipment on site. PDC stated they are waiting on surveyor to get them a plat so they can proceed with getting horizontal permits. They are planning at this time to convert this well into a UIC well should they get the landowner's approval. If they do not then they will plug the well. | ||||
-674998381 | 2012-06-11 | Checked drilling rig at the depth of 7100'ft, will be running in 5 1/2 casing and cementing later today. | ||||
-760531403 | 2012-05-29 | Witnessed 9 5/8 casing being ran and set 5450'ft, cement returned to approx. 1000'ft from surface. | ||||
-806858658 | 2012-08-03 | Kelly from PDC called to say they will leave this well shut in for 30 days, possibly up to 100 days, in hopes of building pressure. | ||||
830104606 | 2013-01-08 | Upon inspection, I found all production equipment has been removed from location. The only thing on site is the wellhead equipped with christmas tree. Geologist from PDC stated they were waiting on Dominion pipeline. | ||||
-916290914 | 2013-12-11 | PDC has made the location ready for the arrival of the H & P 385 Flex Rig. They will be drilling three horizontals off of this pad. They have pulled the tubing, set two retrievable plugs, loaded the hole full of water, and installed a nightcap on this well in preparation for the new well activity. This was a temporary inactive well status checklist and there are no issues to report at this time. |
For data sources see[2]