If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-059-24372 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.03928128,"lon":-81.2350197,"icon":""}]} |
| County: Guernsey | |
| Municipality: | |
| Operator Name: ECLIPSE RESOURCES I LP | |
| Well Pad ID: | |
| Farm/Lease Name: | |
| First Permit Date: | |
| Last Permit Date: | |
| Spud Date: 2014-09-06 | |
| Unconventional: | |
| Configuration: | |
| Well Status: Well Drilled | |
| Violations: 0 | |
| Latitude: 40.03928128 | |
| Longitude: -81.2350197 |
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
|---|---|---|---|---|---|---|
| 1034864827 | 2014-11-20 | On the day of my inspection I witnessed that H&P Drilling Rig #531 had drilled an 8.5 inch diameter lateral hole to the depth of 14550 feet. H&P ran and successfully cemented 14546 feet of 5.5 inch production casing. Site inspection revealed that H&P Drilling Rig #531 was walking the rig to the Wheeler 5H and the pits were being cleaned. H&P plans to begin drilling late tonight on the 17.5 Inch diameter surface hole. | ||||
| 1415132820 | 2014-11-04 | On the day of my inspection I witnessed H&P Drilling Rig #531 drilled a 17.5 inch diameter hole to the depth of 1384 feet and Franks Casing crew ran 1363 feet of 13.375 inch 54.5#/ft. J-55 Surface Casing washing the last joint down. Halliburton was on site and gained circulation and pumped 10bbls of gel, 10bbls of fresh water and cemented casing with1385 sacks of class A cement 15.6ppg, 1.19cuft/sk cement, verified by mud scales. Displaced cement with 204bbls of fresh water had good cement returns of 44bbls, plug was landed at 540psi and pressured to 1050psi for 5 minutes and the floats held. | ||||
| 1818739670 | 2015-04-17 | On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A. | ||||
| -307337884 | 2014-11-10 | On the day of my inspection I witnessed H&P Drilling Rig #531was sidetracking their intermediate borehole with a 12.25 inch diameter bit at a depth of 6590 feet around a 1000 foot kick plug that was set on Saturday with a planned td of 7180 feet. |
For data sources see[1]