If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-23134 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.05236105,"lon":-80.56671619,"icon":""}]} |
County: Mahoning | |
Municipality: | |
Operator Name: BOCOR HOLDINGS, LLC/BOCOR PROD | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2010-10-07 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.05236105 | |
Longitude: -80.56671619 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2011-0 | 8994.0 | 0.0 | ||||
2012-0 | 3644.0 | 0.0 | ||||
2013-0 | 3156.0 | 0.0 | ||||
2014-0 | 2468.0 | 365.0 | 0.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1026961689 | 2010-11-01 | The drilling pits are closed and the debris has been removed. There were no violations at this time. | ||||
1286718089 | 2010-10-09 | I witnessed the running of the 8 5/8 casing and the cementing of the same. There were no violations at this time. | ||||
1286990237 | 2010-10-12 | I performed a rig inspection on G & H rig #91. The drilling depth was 4488' and drilling on soap and air. The BOP was tested before drilling out the cement for the surface job. The BOP was tested to 400 psi. and it held for 15 minutes. I did not witnesss the testing. This inspection satisfies 1501:9-9-03. There were no violations at this time. | ||||
1288111686 | 2010-10-25 | I witnessed the fracing of the Clinton zone. Universal preformed the fracing. There was 500 gal of 15% acid used for the perforating. 84877 gallons of fluid was used for the frac. ISIP was 1300psi. 5 minute pressure was 1074 psi. There were no violations at this time. | ||||
1302200775 | 2011-04-07 | No vegetation growth on the drilling location. The chain link fences are installed on the tank battery and the wellhead. The ID sign is posted. The drilling location is muddy. | ||||
-1390625517 | 2010-10-13 | I performed a rig inspection on G & H rig #91. The drilling depth was 5108'. The rig was drilling on soap and air. This inspection satisfies 1501:9-9-03. There were no violations at this time. | ||||
-409235052 | 2011-08-04 | Chain link fence installed around well head and tank battery. ID sign posted. Top soil graded out. Vegetation established. All drilling equipment removed from site. This well site satisfies ORC 1509.072. Preliminary restoration passed. No violations at this time. | ||||
-418774546 | 2010-11-03 | The top soil was spread over the drilling location. Not seeded yet. | ||||
-448378858 | 2010-10-09 | I performed a rig inspection on G & H drilling rig #91. The pits and pit liners in compliance. This inspection satisfies 1501:9-9-03. There were no violations at this time. | ||||
465464117 | 2010-12-29 | The fences were around the tank battery and the wellhead. The ID sign was posted. The drilling area is still in the rough grade. There were no violations at this time. | ||||
-650852008 | 2011-05-24 | There was vegetation growth on the drilling location. This well has PASSED PRELIMINARY RESTORATION. | ||||
-902805440 | 2010-10-18 | The drilling rig and debris were gone. The fluid level in the drilling pit was down 4 feet. The blow pit fluid level was down 5 feet. |
For data sources see[2]