34-029-21696

Well Details

Well ID: 34-029-21696
Loading map...
County: Columbiana
Municipality:
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-08-07
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.65513932
Longitude: -80.89168796

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2015-1 31070.0 7.0 0.0 7.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1376150712 2013-05-29 I went to the site and conducted a pre-construction site inspection with Cody Theimer and Matt Garrison, Chesapeake Field Representative, Blake Arthur and Brad Sellers of ODNR DOGRM, and landowner Sam Johnson.
1723475891 2013-08-21 I was at the site to witness the cementing of the surface casing. The drilling contractor, Nomac 74, spudded the surface section of the well on 08/20/2013. The 17.50 diameter surface hole was drilled to 675
-1952509671 2014-12-10 I was onsite to conduct a preliminary restoration inspection. There are two wells on the pad. Access road entry is on the south side of Lewis Road approximately 0.17 miles east of Emerick Road. There is a sign board at the entrance featuring the well names, permit numbers and emergency contact information. There is a cattle gate that is open midway up the access road. The access road is in good repair, and drainage and erosion controls are in place. Ground cover is well established along the access road. I found the drilling/production pad to be enclosed entirely with a chain link fence with barbed wire at the top, and with a padlocked gate. The pad has a crushed limestone surface, and is in good repair. The well is constructed with a
-1985401045 2013-08-08 I witnessed the cementing of the conductor casing. Precision Rathole drilled a 26 diameter hole to 72
2036627386 2013-08-20 I was at the site checking the drilling progress. I talked with drilling consultant Wesley Waycasher. The rig had spudded the surface hole this morning at 7:00am and was drilling the 17.50
-641615450 2013-08-06 I was at the site to check the progress on the conductor drilling operation. Precision Rathole was on location and in the process of drilling the conductor hole. A second rig was on site drilling the conductor hole for the Summitcrest 35-14-4 8H. In addition, a crew was on site installing a pad drainage system.
-64762760 2013-08-23 I went to the site to witness the cementing of the intermediate casing. The drilling contractor, Nomac 74, drilled a 12.25 diameter hole to 1710

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.