If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-21474 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.74275734,"lon":-81.5863817,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: AVA GAS CORP | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1971-07-13 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.74275734 | |
Longitude: -81.5863817 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
1990-0 | 1166.0 | 0.0 | ||||
1992-0 | 2772.0 | 0.0 | ||||
1993-0 | 4842.0 | 0.0 | ||||
1994-0 | 1881.0 | 0.0 | ||||
1995-0 | 1309.0 | 0.0 | ||||
1996-0 | 800.0 | 0.0 | ||||
1997-0 | 655.0 | 0.0 | ||||
1998-0 | 393.0 | 0.0 | ||||
2005-0 | 100.0 | 0.0 | ||||
2008-0 | 123.0 | 0.0 | ||||
2009-0 | 579.0 | 0.0 | ||||
2010-0 | 312.0 | 0.0 | ||||
2011-0 | 478.0 | 0.0 | ||||
2012-0 | 531.0 | 0.0 | ||||
2013-0 | 0.0 | 0.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1128161158 | 2005-09-28 | No violations noted, well has been recently worked on operator will need to construct dike around tank when SPCC rules goes into effect.(open flow gas well with 1-100 bbl tank).no production reported on well since 1998. | Compliance Notice | |||
1128161158 | 2005-09-28 | No violations noted, well has been recently worked on operator will need to construct dike around tank when SPCC rules goes into effect.(open flow gas well with 1-100 bbl tank).no production reported on well since 1998. | Compliance Notice | |||
-1133666257 | 2010-11-08 | Follow Up Inspection to Chief's Order#2010-41 and inspection revealed that there has been no change in status of well. Owner is still operating wells without proper bonding and insurance. | ||||
1240679494 | 2010-10-19 | Inspection revealed that well is online and producing which is in violation of Chief's Order requiring owner to suspend production operations. | ||||
-1639560679 | 2009-12-01 | FOLLOW UP TO NOV # -434794548 Inspection revealed that owner is operation well without proper bonding and well needs to be properly I.D.'ed. | ||||
-183940415 | 2012-11-07 | My inspection today finds that the well appears to be online. The known master meter has a current chart in place. | ||||
-2022666650 | 2012-11-07 | Inspection revealed that well is in production and owner is operating well without proper bonding and insurance and photo's were taken of well and production meter site. | ||||
-434794548 | 2009-12-01 | Inspection revealed that owner is operation well without proper bonding and well needs to be properly I.D.'ed. | ||||
552547406 | 2009-12-10 | Follow up inspection revealed that there has been no change in status of well, owner has not replaced defaulted bond as of this date according to division records. | ||||
934653682 | 2009-11-19 | Inspection revealed that well is equipped with 8 surface casing and 4.5 production casing and 1-100 bbl tank&seperator,tank is in need of proper dike construction and proper I.D. placed on tank,valve at wellhead was in the open position on the day of my inspection.Note: 3 photo's were taken on the day of my inspection. |
For data sources see[2]