Well ID: 34-089-26154 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.12863417,"lon":-82.64311862,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2015-12-10 | |
Unconventional: | |
Configuration: | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.12863417 | |
Longitude: -82.64311862 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
120029879 | 2014-12-01 | The operator has begun building the location. | ||||
-1237686128 | 2014-12-18 | I witnessed the cementing of the 4.5 production casing on PEP Drilling rig 10 for Enervest Operating. Universal Well Services was contracted to cement the casing. The cement ticket was received. No violations. | ||||
1289557716 | 2014-12-11 | I inspected drilling operations. PEP Drilling rig 10 drilling on fluid with 11 bit. Depth was approximately 460 feet. No violations. | ||||
1317796730 | 2014-12-03 | Inspect well location. The location has been constructed, contractor will excavate the air pit later today. Stone has been imported and stockpiled to construct drill pad but, has not been spread onto location. | ||||
1417007097 | 2014-11-24 | Met with the company at the location site today they are preparing to build the location to start the new well. | ||||
1420576425 | 2014-12-10 | Inspect drilling operations. PEP Drilling preparing to spud well. Rig was still being constructed during inspection. | ||||
1421089810 | 2014-12-16 | Inspect drilling operations. PEP Drilling rig 10 drilling during inspection. No violations. | ||||
1421157745 | 2014-12-29 | Inspect drilling location. The well has been drilled and rig has left. Greg Wycoff with Energy Corp. was mixing fly ash in pits during inspection. No violations. | ||||
1753567830 | 2014-12-03 | The operator is finishing building the well pad. | ||||
-2120617056 | 2015-03-12 | This inspection was conducted as a status check. The well was equipped with a pumping unit and motor. It was pumping during inspection. The tank battery consists of (1) 210 barrel tank, (1) 1200 gallon plastic tank, and separator inside an earthen dike. Identification is posted at the well and tank battery. Time of inspection: 9:00 AM. Weather: 35*F, Sunny | ||||
373730433 | 2014-12-05 | The location is built: waiting on drilling rig. Well name and emergency contact information is posted at the entrance. Pits dug, lined and fenced. Three water tanks are on location and silt fences surround the well pad. | ||||
484026082 | 2014-12-09 | PEP Drilling rigging up during inspection. Will spud on 12-10-2014. | ||||
-547284181 | 2014-12-17 | Inspect drilling operations. PEP Drilling rig 10 drilling on fluid with 7.88 PDC bit. No violations during inspection. | ||||
619721019 | 2014-11-28 | The operator is currently clearing and logging the location in preparation for the drill rig. | ||||
668096689 | 2015-05-21 | Inspect location. No change in status. Accompanied by Division intern Brittany Hupp. Restoration is not complete. Time of inspection: 2:25 PM. Weather: 57*F, Cloudy | ||||
750405371 | 2014-12-12 | I witnessed the testing of the BOP on PEP Drilling rig 10. PEP pressured up to 500 psi and held for 30 minutes with zero loss of pressure. | ||||
776540415 | 2014-12-11 | I witnessed the cementing of the 8 surface casing on PEP Drilling rig 10 for Evervest Operating. Gavin Reed was on location for Evervest. Universal Well Service contracted to cement casing. Circulation was achieved and good cement returns were observed. A cement basket was not used. The cement ticket was received. | ||||
-827682836 | 2015-01-08 | Inspect well as part of a status check. The well was acidized on 1-7-2015. Chipco service rig on well. Enervest preparing to flowback well. Inspection revealed the wellhead was froze and unable to flowback. Temperatures were below zero over night. Enervest was working on thawing wellhead during inspection. Inspection revealed the pits have been closed. | ||||
-995608402 | 2014-12-05 | Location Information for the Adams R. Unit #1 (#6154). WELL STAKE: Lat. 40.12863 Long. -82.64314 / ENTRANCE: Lat. 40.13086 Long. -82.64363. |
For data sources see[1]