If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-029-21799 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.89147878,"lon":-80.79576033,"icon":""}]} |
County: Columbiana | |
Municipality: | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-06-15 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Well Drilled | |
Violations: 0 | |
Latitude: 40.89147878 | |
Longitude: -80.79576033 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-111819665 | 2012-11-16 | I went to the site and conducted a pre-construction site inspection with Steve Ault, Chesapeake Field Representative. | ||||
1372683018 | 2013-06-18 | I went to the site to witness the cementing of the intermediate casing. The drilling contractor, Nomac 43, drilled a 12.25 diameter hole to 1510 | ||||
-1495425853 | 2013-06-24 | I was at the site checking the drilling progress. Nomac 43 was drilling at 7113 | ||||
1724587061 | 2013-06-07 | I went to the site to witness the cementing of the mine string casing. The drilling contractor, Express Energy Services, had installed 60 | ||||
-1728459954 | 2013-06-29 | I was at the site to witness the cementing of the production casing. The drilling contractor, Nomac 43, drilled an 8.75 diameter hole from beneath the base of the intermediate casing at 1495.96 to 6850 | ||||
2014370236 | 2013-06-15 | I went to the site to witness the cementing of the surface casing. The drilling contractor, Nomac 43, spudded the well on 06/15/2013. The 17.50 diameter surface hole was drilled to 500 | ||||
323961220 | 2013-06-05 | I witnessed the cementing of the conductor casing. Express Energy Services drilled a 36 diameter hole to 61 | ||||
649678905 | 2013-06-06 | I was on location to check the status of the mine string being drilled on this location with an auger rig. A 30 conductor was set to 60' and they expected the mine void to be hit around 115' below the surface. The auger rig will drill the mine string and set 20 welded casing into the mine void. I had to leave the location for a surface cement job before I could witness the job. |
For data sources see[1]