X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-099-23204

Well Details

Well ID: 34-099-23204
Loading map...
County: Mahoning
Municipality:
Operator Name: DORFMAN PRODUCTION COMPANY
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-07-07
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.98647314
Longitude: -80.9644629

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2014-0 6794.0 149.0 1363.0 149.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1407785512 2014-07-09 I was on site to check on the drilling progress. The operator was working on rig maintenance while waiting on cement for surface casing. The lease road was stable. The pits were in good repair with sufficient freeboard. A water tight cellar had not yet been constructed. We advised the rig that a complete permit needs to be posted in the dog house.
1410963105 2014-07-08 Advent Drilling drilled a 14.750 hole to a total depth of 405' and ran 392' of 11.750 32# casing. Petroset loaded the hole with 15 barrels of fresh water and pumped 10 barrels of Gel and hulls followed by 300 sacks of class A cement. Displaced with 45 barrels of fresh water. Displacement was 372
-1612199155 2014-09-09 I performed a preliminary restoration inspection on the location The tank battery is equipped with one 100 barrel tank and one 50 barrel tank and one horizontal separator. The well is equipped with a pumping unit with an electric motor. ID signs are posted. Vegetation has not been established. Can not pass Preliminary Restoration at this time.
-1903583773 2014-07-10 Advent Drilling drilled a 11 well bore to a total depth of 615'. And ran 595 of 24# surface casing. Petroset loaded the hole with 4 barrels of fresh water and pumped 10 barrels of Gel with hulls followed by 200 sacks of class A cement. Dropped plug and displaced to a depth of 590' with 37.5 barrels of fresh water. Plug landed with 300 psi. There was 6 barrels of cement returned to surface. There was good circulation through out the job.
-2009516941 2014-10-04 I performed a preliminary restoration inspection on the location. The tank battery is equipped with one 100 barrel tank and one 50 barrel tank and one vertical separator. The well is equipped with a pumping unit with an electric motor. ID signs are posted. Vegetation has been established. Preliminary Restoration is Passed.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.