If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24254 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.97487016,"lon":-81.26922669,"icon":""}]} |
County: Guernsey | |
Municipality: | |
Operator Name: R E GAS DEVELOPMENT LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-05-24 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.97487016 | |
Longitude: -81.26922669 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-12 | 143628.0 | 6760.0 | ||||
2014-1 | 300150.0 | 90.0 | 12533.0 | 90.0 | ||
2014-2 | 173190.0 | 91.0 | 3406.0 | 91.0 | ||
2014-3 | 137116.0 | 92.0 | 1632.0 | 92.0 | ||
2014-4 | 108400.0 | 92.0 | 984.0 | 92.0 | ||
2015-1 | 85213.0 | 90.0 | 754.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1621232036 | 2013-05-25 | On site to witness cement job on 13.375 casing drilling crew ran 704' of casing equipped with guide shoe and float collar and 5 centralizers and Universal cement it in place with 589 sacks of cement and they had 47 bbl of cement returns. | ||||
774193890 | 2015-02-25 | On the day of my inspection I witnessed the well was equipped with a production tree with valves in the open position. Production equipment included 6-400bbl brine tanks, 2-400bbl condensate tanks, a GP unit, a sand trap, a line heater along with a vapor recovery system all within containment. Identification was present and production records were current. | ||||
-873051599 | 2014-01-28 | The site passed preliminary restoration according to 1509.072A. |
For data sources see[2]