If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24478 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.81837518,"lon":-81.3292561,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-03-29 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Well Drilled | |
Violations: 0 | |
Latitude: 39.81837518 | |
Longitude: -81.3292561 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
127114081 | 2014-03-30 | My inspection today finds Express Energy drilled 100' of 32 hole. Express ran 100' of 26 casing and cemented it in place with 330 sks of class A cement. The cement stayed at surface and circulation was maintained through out the job. | ||||
-1805995770 | 2014-05-14 | I am accompanied by Dylan Pendleton. Our inspection finds the rig is making up the directional tools to correct a 2.3 percent deviation in the well bore. The current depth is 1331'. | ||||
349833917 | 2014-08-13 | I am onsite to witness the cementing operations for the production casing string. The drilling rig, Patterson Drilling 343, ran 5.5 casing to a depth of 17,529'. Allied Oil and Gas Services cemented the casing in place with 1880 sacks of class H cement at a density of 15.2 pounds per gallon and a yield of 1.8 cubic feet per sack. | ||||
781873193 | 2014-05-11 | I am onsite to witness the surface casing cement operations. I tested the mix water with a Quantab and the water contained less than 250 ppm of chlorides. The casing was ran to a depth of 377' by Patterson rig 343. Allied cemented the casing in place by circulating 721 sks of class A cement into place. I verified the cement weight at 15.6 pounds. I witnessed 30 bbl of cement returns to surface. |
For data sources see[1]