If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21346 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.28105447,"lon":-81.06423632,"icon":""}]} |
County: Harrison | |
Municipality: | |
Operator Name: HESS OHIO DEVELOPMENTS LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-08-07 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Well Drilled | |
Violations: 0 | |
Latitude: 40.28105447 | |
Longitude: -81.06423632 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1407844440 | 2014-08-10 | I am on site today to witness the running and the cementing of the 18-5/8 inch diameter casing string. HAD Drilling drilled a 22-1/2 inch diameter hole to 330 ft. and set 322 ft. of casing. Halliburton Energy Service cemented with 350 sacks of class A cement at 15.6 lb and a yield of 1.20 and had 19 bbls of good cement returns. | ||||
1421851678 | 2015-01-21 | I am on site today to witness the running and the cementing of the 9-5/8 inch diameter casings. H&P Drilling Rig # 287 drilled a 12-1/4 inch diameter hole to 7650 ft. and set 7640 ft. of 40 lb. casing. Halliburton Energy Service cemented with 990 sacks of class A cement as a lead cement at 12 lb. and a yield of 2.55 followed with a tail of 320 sacks of class A cement at 13.5 lb. and a yield of 1.55 and had 50 bbl. Of cement returns. |
For data sources see[1]