If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23980 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.18728244,"lon":-80.58948907,"icon":""}]} |
County: Trumbull | |
Municipality: | |
Operator Name: PAC DRILLING LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2008-11-18 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.18728244 | |
Longitude: -80.58948907 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2009-0 | 23725.0 | 506.0 | ||||
2010-0 | 20250.0 | 210.0 | ||||
2011-0 | 8649.0 | 203.0 | ||||
2012-0 | 4632.0 | 166.0 | ||||
2013-0 | 3414.0 | 134.0 | ||||
2014-0 | 3106.0 | 360.0 | 100.0 | 360.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1171353805 | 2014-10-22 | I was on location for a status check. During my inspection, I found the well in production. The well was equipped with a plunger lift assembly. The tank batter consisted of a 210 barrel production tank, a 50 barrel brine tank and a separator. There was a locked, chain link fence surrounding the tank battery. A dike surrounded the production equipment. Identification signs were posted at the well and tank battery. A bull plug was installed on the load line. The lease road was in stable condition. | ||||
-617676889 | 2011-09-27 | Preliminary Restoration meets all requirements. |
For data sources see[2]